Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, all entries  Not logged in ELOG logo
ID Date Author Groupdown Subject Text Attachments
  12   30 Jan 2023, 15:21 Maurizio VannoniXROSASE3 Summary of Maintenance Period and Ramp up activitiesSASE3
Summary of Maintenance Period and Ramp up
activities
  
  10   30 Jan 2023, 16:31 Maurizio VannoniXROSASE1 Summary of Maintenance Period and Ramp up activitiesSASE1
Summary of Maintenance Period and Ramp up
activities
  
  11   30 Jan 2023, 19:06 Maurizio VannoniXROSASE2 Summary of Maintenance Period and Ramp up activitiesSASE2 Summary of Maintenance
Period and Ramp up activities

Maintenance
 Screenshot_2023-01-30_at_19.27.42.png 
  137   16 Apr 2023, 07:00 Maurizio VannoniXROShift summaryUpdate of the damage tests at SQS.

Yesterday (15.04) SQS staff created
a focused beam on our sample using a small
  
  138   16 Apr 2023, 15:35 Silja SchmidtchenXROShift summaryshift summary from Saturday 15.04.2023:

Tasks:

- Calibration of Euler MDL
  
  205   13 May 2023, 22:18 Maurizio VannoniXRO14.8 keV SPB 2mrad AlignmentMirror positions and beam position on the
imagers for 14.8 keV SPB, 2mrad

ATTENTION: the alignment was difficult
 6x 
  264   19 Jul 2023, 12:34 Antje TrappXROALL RY MOTORS ARE IN MICROMETER SCALINGThis has several implications:

- ALL PREVIOUSLY SAVED RY POSITIONS
ARE OBSOLETE!
  
  265   19 Jul 2023, 20:09 Mikako MakitaXROShift summary: 19. JulySummary of today's activity:


Beam handover ~ 3pm.
SA2
mirror set tp B4C.
SA2 Rough alignment
 8x 
  269   20 Jul 2023, 18:17 Kelin TascaXROSPB beam alignment 1 keV 2 mrad   2023-07-20_16-46-47_beam_on_SPB_after_pointing.pngFEL__2023-07-20_16-42-57.png 
  266   20 Jul 2023, 18:20 Antje TrappXROShift summary of SASE2 alignmentMirror pitch motors Ry were tested after
scaling was changed to um.

Tx and Ry motor positions were
  
  268   20 Jul 2023, 18:23 Kelin TascaXROFXE beam alignment 9 keV 2 mrad   2023-07-20_17-34-11_SA1_FXE_alignment.png2023-07-20_17-10-45_SRA.png 
  267   20 Jul 2023, 20:21 Kelin TascaXROShift summary of SASE1 alignmentBeam aligned to SPB Pop-In https://in.xfel.eu/elog/XRO+Beam+Commissioning/185

Beam aligned to FXE Pop-In https://in.xfel.eu/elog/XRO+Beam+Commissioning/187

Vibration tests: https://in.xfel.eu/elog/XRO+Beam+Commissioning/188
  
  270   21 Jul 2023, 16:54 Antje TrappXROBeam aligned to HEDPosition stored in XRO setpoints - F and
HED setpoints - A
 2023-07-21_16-52-28_HED-final-position.png 
  271   21 Jul 2023, 17:22 Kelin TascaXROSummary of SA1 shift for XO and instrumentsPBLM checked:  https://in.xfel.eu/elog/XRO+Beam+Commissioning/203

Solid attenuators checked: https://in.xfel.eu/elog/XRO+Beam+Commissioning/194
  
  272   21 Jul 2023, 20:31 Silja SchmidtchenXROShift Summary SA2Alignment to HED: https://in.xfel.eu/elog/XRO+Beam+Commissioning/205

SA2 - divergence with various M2
bender positions  HED - https://in.xfel.eu/elog/XRO+Beam+Commissioning/200
  
  381   02 Oct 2023, 21:48 Antje TrappXROM3 vertical motors calibration - EulerMDLSecond iteration and sanitty test for vertical
mirror motion (Y) and vertical beam alignment
(ROLL)
 HED_beam_2023-10-03_16-54-31.pngM3_setpoints_2023-10-03_16-52-53.png 
  382   03 Oct 2023, 22:51 Antje TrappXROEuler calibration and Mirror setpointseuler MDL was calibrated for all three
mirrors.

Optics setpoints saved in XRO setpoints
 HED_Pt_M3_B4C_2023-10-03_22-53-10.pngMID_Pt_stripe_2023-10-03_22-48-46.png 
  383   03 Oct 2023, 22:58 Harald SinnXROShift endEnd of Euler shift: all 3 SASE2 mirrors
are now working with the Euler MDL.

We left the beamline aligned to
  
  442   10 Nov 2023, 14:10 Antje TrappXROEuler MDL bugfix - motor velocities restored after stopThe Euler MDL was updated, so that velocities
are restored to standard values also after
the stop button was hit before motion was
  
  465   24 Jan 2024, 14:00 Antje TrappXROscanning for HED beamWe found reflection of M3 on M2 popin,
but could not locate the beam on HED PBLM
nor HED_XTD6_SDLBM-1
 scanning-vertical-horizontal_2024-01-24_13-59-55.pngsdlbm_2024-01-24_14-12-12.pngScreenshot_from_2024-01-24_15-28-26.pngmirror-motors__2024-01-24_15-32-14.png 
  466   25 Jan 2024, 14:57 Antje TrappXROend of shift summaryIt was possible to align to HED in parasitic
mode to seeding tests

mirror horizontal position (coating
  
  467   26 Jan 2024, 15:24 Antje TrappXROend of shift summaryVertical motors of M3 now calibrated in
first iteration and gemetrical neutral calibrated
to 0 in motor settings!!!
  
  468   26 Nov 2022, 10:40 Wolfgang FreundXPDDiamond detector / DDM commissioningbeam: 30 keV / 30 uJ
reduce to single bunch for insertion
put FEL imager in
 DDM_inserted_Screenshot_from_2022-11-26_13-10-03.pngDD_2_pulses_IMGFEL_Screenshot_from_2022-11-26_13-32-47.png2022-11-26T17_20_00-01.pngDD_27keV_Screenshot_from_2022-11-26_18-12-30.png2022-11-26T17_11_18-00_orbit_kick_for_run_40.png 
  1   16 Jan 2023, 11:33 Theophilos MaltezopoulosXPDStatusI started the upstream XGMs in XTD2, XTD1,
and XTD10.
  
  5   21 Jan 2023, 16:38 Jan GruenertXPDAnalyze and quantify the mispositioning of the new 4mm-aperture behind the undulatorGoal: Analyze and quantify the
mispositioning of the new 4mm-aperture behind
the undulator
 JG_2023-01-21_16-06-48.pngJG_IMGFEL_2023-01-21_16-21-01.pngIMGFEL_no_cross_2023-01-21_16-27-22.pngIMGFEL_with_cross_2023-01-21_16-30-16.png 
  20   08 Feb 2023, 11:14 Andreas KochXPDSA3 statusBunch number control - SA3 FEL
imager

As announced today in the XO meeting
 Bunch_number_control_SA3_FEL_imager.PNG 
  100   23 Mar 2023, 13:07 Naresh KujalaXPDStatusUpdate for elog 99:

Now Gotthard timing is changed
to new setting for 0.5 MHz.
 Screenshot_from_2023-03-23_13-04-58.pngScreenshot_from_2023-03-23_13-17-05.png 
  133   10 Apr 2023, 02:16 Jan GruenertXPDSPB_XTD9_IMGPII45 lost steps - REPAIREDREPAIRED / FIXED

Problem: The imager
SPB_XTD9_IMGPII45 insertion motor lost
  
  132   10 Apr 2023, 02:25 Jan GruenertXPDIssueREPAIRED / FIXED

Problem: The imager
SPB_XTD9_IMGPII45 insertion motor lost
  
  135   13 Apr 2023, 15:29 Andreas KochXPDIssueTrigger issue
with SXP_XTD10_IMGES - Exit Slit imager

The external trigger of the Navitar
  
  136   13 Apr 2023, 15:57 Jan GruenertXPDShift endEnd of Diamond Sensor Study

We leave the SASE2 beamline in
the following safe state:
  
  227   06 Jun 2023, 08:28 Naresh KujalaXPDStatusSA2 photon beamline

- SRA position were 7 mm x
7 mm, MID reported they see the hallow of
 SRA-Before_changing_1.PNGSRA-after_changing.PNG 
  262   19 Jun 2023, 09:37 Jan GruenertXPDShift startRampdown day activities

The main focus is as usual on checking
all tunnel components and to identify any
  
  263   21 Jun 2023, 15:12 Andreas KochXPDNew screens installed in FEL imager SA3YAG screen
The damaged screen "YAG2"
with Al coating had marks and had been exchanged.
  
  387   13 Oct 2023, 10:19 Theophilos MaltezopoulosXPDIssueAn XGM has two single-shot detectors, XGMD
and HAMP.

The XTD2 XGMD amplifiers are damaged,
  
  443   10 Nov 2023, 17:39 Jan GruenertXPDSA2 statusEnd of 30 keV study

The machine finished their attemps
for 30 keV tuning while using NEPAL injector
 JG_2023-11-10_um_17.55.00.png 
  464   28 Nov 2023, 19:36 Jan GruenertXPDStatusRamp down activities completed
by XPD. References:


SASE1

https://in.xfel.eu/elog/SASE1+technical+commissioning/2204
https://in.xfel.eu/elog/SASE1+technical+commissioning/2205
https://in.xfel.eu/elog/SASE1+technical+commissioning/2206


SASE2

https://in.xfel.eu/elog/SASE2+technical+commissioning/1206
...until...
https://in.xfel.eu/elog/SASE2+technical+commissioning/1209


SASE3

https://in.xfel.eu/elog/SASE3+technical+commissioning/2220
https://in.xfel.eu/elog/SASE3+technical+commissioning/2221




The
  
  35   16 Feb 2023, 14:04 Frederik Wolff-FabrisXOSA2 statusData for the Horizontal jitter at the HED
Pop-In was observed during beam delivery
on cw05 (03-05.Feb) and cw07 (14-16.Feb)
 HED_PopinX_cw05_23.pngHED_PopinX_cw07_23.png 
  202   12 May 2023, 16:12 Frederik Wolff-FabrisXOSA3 statusThe SA3 EPS power limit at the Big brother
was disabled to allow photon energy scans
in SQS (due to Kr resonance at XGM, invalid
  
  237   09 Jun 2023, 15:41 Raúl Villanueva-GuerreroVACVacuum Leak in SA2-XTD1 Solid Attenuator - [SOLVED] - Preliminary reportDear all,

After the incidences reported yesterday
and the diagnostic remotely done (where we
  
  103   24 Mar 2023, 18:27 Tommaso MazzaSQSStability Issuethe pulse energy in XTD10 is lowered by
~30% when SASE1 changes photon energy, compare
att. 1 and 2.
 Screenshot_from_2023-03-24_18-25-31.pngScreenshot_from_2023-03-24_18-26-18.png 
  167   30 Apr 2023, 09:01 Tommaso MazzaSQSStability Issuechanging SA3 mono from grating to blank
while having the und to mono synchronization
running apparently caused the und photon
 Screenshot_from_2023-04-30_09-11-58.png 
  204   14 May 2023, 05:33 Tommaso MazzaSQSIssueSA3 GATT has trouble in setting the pressure
at ~0.5mbar. setting any value between 0.5
and 0.6 will have it settle around 0.48.
 Screenshot_from_2023-05-14_08-19-46.png 
  225   05 Jun 2023, 06:45 Tommaso MazzaSQSIssuearound 6:15, the lights as the one shown
in the attachment turned on by themselves
in the control hutch. after some minutes,
 1685940280680.jpg 
  322   25 Aug 2023, 07:29 Tommaso MazzaSQSShift summaryproblems with machine operation

very low yield at 1.8keV, took
~2hrs tuning time to get 600uJ (linear taper)
 Screenshot_from_2023-08-25_02-31-19.png 
  13   02 Feb 2023, 06:37 Chan KimSPBIssueSPB_IRU_DPA/MOTOR issue

X stage looks okay, but Y, AX,
and AY values have been changed by 2-3mm.
 Screenshot_from_2023-02-02_06-09-52.pngScreenshot_from_2023-02-02_06-11-30.pngScreenshot_from_2023-02-02_06-17-24.pngScreenshot_from_2023-02-02_06-30-00.pngScreenshot_from_2023-02-02_06-31-44.png 
  22   09 Feb 2023, 07:14 Jayanath KoliyaduSPBShift endX-ray delivery


9.3 keV, 1-85 pulses, 1.3
mJ, stable delivery


Optical
  
  23   10 Feb 2023, 08:17 Jayanath KoliyaduSPBShift end

X-ray delivery


9.3 keV, 1-85 pulses, 1
  
  25   11 Feb 2023, 07:06 Jayanath KoliyaduSPBShift endX-ray delivery


9.3 keV, 1-85 pulses, 1
mJ, stable delivery


Optical
  
  28   12 Feb 2023, 06:53 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 1-85 pulses, 1
mJ, stable delivery


Optical
  
  29   13 Feb 2023, 07:17 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 1-85 pulses, 1
mJ, stable delivery


Optical
  
  34   16 Feb 2023, 07:17 Chan KimSPBShift summaryShift summary 15.2.2023 (Wednesday)

X-ray delivery


9.3 keV, 1-200 pulses,
  
  36   16 Feb 2023, 23:15 Chan KimSPBShift summaryX-ray delivery


9.3 keV, 1-120 pulses


Optical
laser delivery
  
  42   19 Feb 2023, 00:34 Richard BeanSPBShift summaryX-ray delivery


 9.3 keV, 1-120 pulses,
good
stabiltiy, lowish flux ~900uJ, but experimental
  
  46   19 Feb 2023, 23:28 Richard BeanSPBShift summaryX-ray delivery


9.3 keV, 120 pulses
Good
Beam Stability -~1mJ


Achievements/Observations
  
  54   24 Feb 2023, 05:39 Adam RoundSPBShift summaryStaff: AR, KK

X-ray delivery


9.3keV


Optical
  
  58   28 Feb 2023, 07:17 Romain LetrunSPBIssueIn the public status display, it looks
like FXE is taking the beam even though their
shutter is closed.
 Screenshot_at_2023-02-28_06-38-30.png 
  59   28 Feb 2023, 23:24 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 1-352 pulses,
0.8 mJ, stable delivery


Optical
  
  61   01 Mar 2023, 23:25 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 1-352 pulses,
0.8 mJ, stable delivery


Optical
  
  65   02 Mar 2023, 23:13 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 202 pulses, X-ray
intensity had slope over train, 30 % difference
 Screenshot_from_2023-03-02_21-53-17.png 
  69   03 Mar 2023, 23:27 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 202 pulses, 564
kHz, intensity slope was flat


Optical
  
  71   04 Mar 2023, 22:55 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 202 pulses, 564
kHz, intensity slope was fine


Optical
  
  74   05 Mar 2023, 23:13 Juncheng ESPBShift summaryX-ray delivery


9.3 keV, 202 pulses, 564
kHz, intensity slope was fine


Optical
  
  91   21 Mar 2023, 23:36 Jayanath KoliyaduSPBShift endStaff: JB, PV, TS, RL, RdW, JK, AR

X-ray delivery


1-165 pulses, 1.1 MHz,
  
  94   22 Mar 2023, 21:49 Adam RoundSPBShift endX-ray delivery


9 keV 1 to 165 pulses ~
300 mj per pulse - stable delivery during
  
  99   23 Mar 2023, 11:38 Romain LetrunSPBIssueWhen using 1.13 MHz X-ray repetition rate,
SASE1 HIREX is capturing two pulses in a
single frame giving the impression that there
 20230323_HIREX_integral.png20230323_HIREX_mean_spectrum.png20230323_HIREX_peaks.png 
  101   23 Mar 2023, 14:31 Romain LetrunSPBStatusAfter SASE1 HIREX GOTTHARD reconfiguration,
we now get a single pulse per frame. This
was verified by comparing data from HIREX
 20230323_HIREX_integral2.png20230323_HIREX_mean_spectrum2.png20230323_HIREX_peaks2.png 
  102   23 Mar 2023, 23:24 Jayanath KoliyaduSPBShift endX-ray delivery


1-165 pulses, 1.1 MHz -
28.2 kHz, upto 400  uJ @ 50 pC


Optical
  
  105   24 Mar 2023, 23:14 Jayanath KoliyaduSPBShift endX-ray delivery


1-165 pulses, 1.1 MHz -
28.2 kHz, upto 350  uJ @ 50 pC


Optical
  
  107   25 Mar 2023, 23:18 Jayanath KoliyaduSPBShift endX-ray delivery


1-165 pulses, 1.1 MHz -
56.4 kHz, upto 350  uJ @ 50 pC


Optical
  
  110   26 Mar 2023, 23:27 Jayanath KoliyaduSPBShift endX-ray delivery


1-165 pulses, 1.1 MHz -
56.4 kHz, upto 350  uJ @ 50 pC


Optical
  
  115   30 Mar 2023, 06:53 Tokushi SatoSPBShift summaryX-ray delivery


1-202 pulses, 564,
282, 141 kHz, stable delivery


Optical
  
  118   31 Mar 2023, 06:59 Tokushi SatoSPBShift summaryX-ray delivery


1-202 pulses, 564,
282, 141 , 70.5 kHz, stable delivery


Optical
  
  119   01 Apr 2023, 06:51 Tokushi SatoSPBShift summaryX-ray delivery


1-202 pulses, 564 kHz,
stable delivery
Beam was down
  
  126   07 Apr 2023, 23:03 Johan BieleckiSPBShift summaryBeam delivery for proposal 3378

Achievements/Observations


Collected data on liquid
  
  129   08 Apr 2023, 22:52 Johan BieleckiSPBShift summaryBeam delivery for proposal 3378

Achievements/Observations


Collected large amounts
  
  142   19 Apr 2023, 07:04 Romain LetrunSPBShift summaryX-ray delivery


12.0 keV, 1.3 mJ, 1-168
pulses @ 564 kHz
Decaying intensity
  
  146   20 Apr 2023, 06:58 Romain LetrunSPBShift summaryX-ray delivery


12.0 keV, 1.3 mJ, 1-168
pulses @ 564 kHz.
Stable delivery.


Optical
  
  150   21 Apr 2023, 04:33 Romain LetrunSPBShift summaryX-ray delivery


12.0 keV, 1.3 mJ, 1-168
pulses @ 564 kHz
Cryo issue at
  
  157   26 Apr 2023, 01:03 Richard BeanSPBShift summarySPB/SFX User shift 1 3333

X-ray delivery



9.3 keV, 1.7 mJ,
  
  159   27 Apr 2023, 00:07 Chan KimSPBShift summarySPB/SFX User Proposal 3333 Shift 2 Summary

X-ray delivery



9.3 keV, 1.7 mJ,
  
  161   27 Apr 2023, 23:33 Richard BeanSPBShift summarySPB/SFX PCS user proposals (day 1)

X-ray delivery


9.3 keV, 1600 uJ/ pulse


Achievements/Observations
  
  165   28 Apr 2023, 21:55 Richard BeanSPBShift summarySPB/SFX In-house research 4978 

X-ray delivery


9.3 keV 202 pulses / train,
  
  166   29 Apr 2023, 22:00 Richard BeanSPBShift summarySPB/SFX In-house research 4978 shift 2

X-ray delivery


9.3 keV 202 pulses / train,
  
  168   30 Apr 2023, 21:59 Raphael de WijnSPBShift summarySPB/SFX In-house research 4978 shift 3
- end

X-ray delivery
  
  173   04 May 2023, 06:41 Tokushi SatoSPBShift summaryX-ray delivery


12.4 keV 200 pulses / train,
relatively stable intensity ~0.8 mJ / pulse
took
  
  176   05 May 2023, 00:50 Tokushi SatoSPBIssueLaser synchronization is gone, unlocked
from 04.05.2023, 22.47. E-mail was sent to
lbsync-expert@desy.de and c.c. to las-op@xfel.eu.
 Screenshot_from_2023-05-05_00-31-48_1.png 
  178   05 May 2023, 06:44 Tokushi SatoSPBShift summaryX-ray delivery


12.4 keV 200 pulses / train,
relatively stable intensity ~0.8 mJ / pulse


Optical
  
  185   06 May 2023, 06:55 Tokushi SatoSPBShift summaryX-ray delivery


12.4 keV 200 pulses / train,
relatively stable intensity ~1.2 mJ / pulse


Optical
  
  196   09 May 2023, 23:09 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.8 mJ, 202 pulses
most fo the day. Pronounced (~30-40%) slope
  
  198   10 May 2023, 23:23 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.6 mJ, 202 pulses
msot of the day.
Slope across
  
  201   11 May 2023, 23:48 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.4-1.8 mJ and
12 keV, 1.1 mJ. 202 pulses most of the day.
Reduced
  
  203   12 May 2023, 23:21 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.8 mJ, 202 pulses
most of the day.
Attempted tuning
  
  206   18 May 2023, 18:41 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, ~1 mJ, 1-30 pulses,
stable delivery


Optical
  
  207   19 May 2023, 18:39 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 800 uJ, 1-200
pulses, stable delivery


Optical
  
  208   21 May 2023, 18:38 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 800 uJ, 1-200
pulses, stable delivery


Optical
  
  210   25 May 2023, 06:35 Tokushi SatoSPBShift summaryX-ray delivery


10.7 keV, 1.2 mJ,
1-200 pulses, stable delivery


Optical
  
  213   30 May 2023, 23:02 Romain LetrunSPBShift summaryX-ray delivery


10.7 keV, up to 339 pulses
at 1.1 MHz.
Large slope through
  
  215   31 May 2023, 23:15 Romain LetrunSPBShift summaryX-ray delivery


10.65 keV, 128 pulses at
1.13 MHz and 16 pusles at 141 kHz.
Slope
  
  217   01 Jun 2023, 23:27 Romain LetrunSPBShift summaryX-ray delivery


10.65 keV, 128 pulses at
1.13 MHz and 16 pusles at 141 kHz.
Overall
  
  219   02 Jun 2023, 23:34 Romain LetrunSPBShift summaryX-ray delivery


10.65 keV, 128 pulses at
1.13 MHz, 1.6-1.7 mJ.
Overall
  
  222   03 Jun 2023, 23:40 Romain LetrunSPBShift summaryX-ray delivery


10.65 keV, up to 339 pulses
at 1.13 MHz, 1.6-1.8 mJ.
12.4
  
  224   04 Jun 2023, 21:17 Romain LetrunSPBShift summaryX-ray delivery


12.2-12.45 keV, up to 339
pulses at 1.13 MHz, 0.8-1.2 mJ.
Couple
  
  235   09 Jun 2023, 07:05 Adam RoundSPBShift summaryStaff: DZ, AR, MK

X-ray delivery


12.42 keV 169 pulses for
  
  240   10 Jun 2023, 06:55 Chan KimSPBShift summaryX-ray delivery


12.42 keV, 0.8 mJ/pulse,
stable delivery


Optical
  
  246   11 Jun 2023, 07:28 Chan KimSPBShift summaryX-ray delivery


12.42 keV, 0.65 mJ/pulse,
low pulse energy but mostly stable delivery


Optical
  
  250   12 Jun 2023, 07:16 Chan KimSPBShift summaryX-ray delivery


12.42 keV, stable delivery
with slightly less than 1.0 mJ/pulse (~0.95
  
  255   15 Jun 2023, 23:08 Johan BieleckiSPBShift summaryX-ray delivery


12.42 keV, stable delivery
in single pulse mode with 1.9 mJ/pulse


Optical
  
  257   16 Jun 2023, 11:42 Abhisakh SarmaSPBStatusBeam is back at around 11:30 pm

We lost 1 hr 30 min of beam time.(it
was promised to get back at around 10:00
 Screenshot_from_2023-06-16_11-41-39.png 
  260   18 Jun 2023, 07:31 Adam RoundSPBShift endposting for 17th June

Staff: AR, AS, FK, HH, JB, KK,
DZ, MK
  
  280   29 Jul 2023, 23:46 Adam RoundSPBShift endX-ray delivery


12.4 keV, up tp 352 pulses
but the intensity drop across the train was
  
  288   05 Aug 2023, 08:20 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1-202 pulses at
1.13 MHz, 1.9-2.1 mJ.
Overall
  
  293   08 Aug 2023, 22:57 Jayanath KoliyaduSPBShift endX-ray delivery


9.3 keV, ~ 2 mJ, stable
delivery except for the intensity slope along
  
  296   10 Aug 2023, 07:22 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, up to 181 pulses
at 564 kHz, ~1.8 mJ. Overall stable delivery.


Optical
  
  299   11 Aug 2023, 07:16 Romain LetrunSPBShift summaryShift summary for 10.8.2023

X-ray delivery


9.3 keV, up to 181 pulses
  
  301   12 Aug 2023, 07:12 Romain LetrunSPBShift summaryShift summary for 11.8.2023

 

X-ray delivery
  
  302   12 Aug 2023, 07:19 Romain LetrunSPBIssuePotentially damaged 1.2 mm CVD in XTD2
attenuator. This feature was not present
earlier in the week.
 Screenshot_from_2023-08-12_07-10-24.pngScreenshot_from_2023-08-12_07-10-32.png 
  303   12 Aug 2023, 22:50 Jayanath KoliyaduSPBShift endX-ray delivery


9.3 keV, up to 181 pulses
at 564 kHz, 1.8 - 1.9 mJ


Optical
  
  304   13 Aug 2023, 21:33 Jayanath KoliyaduSPBShift endX-ray delivery


9.3 keV, up to 181 pulses
at 564 kHz, 8 - 1.3 mJ
Issue with
  
  318   22 Aug 2023, 23:32 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 178 pulses
at 564 kHz, 3.7  mJ, stable delivery
Beam
  
  319   23 Aug 2023, 22:56 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 3.7  mJ, beam intensity
  
  320   24 Aug 2023, 22:51 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 3.7  mJ, stable delivery


Optical
  
  323   25 Aug 2023, 23:03 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 2.7  mJ, stable delivery


Optical
  
  327   27 Aug 2023, 23:09 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 2.4  mJ, stable delivery


Optical
  
  329   28 Aug 2023, 23:03 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 2.3  mJ, stable delivery


Optical
  
  341   13 Sep 2023, 02:18 Tokushi SatoSPBShift summaryX-ray delivery


0.5 mj, improved to 1.1
mj xray energy in the evening


Optical
  
  342   14 Sep 2023, 00:05 Tokushi SatoSPBShift summaryX-ray delivery


1.1 mj, 564 kHz, 93 pulses,
stable delivery


Optical
  
  344   14 Sep 2023, 23:03 Tokushi SatoSPBShift summaryX-ray delivery


1.1 mj, 564 kHz, 93 pulses,
stable delivery


Optical
  
  345   15 Sep 2023, 14:54 Chan KimSPBIssueVacuum issue at XTD2 tunnel which might
be triggered by SA1_XTD2_ATT Arm5 (1.2mm
thick CVD diamond)
 Screenshot_from_2023-09-15_14-51-56.pngScreenshot_from_2023-09-15_15-06-49.png 
  348   20 Sep 2023, 02:09 Jayanath KoliyaduSPBShift endX-ray delivery


7 keV, 2.1 mJ, stable delivery


Optical
laser delivery
  
  353   22 Sep 2023, 07:27 Raphael de WijnSPBShift summaryX-ray delivery


7 keV, 202 pulses, 564
kHz, ~1.3 mJ, stable delivery


Optical
  
  355   23 Sep 2023, 07:04 Adam RoundSPBShift endStaff:JK, RDW, AR

X-ray delivery


7 keV 202 pulses 1.7mJ
  
  364   24 Sep 2023, 07:28 Raphael de WijnSPBShift summaryX-ray delivery


7 keV 202 pulses 1.6mJ
stabel across train and throughout the shift
Beam
  
  369   27 Sep 2023, 07:24 Romain LetrunSPBShift summaryShift summary for 26.9.2023

X-ray delivery


6.3 keV, ~4 mJ, 1-352 pulses
  
  371   28 Sep 2023, 07:20 Romain LetrunSPBShift summaryShift summary for 27.9.2023

X-ray delivery


6.3 keV, 3-4 mJ/pulse,
  
  373   29 Sep 2023, 08:30 Romain LetrunSPBShift summaryShift sumary for 29.9.2023

 

X-ray delivery
  
  375   29 Sep 2023, 23:13 Tokushi SatoSPBShift summaryX-ray delivery


6.3 keV, 3-4 mJ/pulse,
1-352 pulses at 1.13 MHz


Optical
  
  376   30 Sep 2023, 10:11 Romain LetrunSPBIssueOn multiple occasions this morning, the
number of bunches was reduced to 1 without
actions from our side.
 Screenshot_from_2023-09-30_10-00-26.png 
  377   30 Sep 2023, 23:08 Tokushi SatoSPBShift summaryX-ray delivery


6.3 keV, 3-4 mJ/pulse,
1-352 pulses at 1.13 MHz


Optical
  
  380   01 Oct 2023, 23:06 Tokushi SatoSPBShift summaryX-ray delivery


6.3 keV, 3-4 mJ/pulse,
1-352 pulses at 1.13 MHz


Optical
  
  384   11 Oct 2023, 06:22 Abhisakh SarmaSPBShift summaryX-ray delivery


7.8 keV, up to 30 pulses
at 94 kHz, 3 mJ


Optical
  
  386   13 Oct 2023, 07:06 Chan KimSPBShift summaryX-ray delivery


7.8 keV, up to 260 pulses
at 1.1MHz, >4 mJ


Optical
  
  388   14 Oct 2023, 04:04 Chan KimSPBShift summaryX-ray delivery


7.8 keV, up to 260 pulses
at 1.1MHz, ~3 mJ


Optical
  
  392   17 Oct 2023, 23:23 Raphael de WijnSPBShift summaryX-ray delivery


13.6 keV, ~1.6 mJ and up
to 202 pulses at 0.5 MHz


Optical
  
  394   18 Oct 2023, 23:19 Raphael de WijnSPBShift summaryX-ray delivery


13.6 keV, ~1.8 mJ and up
to 352 pulses at 1.1 MHz


Optical
  
  395   19 Oct 2023, 23:30 Jayanath KoliyaduSPBShift endX-ray delivery


13.6 keV, ~1.7 mJ and up
to 352 pulses at 1.1 MHz


Optical
  
  397   20 Oct 2023, 23:10 Romain LetrunSPBShift summaryX-ray delivery


13.6 keV, ~1.6 mJ and up
to 352 pulses at 1.1 MHz.
Beam
  
  402   22 Oct 2023, 00:27 Raphael de WijnSPBShift summaryX-ray delivery


13.6 keV, ~1.6 mJ and up
to 352 pulses at 1.1 MHz.
Beam
  
  407   23 Oct 2023, 05:15 Raphael de WijnSPBShift summaryX-ray delivery


13.6 keV, ~1.6 mJ and up
to 352 pulses at 1.1 MHz.
Beam
  
  410   25 Oct 2023, 04:48 Chan KimSPBIssueSA3 background is very strong and it affects
our NKB (nano KB, Ru coating) focus.

 
 Screenshot_from_2023-10-25_02-37-38.pngScreenshot_from_2023-10-25_02-42-21.pngScreenshot_from_2023-10-25_02-35-35.pngScreenshot_from_2023-10-25_02-36-16.png 
  411   25 Oct 2023, 06:02 Chan KimSPBotherIssue solved (elog:410)
after changing NKB mirror coating to B4C.

 
 Screenshot_from_2023-10-25_05-27-43.pngScreenshot_from_2023-10-25_05-27-13.png 
  416   26 Oct 2023, 07:10 Chan KimSPBShift summaryX-ray delivery


7.8keV, 2.4mj, stable delivery,
homogeneos intra train energy most of the
  
  421   27 Oct 2023, 03:19 Chan KimSPBIssueWe observed auto changes of the number
of X-ray pulses last night and tonight.

It is related to 500 um thick Si
 Screenshot_from_2023-10-27_03-09-25.png 
  422   27 Oct 2023, 06:35 Chan KimSPBShift summaryX-ray delivery


7.8keV, 2.5mj, stable delivery,
homogeneos intra train energy most of the
  
  424   30 Oct 2023, 07:10 Raphael de WijnSPBShift summaryX-ray delivery


7.8keV, ~2.5mj, no beam
before 1:15am
One undulator was
  
  427   31 Oct 2023, 23:08 Chan KimSPBShift summaryX-ray delivery


19keV, 700-800uj


Optical
laser delivery
  
  429   01 Nov 2023, 22:57 Chan KimSPBShift summaryX-ray delivery


19 keV, ~0.9 mJ/pulse,
stable delivery


Optical
  
  432   02 Nov 2023, 23:25 Chan KimSPBShift summaryX-ray delivery


19 keV, ~0.9 mJ/pulse,
stable delivery


Optical
  
  446   15 Nov 2023, 07:10 Jayanath KoliyaduSPBShift endX-ray delivery


1.3-1.7 mJ, 1-30 pulses,
stable delivery


Optical
  
  447   16 Nov 2023, 06:56 Tokushi SatoSPBShift summaryX-ray delivery


1.3-1.7 mJ, 10.7 keV, 1-100
pulses, stable delivery


Optical
  
  448   17 Nov 2023, 06:55 Tokushi SatoSPBShift summaryX-ray delivery


1.3-1.7 mJ, 10.7 keV, 1-100
pulses, stable delivery


Optical
  
  449   18 Nov 2023, 06:42 Tokushi SatoSPBShift summaryX-ray delivery


1.3-1.7 mJ, 10.7 keV, 1-100
pulses, stable delivery


Optical
  
  450   19 Nov 2023, 06:54 Tokushi SatoSPBShift summaryX-ray delivery


1.3-1.7 mJ, 10.7 keV, 1-100
pulses, stable delivery


Optical
  
  451   20 Nov 2023, 07:12 Jayanath KoliyaduSPBShift endX-ray delivery


1.3-1.7 mJ, 10.7 keV, 1-100
pulses, stable delivery


Optical
  
  452   21 Nov 2023, 23:29 Adam RoundSPBShift endStaff: AR, MS, DM, RL, RdW

X-ray delivery


16.9 keV, up to 30 pulses
  
  455   22 Nov 2023, 23:18 Raphael de WijnSPBShift summaryX-ray delivery


16.9 keV, up to 30 pulses
and 1.1 MHz for alignment, 1 pulse for data
  
  457   23 Nov 2023, 23:12 Adam RoundSPBShift endStaff: AR, MS, DM, KK, RL, RdW

X-ray delivery


16.9 keV, up to 30 pulses
  
  459   24 Nov 2023, 20:48 Chan KimSPBotherBeam drift in the horizontal direction
(XTD9_XGM x position) started at around 10am
and continuously drifted until 16:00.
 Screenshot_from_2023-11-24_20-42-17.pngScreenshot_from_2023-11-24_20-42-08.png 
  460   24 Nov 2023, 23:11 Chan KimSPBShift summaryX-ray delivery


16.9 keV, up to 30 pulses
and 1.1 MHz for alignment, 1 pulse for data
  
  461   25 Nov 2023, 19:56 Chan KimSPBotherBeam drift in the horizontal direction
(XTD9_XGM).

From ~16:00, X-ray beam started
 Screenshot_from_2023-11-25_19-54-18.png 
  462   25 Nov 2023, 23:45 Chan KimSPBShift summaryX-ray delivery


16.9 keV, up to 30 pulses
and 1.1 MHz for alignment, 1 pulse for data
  
  463   26 Nov 2023, 23:26 Adam RoundSPBShift summaryX-ray delivery


16.9 keV, up to 30 pulses
and 1.1 MHz for alignment, 1 pulse for data
  
  400   21 Oct 2023, 15:34 Benjamin van KuikenSCS Shift Summary# Morning Shift Summary 21.10.23

Ben, Eugenio

Achievements
  
  18   05 Feb 2023, 12:32 Natalia, ZhongSCSmorning shift summaryachievements:
- Viking spectrometer set up in 8th
order around 1280eV and calibrated
  
  31   15 Feb 2023, 01:40 Laurent Mercadier, Luigi AdrianoSCSlate shift shift summaryAchievements


Two color mode established
with 11.5 GeV, 1.335 keV col1, 1.27 keV col2
Beam
  
  32   15 Feb 2023, 06:54 Benjamin van KuikenSCSNight Shift SummaryAchievements


Located flat jet and attempted
measurement of XAS at several incident energies
  
  33   15 Feb 2023, 23:05 Luigi, LaurentSCSlate shift summary 2nd dayAchievememts:


optimised the beam rep
rate to value of 140KHz for a better signal 
changed
  
  38   17 Feb 2023, 02:24 Laurent Mercadier, Luigi AdrianoSCSlate shift summary2 color mode

Achievements


Fluence scan
delay
  
  40   18 Feb 2023, 07:06 Benjamin, Manuel, RicardoSCSNight Shift summaryAchievements


Used scanning of liquid
jet to improve S/N
Measured x-ray
  
  48   20 Feb 2023, 06:46 Ben, ManuelSCSNight Shift SummaryAchievements


Measured self-refreenced
XAS spectra with single color baem at the
  
  62   01 Mar 2023, 23:31 Sergii, MartinSCSLate shift summary 01.03.2023Achievments:

- Align DPS to remove clipping
of X-rays
  
  63   02 Mar 2023, 05:41 Teguh, LuigiSCSNight shift summary 02.03.2023Achievements:

1. Performed knife-edge scan. The
beam size is currently at 5 um x 120 um.
  
  66   02 Mar 2023, 22:58 Giuseppe Mercurio and SergiiSCSlate shift summaryachievements:


knife edge scans of OL
to find lens position corresponding to the
  
  68   03 Mar 2023, 23:25 Giuseppe, SergiiSCSLate shift summaryachievements:


change the optical laser
to 2 um
found focus of 2 um beam
found
  
  70   04 Mar 2023, 07:00 Teguh, LuigiSCSNight Shift Summary on 04.03.2023Achievements:

- Improved the vacuum of the chamber
slightly
  
  72   04 Mar 2023, 23:04 Sergii, AndreasSCSlate shift summaryAchievements:

- we replaced broken SMA cable,
and added an angle-connector at sample holder
  
  73   05 Mar 2023, 23:04 Sergii, AndreasSCSLate shift summary 05.03.2023Achievments

-RIXS scans at different delay
times and x-ray energies
  
  76   06 Mar 2023, 06:20 Teguh, LuigiSCSNight shift summary 05.01.2023Achievements:

1. Continued measuring time-resolved
and static RIXS on water (run table in elog
  
  82   15 Mar 2023, 17:01 Benjamin, Nahid, Raphael, Philippe, Victoria, TimoSCSmorning shift summaryAchievements


Found RIXS signal from
liquid jet
Measured static RIXS
  
  83   16 Mar 2023, 00:26 Robert, ManuelSCSShift summary, late 2023.03.15Activities:


Found coarse and fine timing
between FEL and PPL at 266nm
Set
  
  86   17 Mar 2023, 23:43 Robert, Zhong, ManuelSCSLate shift summary 17.03.2023Activities:


continued tr-RIXS scans
tried
to find ways to mitigate the energy drifts
  
  89   19 Mar 2023, 15:03 Nahid, BenSCSmoning shift summaryAchievements:


measured the new sample,
Silane, with different time delays


Problems
  
  90   20 Mar 2023, 01:24 Robert CarleySCSLate shift summary 19.03.23Activities:


Measured tr-RIXS spectra
on user sample in silane solvent


Problems:
  
  114   30 Mar 2023, 04:16 Benjamin, Robert, Yi-Ping, Ru-PanSCSShift SummaryAchievements


Found coarse timing between
XFEL and optical laser


Problems
  
  117   31 Mar 2023, 05:10 Benjamin, Yi-Ping, Ru-Pan, AndreasSCSLate Shift SummaryAchievements


Optimized BOZ for Co and
Fe
Estabilished Stable liquid
  
  120   02 Apr 2023, 04:46 Benjamin van KuikenSCSLate Shift SummaryAchievement


Measured tXAS at the Fe
L-edge of Fe(bpy)3 using both delay and energy
  
  121   03 Apr 2023, 06:38 Loic, Yi-PingSCSNight shift summary 02.04.2023Achievements:

Collected more scans on cyanocobalamin,
both delays scans and dynamic XAS
  
  141   18 Apr 2023, 23:01 Laurent Mercadier, Martin TeichmannSCSsummary late shift day 1Achievements


knife edge scans of FEL
beam, 30 um x 30 um beam size
aligned
  
  143   19 Apr 2023, 17:51 Laurent MercadierSCSIssueWe report on an issue regarding the bunch
pattern: The bunch pattern read by SCS_RR_UTC/MDL/BUNCH_DECODER
shows 48 pulses, but we instead use 50 pulses.
 bunch_pattern)issue_2023-04-19_17-37-10.png 
  144   19 Apr 2023, 23:20 Laurent Mercadier, Martin TeichmannSCSshift summary day 2 UP3463Achievements


found larger beamstop
found
center of pinhole and bender settings for
  
  148   21 Apr 2023, 04:05 Robert CarleySCSLate shift summary20.04.2023Activities:


correctly positioned magnet
moved
detector upstream and found small beamstop
Recorded
  
  149   21 Apr 2023, 04:13 Robert CarleySCSNight shift summary 20-21.04.2023Activities:


Investigated SAXS scattering
instability and found it to come from the
  
  152   22 Apr 2023, 23:32 Laurent Mercadier, Giuseppe MercurioSCSlate shift summaryAchievements


Work on laser to improve
the beam profile and reduce pointing. Apertured
  
  153   23 Apr 2023, 23:38 Giuseppe Mercurio, Laurent MercadierSCSlast late shift UP3463Achievements


Beam transport
Coarse
and fine timing
XAS on Co
Aligned
  
  156   24 Apr 2023, 15:16 Andreas, MartinSCSnight shift summary and end of beamtimeachievements:

- finished SAXS data recording
till 8am on time-resolved skyrmion nucleation
  
  155   24 Apr 2023, 15:16 Andreas, MartinSCSnight shift summary and end of beamtimeachievements:

- finished SAXS data recording
till 8am on time-resolved skyrmion nucleation
  
  171   04 May 2023, 00:52 Sergii ParchenkoSCSLate shift sumamry 03.05.2023Achivments:

- X-ray and Laset spot size calibration

- Course timing check
  
  174   04 May 2023, 14:34 Loic Le GuyaderSCSmorning shift summaryachievements


we change the DSSC timing
to record the first pulse
sample
  
  175   04 May 2023, 22:58 Sergii, PhuongSCSLate shift summary 04.05.2023Achivements:

-Cooling down the sample. Sample
is at 14K
  
  179   05 May 2023, 06:33 Giuseppe Mercurio, Diego, Martin, AminaSCSShift summaryachievements:


inserted the magnet and
measured delay scan at the maximum magnetic
  
  180   05 May 2023, 07:23 Giuseppe MercurioSCSRe: Shift summaryActually, it looks like the sync was lost
shortly before 23h last night as the jitter
went to 0fs and recovered at 1am when a new
 optical_sync_2023-05-05_07-21-35.png 
  181   05 May 2023, 14:56 Giuseppe MercurioSCSmorning shift summaryachievements


with help from LAS OCD,
we got the PPL synchronized again with optical
  
  183   05 May 2023, 23:00 Sergii, PhuongSCSLate shift summary 05.05.2023Achivments:

-Measure time scans with magnetic
field in opposite directions
  
  188   06 May 2023, 06:53 Giuseppe MercurioSCSnight shift summaryachievements:

- measured delay scans at sample
tilted by 20 degree
  
  186   06 May 2023, 06:53 Giuseppe MercurioSCSnight shift summaryachievements:

- measured delay scans at sample
tilted by 20 degree
  
  187   06 May 2023, 14:42 Giuseppe MercurioSCSmorning shift summaryachievements


finished recording dataset
at 20degree
changed for sample
  
  189   06 May 2023, 23:15 Sergii, PhuongSCSLate shift summary 06.05.2023Achivments:

-Measure delay scans at two PPL
fluencies on smaller grain size.
  
  191   07 May 2023, 06:52 Giuseppe MercurioSCSshift summaryachievements:


measured delay scans on
16 nm samples at different magnetic fields
  
  192   07 May 2023, 14:47 Giuseppe MercurioSCSmorning shift summaryachievements


exchanged He dewar and
managed to cool down the sample again after
  
  193   07 May 2023, 23:11 Sergii, PhuongSCSLate shift summary 07.05.2023Achivments:

-Move DSSC closer to the sample.

-Measure delay scans for opposite
  
  211   28 May 2023, 22:57 Martin TeichmannSCSShift summary all weekwe were trying to make THz and cross correlate
this to the pump laser.

We managed to see THz and an auto-correlation
  
  228   06 Jun 2023, 23:11 Loic Le GuyaderSCSlate shift summaryachievements


aligned the beam through
up to the XOX imager
prepared
  
  229   07 Jun 2023, 15:04 Giuseppe Mercurio, Teguh AsmaraSCSMorning shift summaryachievements:


FEL beam realignment because
pointing was off since we had 0 pulses during
  
  230   07 Jun 2023, 23:54 Loic Le GuyaderSCSLate shift summaryachievements


setup spectral encoding
of the transient reflectivity in FFT
determine
  
  238   09 Jun 2023, 22:52 Loic Le GuyaderSCSlate shift summaryachievements


try pumping STE membrane
with FEL and detect THz emission with single
  
  243   10 Jun 2023, 23:24 Loic Le GuyaderSCSlate shift summaryachievements


checked coarse timing between
FEL and PPL at XOX. It had shifted significantly
determined
  
  245   11 Jun 2023, 07:40 Robert CarleySCSNight shift summary achievements


optimized EOS signal from
FEL-induced THz emission from STE on Sa of
  
  247   11 Jun 2023, 17:34 Robert CarleySCSEarly shift summaryAchievements


Observed first EOS of THz
emitted from FEL-pumped STE on SiC and Si
  
  248   12 Jun 2023, 01:06 Laurent MercadierSCSlate shift summaryAchievements


Optimized THz EOS, managed
to observe single shot EOS trace with good
  
  275   28 Jul 2023, 06:38 Sergii, ManuelSCSShift Summary 27_07_23 nightAchievements:

1. Beam in sample chamber, almost
overlapping with ALAS
  
  277   28 Jul 2023, 14:56 Giuseppe Mercurio, Laurent MercadierSCSend of shift summaryachievements:


found new M2 bender position
for focusing using blank
tried
  
  282   30 Jul 2023, 18:35 Giuseppe, AndreasSCSMorning Shift summaryachievements:


calibration of exit slits
measurement
of Cu L3 edge
moved hRIXS to nominal
  
  284   31 Jul 2023, 01:42 Sergii, MartinSCSNight shift summary 30.07.2023Achivements:

-We measured vertical spot size
for several VFM settings
  
  285   02 Aug 2023, 06:44 Giuseppe Mercurio, Teguh AsmaraSCSshift summaryachievements:


beam transport with the
second half of undulators closed
measured
  
  286   04 Aug 2023, 07:10 Giuseppe Mercurio, Teguh AsmaraSCSnight shift summaryachievements:


changed the LEPM to optimize
resolution
found 140 meV


problems:
  
  287   04 Aug 2023, 23:20 Andreas, SergiiSCSlate shift summaryachievements:


hooked up sample cooling
and reached 20K at sample at typical low
  
  289   05 Aug 2023, 15:33 Ben, JustineSCSShift summaryAchievements


Measured XAS and RIXS from
NdNiO3 test sample at 230 K


Plan
  
  290   05 Aug 2023, 23:06 Sergii, AndreasSCSLate shift summary 05.08.2023Achievements:

- Find course timing with antenna

-Find find timing signla with TR_XAS
  
  291   06 Aug 2023, 15:55 Ben, JustinaSCSMorning Shift SummaryAchievements


Moved spectrometer to 1000
ln/mm and began alignment


Plan
  
  292   06 Aug 2023, 23:20 Sergii, AndreasSCSLate shift summary 06.08.2023Achievements:

-Re-alighned beam transport from
the FEL soource as we seen low phon counts
  
  305   17 Aug 2023, 11:00 Teguh Citra Asmara, Eugenio ParisSCSMorning Shift Summary on 15.08.2023Achievements


Start cooling down the
sample
Align the beamline and
  
  306   17 Aug 2023, 11:04 Justine Schlappa, Le PhuongSCSLate Shift Summary on 15.08.2023Achievements:


Set up PP laser, find spatial
and temporal overlap between FEL and PP laser
Optimize
  
  307   17 Aug 2023, 11:06 Sergii Parchenko, Manuel HarderSCSNight Shift Summary on 15.08.2023Achievements:


Replaced focusing lens
of PP laser and measured focus with knife
  
  308   17 Aug 2023, 11:07 Teguh Citra Asmara, Eugenio ParisSCSMorning Shift Summary on 16.08.2023Achievements:


Performed tr-RIXS on peak
A, B, and C at 2.4 mJ/cm^2
Performed
  
  309   17 Aug 2023, 11:08 Teguh Citra AsmaraSCSAfternoon shift summary on 16.08.2023Achievements:


tr-RIXS at 4 mJ/cm2 for
energies A, B, C, and D (pre-edge)
Checked
  
  310   17 Aug 2023, 11:09 Sergii Parchenko, Manuel HarderSCSNight shift summary on 16.08.23Achievements


Acquired tr-RIXS data with
4.0 mJ/cm² laser power for 21 delays
  
  311   17 Aug 2023, 23:54 Justine SchlappaSCSAfternoon Shift Summary on 17.08.2023Achievements:
1. Finalized tr-RIXS series at 1.74
mJ/cm2
  
  313   19 Aug 2023, 07:16 Sergii, ManuelSCSNoght shift sammary 18.08.2023
Night
shift summary on 18.03.2023


Finished XAS series at
  
  332   06 Sep 2023, 06:35 Giuseppe MercurioSCSGiuseppe, Justineachievements:

- we found optimum hRIXS settings
for 1020 eV but moving the detector arm
  
  333   06 Sep 2023, 23:33 Ben, AndreasSCSShift SummaryAchievements


Determined temporal overlap
between the X-ray and laser
measured
  
  334   07 Sep 2023, 07:24 Justine Schlappa, Guiseppe MercurioSCSShift summary, September 7 after nightshiftAchievements:
- Optimized hRIXS settings for OK
edge at 145 deg scattering angle, resolution
  
  335   07 Sep 2023, 23:46 Andreas ScherzSCSShift summaryShift summary 07.09.2023

Achievements:
1. found t0   on LSCO x=0.15
  
  352   22 Sep 2023, 06:51 Benjamin van KuikenSCSShift summaryAchievemnets


Characterized the X-ray
and laser danage on the STO2LNO2


Problems
  
  366   24 Sep 2023, 07:49 Natalia, Justina, Giacomo, Sergey, Ben, Eugenio, TeguhSCSsummary of 23.09Around 6:55 there was a power glitch. Power
in the experimental hutch and rack room went
down in SASE3, error message in Xray interlock
  
  370   27 Sep 2023, 07:51 Benjamin van KuikenSCSSCS Night Shift SummaryAchievements


Characterized optical laser
spot at sample


Problems
 SCSPopinOthOrder_270923.png 
  374   29 Sep 2023, 22:59 Laurent MercadierSCSShift summary# Late shift summary 29.09.2023

Laurent, Phuong
## Achievements
  
  379   01 Oct 2023, 14:48 Giuseppe MercurioSCSMorning shift summary# Morning shift summary

Giuseppe, Martin

* achievements
  
  396   20 Oct 2023, 15:22 Benjamin van KuikenSCSMorning Shift SummaryAchievements


Tested MCPs and APD for
XAS

Both MCPs give a good XAS
  
  398   20 Oct 2023, 23:22 Sergii, GiacomoSCSLate Shift Summary on 20.10.2023
Late
shift summary 20.10.2023

Achievements
-Switched AFS to burst mode
  
  399   21 Oct 2023, 06:30 Laurent, PhuongSCSNight shift summary 21.10.2023Night shift summary
21.10.2023

Achievements


Found T0 on SiN, but the
  
  401   21 Oct 2023, 23:34 Sergii, GiacomoSCSLate shift summary 21.10.2023Achievements:
-Collecting TR-RIXS data for different
fluencies and delay range
  
  403   22 Oct 2023, 07:34 Laurent, PhuongSCSnight shift summary, 22.10.2023
Night
shift summary 22.10.2023

Laurent,
Phuong
  
  404   22 Oct 2023, 13:21 Benjamin van KuikenSCSShift summaryMorning shift
Summary 22.10.2023

Achievements


Checked beam alignment
  
  406   23 Oct 2023, 01:38 Sergii , GiacomoSCSLate shift summary 22.10.2023Achievements
-Check XAS and static RIXS after the
beam was back
  
  408   23 Oct 2023, 06:46 Laurent MercadierSCSNight shift summary, 23.10.2023 

  
  414   25 Oct 2023, 15:10 Sergii, TeguhSCSMorning Shift Summary, 24.10.2023
Morning
Shift Summary, 24.10.2023

Achievements:


Re-aligned the beamline
  
  415   25 Oct 2023, 15:18 Sergii, TeguhSCSMorning Shift Summary, 25.10.2023
Morning
Shift Summary, 25.10.2023

Achievements:


Re-aligned FEL beam pointing
  
  417   26 Oct 2023, 07:13 Andreas Scherz / Eugenio ParisSCSnight shift summaryNight shift summary

Achievements:
- Recovered time0 on SiN (time0 moved
  
  418   26 Oct 2023, 15:03 Sergii, TeguhSCSMorning shift summary, 26.10.2023
Morning
shift summary, 26.10.2023

Achievements:


Continued measuring tr-RIXS
  
  420   26 Oct 2023, 23:25 Robert CarleySCSLate shift summary, 26.10.2023
Achievements:


Continued with tr-RIXS


No
problems
  
  444   12 Nov 2023, 07:24 Benjamin van KuikenSCSNight shift summary# Shift Summary

Achievements
 - Found RIXS signal from CuO
 p6696-r59.png 
  445   13 Nov 2023, 07:16 Loic Le GuyaderSCSshift summary# Shift Summary

Achievements
 - Measured elastic line with
  
  3   16 Jan 2023, 19:50 Jan GruenertPRCIssueProblem: Beam operation in SASE2
is prohibited by SEPS / MPS
Origin of problem: HED-CRL3
 JG_2023-01-16_um_16.30.12.pngJG_2023-01-16_um_16.30.50.png 
  4   17 Jan 2023, 10:25 Jan GruenertPRCIssueSASE3 peration issue - SOLVED

 

Controls
issue, the machine cannot make beam in SASE3.

From
BKR / DOOCS the problem description is: Big
 JG_SASE3_no_beam_permission_2023-01-17_09-13-31.png 
  6   22 Jan 2023, 18:40 Jan GruenertPRCIssueSASE1 blocked to 1 bunch/train
by EPS interlock (sic, not 2 but 1)
--- PARTIALLY RESOLVED
 JG_2023-01-22_um_17.43.36.pngJG_2023-01-22_um_18.17.31.pngJG_2023-01-22_um_18.23.20.pngJG_2023-01-22_um_18_1.37.21.png 
  7   23 Jan 2023, 10:43 Jan GruenertPRCStatusStatus of machine SASE tuning
(just before switching off for monday maintenance):

 JG_2023-01-23_um_10.04.56.png 
  8   25 Jan 2023, 08:40 Raúl Villanueva-GuerreroPRCAll SASE's - SEPS Interlock Test - Results, Status & Upcoming ScheduleDear all,

please find here a summary of the
status on this critical topic provided yesterday
  
  9   25 Jan 2023, 08:44 Raúl Villanueva-GuerreroPRCZZ Access on 24th January (19:30h) - Replacement of Motor on SASE2 Undulator - Cell 17 Phase ShifterDear all,

last evening Suren Karabekyan and
myself did a short notice ZZ access to XTD1.
  
  17   05 Feb 2023, 15:18 Harald SinnPRCIssue15:15  SCS called and reported an
issue with one of the motors of the SCS exit
slit. DOC already looked at the problem and
  
  26   11 Feb 2023, 13:55 Andreas GallerPRCStatusGun Modulator Problems

Gun Trip at 11:23 and since then
the Modulator trips after each restart.
  
  30   13 Feb 2023, 19:02 Frederik Wolff-FabrisPRCIssueSA3 SCS exit slit: the upper blade was
detached from the motor and fall into closed
position. Maurizio V. and F. Wolff-Fabris tried
  
  77   11 Mar 2023, 12:46 Frederik Wolff-FabrisPRCSA2 statusThe SA2 XTD1 XGM is current offline since
Saturday morning.

Yesterday, Friday, it already started
  
  78   14 Mar 2023, 10:56 Harald SinnPRCIssueThe longitudinal feedback on SA1/3 was
swicthed off by mistake over night. When
it will be switched on, the beam may wiggle
  
  79   14 Mar 2023, 14:40 Harald SinnPRCIssueIn order to optimise the performance of
SASE2 self seeding, a stronger compression
setting is required. 
  
  80   14 Mar 2023, 20:26 Harald SinnPRCIssueSCS could only use two pulses, because
the SXP imager was still in the beam and
SXP shutter open. 
  
  104   24 Mar 2023, 19:42 Naresh KujalaPRCStatusReply to elog103:

Spoke with Machine RC Thomas Wamsat
and SQS.
  
  109   26 Mar 2023, 13:26 Naresh KujalaPRCStatusMachine RC Raimond informed PRC that
there is an issue with the A4 module that
needs to fix to have a continuous operation.
  
  123   04 Apr 2023, 08:37 Frederik Wolff-FabrisPRCIssueTUE 08:30AM:

The SA3 Cell 17 & 18 Phase
shifters do not move and encoders are damaged. A
  
  128   08 Apr 2023, 10:29 Andreas GallerPRCIssueChanged EPS Interlock condition
for SPB_XTD9_IMGPI/SWITCH/SCREEN_OUT

SPB/SFX called DOC this morning
  
  162   28 Apr 2023, 11:21 Naresh KujalaPRCIssueIssue with SA1_XTD9_PBLM and it is stuck.

Hi All,

After discussion with SPB, they
  
  163   28 Apr 2023, 13:00 Naresh KujalaPRCIssue- Received a call from machine RC (Sergey
Tomin)

- There is an issue with DOOCS
  
  164   28 Apr 2023, 16:08 Naresh KujalaPRCAttentionFXE (Fred) confirmed that they don't
use beam for night shifts from Friday to Sunday.

 
  
  169   03 May 2023, 13:01 Jan GruenertPRCStatusThe machine tuning over the night had not
yet accomplished fully satisfactory beam
conditions mainly at the high photon energies
 JG_2023-05-03_um_13.10.33.png 
  170   04 May 2023, 00:07 Jan GruenertPRCSA1 statusSASE1 status:

First shift switchover this week
at 23h from FXE (19.5 keV) to SPB/SFX (12.4
  
  182   05 May 2023, 16:51 Jan GruenertPRCSA2 statusMID reports an observation that
is particular to the operation at the currently
high photon energy of 23 keV
  
  195   08 May 2023, 09:04 Jan GruenertPRCAttentionInfo from XRO (Maurizio Vannoni) to PRC
concerning tunnel access
request #152936 (Inspection and repair of
  
  200   11 May 2023, 09:21 Michaela PetrichPRCAttentionDear all,

I just got the information for
BKR that due to a failed klystron we had
  
  214   31 May 2023, 17:35 Naresh KujalaPRCIssue 

HED reported that they are unable
to go 352 pulses and while changing/dailing
 bunchpatternServer-scene_MDL-macros.PNG 
  226   05 Jun 2023, 08:28 Naresh KujalaPRCStatus- SA2 photon beamline

Today morning found the CRL1: 5
and 6 arm and Pop-in 45-I are still IN. I
 SA2_Main-Status_05-06-23.PNG 
  231   08 Jun 2023, 10:37 Jan GruenertPRCIssueSASE2 vacuum incident

7h10
: MID informs PRC about a vacuum incident
in the SASE2 tunnel which tripped the beam.
 2023-06-08_SA2-beam-delivery.JPG 
  233   08 Jun 2023, 17:05 Jan GruenertPRCIssueSA2_XTD1_ATT solid attenuator
vacuum issue

Info
from VAC (Raul Villanueva) 12h30:
 image.png 
  236   09 Jun 2023, 12:37 Jan GruenertPRCIssueRepair of SA2_XTD1_ATT

Status 12h30:
The current MID users took beam until
  
  241   10 Jun 2023, 18:46 Jan GruenertPRCIssue18h05 : RC informs:

Machine is down, because Cryo-OK
was lost.
  
  242   10 Jun 2023, 21:52 Jan GruenertPRCStatusThe Cryo team solved the problems, beam
is back.
Downtime from 17h59 until 21h03.
 JG_2023-06-10_um_21.55.46.png 
  256   16 Jun 2023, 06:28 Michaela PetrichPRCIssuestaus of JUN16, 11:30

SA1 and SA3 have been adjusted
to acceptable conditions to be compatible
  
  273   23 Jul 2023, 17:28 Frederik Wolff-FabrisPRCStatusPhoton Activities by XPD colleagues
in SA3 are concluded on Sunday 23.07 at 17:00.
The photon commissioning activities are concluded
  
  274   25 Jul 2023, 19:18 Harald SinnPRCStatusAfter the 12 hour cryo failure last night,
it was decided to exchange a faulty window
with some reduced transmission at the
  
  276   28 Jul 2023, 14:46 Harald SinnPRCStatusAs discussed, there will be a beam interuption
form 14:45 until probably 15:45 related to
jitter studies at A1 that the BKR would like
  
  278   28 Jul 2023, 15:37 Harald SinnPRCStatusGood news: The 'jitter'-tests was
sucessful and BKR could identify the jitter
source related to a wrong software setting
  
  279   29 Jul 2023, 17:57 Harald SinnPRCIssueThe hutch search of SASE3, SXP became defective
around 5am. 

DESY MPS group replaced a defective
  
  297   10 Aug 2023, 22:43 Raúl Villanueva-GuerreroPRCIssueHere is a capture of the observed issue
with the SPB shutter the past night.

 
 image_2023-08-10_225040511.png 
  Draft   22 Aug 2023, 15:52 Naresh KujalaPRCSA1 statusSA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and
  
  316   22 Aug 2023, 15:56 Naresh KujalaPRCSA1 statusSA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and
  
  317   22 Aug 2023, 18:15 Naresh KujalaPRCStatusPhoton beam delivery status:

- Machine informed that beam will
be handover to instruments SA1 (SPB/SFX)
  
  325   26 Aug 2023, 08:23 Naresh KujalaPRCStatus- Machine updates;

Saturday 1:30 hr Cold compressor
failed. The initial estimation of downtime
  
  326   26 Aug 2023, 18:02 Naresh KujalaPRCStatusDear All,

Two
important machine updates.
  
  338   09 Sep 2023, 07:54 Naresh KujalaPRCStatusInfo from MRC (Lars)

-----------------------------------------------------------------------------

The cryo crew reports that the
  
  339   09 Sep 2023, 11:36 Naresh KujalaPRCStatus- Due to the failure of the cryo cold
compressor. The machine is down.

- Next update 9 pm today
  
  340   09 Sep 2023, 15:03 Naresh KujalaPRCStatusInfo from Machine RC (Lars):

----------------------------------------------------------------------------------------------------------------------------------------

Author: Froehlich
  
  347   19 Sep 2023, 18:58 Jan GruenertPRCSA1 statusConcerning SASE1:

Please note that for this week
the "remote power limit" was set
  
  350   21 Sep 2023, 09:24 Jan GruenertPRCSA1 statusInfo by R.Kammering (mail 20.9.23 18h25),
related to the SA1 intensity drops
during large wavelength scans:
  
  351   22 Sep 2023, 00:56 Jan GruenertPRCSA1 statusAs agreed beforehand, PRC and SPB/SFX re-assessed
the SA1 EPS power limit based on actual performance,
required number of pulses and rep rate, at
  
  354   22 Sep 2023, 17:46 Jan GruenertPRCStatusSASE3 gas supply alarm

SCS
called the PRC at 17h04 due to a loud audible
alarm in XHEXP1 and contacted also TS-OCD.
  
  356   23 Sep 2023, 07:31 Jan GruenertPRCIssue7:23: RC info:
an electrical power glitch interrupted
beam operation, machine down. DESY has power
  
  359   23 Sep 2023, 08:50 Jan GruenertPRCIssueUpdates on power glitch

8h50 No feedback from TS-OCD (still
not arrived at SASE3 / SCS ?). Phone is busy.
 JG_2023-09-23_um_10.28.37.pngJG_2023-09-23_um_10.43.59.pngJG_2023-09-23_um_12.46.35.png 
  360   23 Sep 2023, 14:49 Jan GruenertPRCStatusUpdate of power outage aftermath

Achieved
by now / status


SASE1

​beam
  
  361   23 Sep 2023, 15:35 Jan GruenertPRCIssueSASE2 :
The unavailability of karabo and possibly
missing cooling water is a problem for
  
  363   24 Sep 2023, 07:19 Jan GruenertPRCAttentionAgain: power outage !

As yesterday, at around 7am, power
was lost in Schendfeld at SASE3. No beam
  
  365   24 Sep 2023, 08:05 Jan GruenertPRCStatus8h05 Beam is switched back on in SASE2.
HED ready for taking beam.

8h45 BKR is having problems to
  
  389   14 Oct 2023, 09:48 Frederik Wolff-FabrisPRCStatusMachine went down overnight (4AM and 6AM)
and could not be properly restarted by BKR.

Ongoing tuning is proceeding with
  
  425   30 Oct 2023, 14:36 Jan GruenertPRCIssueThe EPD reading system at the turnstiles
of XTD10 entrance were not working this morning.
A necessary ZZ access to XTD10
  
  426   30 Oct 2023, 23:18 Jan GruenertPRCStatusAt the end of the MON late shift, the tuning
status and obtained lasing pulse energies
(ATT#1) are as follows:
 JG_2023-10-30_um_23.15.36.png 
  431   02 Nov 2023, 19:37 Jan GruenertPRCStatusTypical delivery status during daytime
during the week:


SA1 at 19 keV : 841 uJ +/-
 JG_2023-11-02_um_16.35.54.png 
  435   04 Nov 2023, 08:15 Jan GruenertPRCIssueBeam down for SASE1/3: SASE1 XTD2
vacuum issue

Vacuum interlock of the SA1 / XTD2
 JG_2023-11-04_um_09.34.41.png 
  436   04 Nov 2023, 13:49 Jan GruenertPRCIssue(Temporary) solution for the vacuum
incident in SA1

This morning at 7h18 the vacuum
  
  438   05 Nov 2023, 12:18 Jan GruenertPRCIssueAccelerator down 9h23 - 12h

RC / BKR informs (10am), that due
to a quadrupole power supply failure in A21
  
  439   05 Nov 2023, 12:47 Jan GruenertPRCIssueNorth branch down : another e-beam
magnets problem

RC informs 12h45 that the linac
  
  440   05 Nov 2023, 16:14 Jan GruenertPRCStatusFinally, we're completely back in operation,
and the performance is recovered in
all beamlines.
  
  469   18 Apr 2024, 23:19 Jan GruenertPRCIssue22h55:
HED informs that they have issues
with the HED pulse picker in XTD6. It affects
  
  24   11 Feb 2023, 01:09 Jörg HallmannMIDShift summarysucessfull data taking for user samples

beam loss for ~15 min and a small
issue with scannerX of the FSSS (could be
  
  56   26 Feb 2023, 01:37 Felix BrausseMIDShift Summary Feb 25th
Aligned both branches of the split-and-delay
line.
Brought the beam into the
experimental hutch to image it on the x-ray
 2023-02-26_01-57-17_SDLbranchesOnZyla.png 
  57   27 Feb 2023, 02:10 Felix BrausseMIDShift Summary Feb 26thMoved out MONO, aligned SDL without MONO

Looked at both beams on DES

Struggled to get the same beam
  
  85   17 Mar 2023, 01:48 Johannes MoellerMIDShift summaryThe intensity of the Seeding decreesed
from 850 uJ to 550 uJ during the time between
20:00 and 02:00.
 Screenshot_from_2023-03-17_01-44-53.png 
  111   28 Mar 2023, 15:26 Angel Rodriguez FernandezMIDIssueThe door from MID side entrance was smashed
and we lost the radiation permit.

The acciedent happened between
 IMG_8399.JPG 
  112   29 Mar 2023, 01:31 Jörg HallmannMIDShift summary March 28thSeeding at 9 keV with 800 - 1000uJ intensity

1. alignment of the lower branch
of the SDL
  
  113   30 Mar 2023, 02:37 Jörg HallmannMIDshift summary March 29thachievments: alignment of the SDL (both
branches)

measuring of samples & calibrants
  
  116   31 Mar 2023, 01:51 Jörg HallmannMIDshift summary March 30th- seeding at ~800 uJ

- repaired the laser interlock
of A.08
  
  139   16 Apr 2023, 23:06 Antje TrappMIDshift summary EulerMDL calibrationFirst four pictures: beam line status at
beginning of shift - Beam aligned to MID

Idea is to check M2 parasitic motions
 11x 
  151   22 Apr 2023, 21:57 Ulrike BoesenbergMIDShift summaryQuick aligment of the instrument with quiet
good HXRSS performance after cryofailure

Checking of t0 to the optical PP
  
  172   04 May 2023, 01:22 Jan-Etienne PudellMIDShift summaryShift summary:

- get the beam with 23keV and 120µJ 

- falignment of mirrors m1 and
  
  177   05 May 2023, 02:16 Jan-Etienne PudellMIDShift summaryX-ray delivery:

- stable at 120µJ, mostly
63 pulses
  
  184   06 May 2023, 02:19 Jan-Etienne PudellMIDShift summary- We get stable x-ray delivery with 130µJ.

 

- We could move the detector succesfully
  
  190   07 May 2023, 02:23 Jan-Etienne PudellMIDShift summaryWe had stable x-ray delivery with 120µJ
and up to 300 pulses.

Successful user data acquisition
  
  194   08 May 2023, 02:38 Jan-Etienne PudellMIDShift summaryStable beam delivery with 23keV and 140µJ
at 2.2, 1.1 and 0.55MHz

 
  
  209   25 May 2023, 01:59 Jörg HallmannMIDShift summaryoptimization of seeding ongoing

tasks achieved during alignment:

- polarizer aligned
  
  232   08 Jun 2023, 11:02 Johannes MoellerMIDIssueAddition to previous issue:

Last incident (of overall 4), we
had 0 bunches, moved in XTD1 ATT 0.6 and
 Screenshot_from_2023-06-08_11-03-50.pngScreenshot_from_2023-06-08_11-08-06.png 
  234   09 Jun 2023, 02:22 Ulrike BoesenbergMIDShift summary*Vacuum issues: There seems to be a leak
in the arm nr. 6 (2.4mm CVD Diamond). This
has escalated to trip several times the vacuum
  
  239   10 Jun 2023, 00:39 Ulrike BoesenbergMIDShift summary* Data collection of vycor and glass samples
in SAXS geometry until 9am

* Successful intervention on SA2_XTD1_ATT
  
  244   11 Jun 2023, 02:08 Ulrike BoesenbergMIDShift summary* First half of the day was used to optimize
seeding performance
* Cryo issues started at 6 pm; were
  
  249   12 Jun 2023, 02:01 Ulrike BoesenbergMIDShift summary

*Some more tuning of HXRSS and
focus optimization in the morning.
  
  281   30 Jul 2023, 02:02 Ulrike BoesenbergMIDShift summary9.3 keV, 1-35pulses, stable delivery ~600uJ
*General alignment of MID branch to
the DES
  
  283   30 Jul 2023, 23:06 Ulrike BoesenbergMIDShift summary9 and 10keV beam, up to 30 bunches, significant
drop in intensity in the morning and in the
evening.
  
  294   09 Aug 2023, 01:42 Jörg HallmannMIDShift summary

after
alignment of the beam, the main topic of
the day were flatfields for the AGIPD with
  
  295   10 Aug 2023, 01:31 Jörg HallmannMIDShift summary- finalized the flatfields of the AGIPD
at 0.5 MHz
- optimized the performance of the
  
  298   11 Aug 2023, 01:44 Jörg HallmannMIDShift summaryalignment checks of the CRL2 device as
well as the Mono - continuation of both devices
together planned for tomorrow
  
  300   12 Aug 2023, 01:32 Jörg HallmannMIDShift summary
measured
various sample using the levitation device

issues:
  
  321   25 Aug 2023, 06:20 Johannes MoellerMIDShift summary
Shift
summary the 24th of Aug


MID takes the seeded beam
  
  324   26 Aug 2023, 02:07 Felix BrausseMIDShift summary
Shift
summary the 25th of Aug


Found laser and X-ray spatiotemporal
  
  328   28 Aug 2023, 02:14 Wonhyuk JoMIDShift summaryShift summary for 28th of Aug.
- Realigned the center of rotation. 
- MID took the seeded beam at about
  
  330   29 Aug 2023, 03:14 Wonhyuk JoMIDShift summaryShift summary for 29th of Aug.

- Conducted Time-resolved Bragg
CDI experiment using 3rd harmonic pump laser. 
  
  372   29 Sep 2023, 00:35 Johannes MoellerMIDShift summary
1,
60 and 350 pulses at 8.7keV, HXRSS

*focus characterization CRL2 lens
  
  378   01 Oct 2023, 02:00 Johannes MoellerMIDShift summary
HXRSS
at 8.8 keV, 1, 60 or 350 pulses. Quite stable
seeding performance
  
  393   18 Oct 2023, 02:09 Alexey ZozulyaMIDShift summaryShift summary (p4239)
Achievements:
- HXSS beam at 10.5 keV at 400 uJ
  
  405   23 Oct 2023, 01:10 Alexey ZozulyaMIDShift summaryMilestones:
*Finish measurement program on the
STO sample at room temperature
  
  428   01 Nov 2023, 02:22 Johannes MoellerMIDShift summary
stable delivery of 1mJ at 18keV
SASE
succesful beamline alignment
for MID (CRLs + M1 and M2) with mono.
alignment
  
  430   02 Nov 2023, 02:28 Johannes MoellerMIDShift summary
stable delivery of 1mJ SASE at
18keV
NAFO lens characterization
with caustic scan
successful detector
  
  434   04 Nov 2023, 02:29 Johannes MoellerMIDShift summary
Stable delivery of SASE at 18 keV.
The intensity dropped slightly from 1mJ to
0.88mJ during the evening, but everything
  
  437   05 Nov 2023, 04:08 Angel Rodriguez FernandezMIDShift summary
stable SASE beam delivery with
1mJ pulse energy
we took data
for different optical laser excitation fluences
  
  453   22 Nov 2023, 10:19 Johannes MoellerMIDIssueThe Si 0.5mm absorber of XTD1 attenuator
seems to be damaged. First screenshot is
with that one inserted. In the second screenshot,
 Screenshot_from_2023-11-22_10-15-34.pngScreenshot_from_2023-11-22_10-14-47.png 
  454   22 Nov 2023, 22:48 Johannes MoellerMIDShift summary
*Tests
for online XPCS pipeline ongoing
*beam optimization with power slits,
  
  456   23 Nov 2023, 22:15 Jörg HallmannMIDShift summary
progress
with the Damnit - XPCS analysis test with
various samples (SiO2, Ludox etc.)
  
  2   16 Jan 2023, 16:01 karen appelHEDCRL3: recalibration of y axis, test of x range and move to SEPS interlock trigger positionCRL3 arm 2, 5 and 9 were mecanically religned
to the V groove and retracted to some y position.

The y motor position was recalibrated
  
  15   04 Feb 2023, 08:34 karen appelHEDShift summaryWe took the beam from 7 am, 24 h operation
in three shifts.

We set up a new scheme for aligning
  
  16   05 Feb 2023, 08:40 karen appelHEDShift summaryStart up of HED ongoing for the three shifts

Day shift:


work on the new X-ray alignment
  
  39   17 Feb 2023, 17:16 bouffetierHEDLate shift activities17 Feb 2023, 17:15 : We centered Pin in
the FEL beam and then imaged this pin with
ILM and FSI to get common references.
 7x 
  41   18 Feb 2023, 00:32 Motoaki Nakatsutsumim, Carsten Baehtz, Olly HumphriesHEDShift summary - night shift 2023-02-17Ealier shift members managed to get a good
quality image on Optique Peter by imaging
the sample plane to the Optique Peter with
 Aligned_A2_E5_2023-02-18_00-35-18.pngWire_OPeter_2023-02-18_00-52-19.pngScreenshot_from_2023-02-18_00-54-25.pngScreenshot_from_2023-02-18_00-59-37.pngScreenshot_from_2023-02-18_01-02-21.png 
  44   19 Feb 2023, 05:29 Motoaki Nakatsutsumi, Carsten Baehtz, Olver HumphriesHEDShift summary - night shift 2023-02-1818 Feb 2023, 23:37 Together with the last
shift members, we continued shooting laser
on Cu 25 um thick wire for another 2 hours.
 Foc_scan_2000l_mm.PNG 
  43   19 Feb 2023, 08:06 Erik BrambrinkHEDDay shift summary19 Feb 2023, 08:08 Hand over from night
shift

Added polarizer in the PAM beam
  
  45   19 Feb 2023, 19:51 bouffetierHEDlate shift summary19 Feb 2023,15:30 Shift handover

Runs will be added in the general
Elog for data runs and acqusitions (Elog-4)
  
  47   19 Feb 2023, 23:25 Motoaki Nakatsutsumi, Oliver Humphries, Carsten BaehtzHEDShift summary 2023-02-198.2 keV, 750 uJ. 

Short summary

- Optimize the downstream nanofocus
 P_20230220_045813b.jpgP_20230220_054233b.jpg 
  60   01 Mar 2023, 16:07 Alexander PelkaHEDShift summaryDay shift 28.02

Got the
beam, aligned it up to the TCC, mirrors in
  
  64   02 Mar 2023, 22:54 Ulf ZastrauHEDStability IssueHED would like to report
that since 2 days the SASE2 beam is instable.
The attached movie shows, on the left
 beamjitter_2_3_2023.mp4 
  67   03 Mar 2023, 23:06 Ulf ZastrauHEDShift summaryBeam delivery SASE 8,25 keV, 1300 µJ.
Intensity stable,
but beam jittery in horizontal. 
  
  75   06 Mar 2023, 06:48 Ulf ZastrauHEDShift summaryX-ray delivery stable in intensity, 1300-1400
mJ at 8150 eV SASE.

user experiment 3430 (Zastrau /
  
  92   21 Mar 2023, 23:39 Lisa RandolphHEDHED Summary 21.3.Got the beam, aligned it up to the TCC,
mirrors in 3 mrad configuration, checked
positions for the CRLs. Energy up to 500 uJ
  
  96   22 Mar 2023, 17:07 Konstantin / Lisa / Carsten / Rahul / Toma / MasruriHEDLate shift summary22 Mar 2023, 17:08 started the log, the
aim for the shift is the alignment of the
sample and source point measurement. In addition
 7x 
  98   22 Mar 2023, 23:57 Lisa RandolphHEDHED shift summary 22.03.During the night we worked on the temporal
overlap between Relax laser and XFEL.

In the morning we noticed that
  
  95   22 Mar 2023, 23:57 Lisa RandolphHEDHED shift summary 22.03.During the night we worked on the temporal
overlap between Relax laser and XFEL.

In the morning we noticed that
  
  97   23 Mar 2023, 00:27 JP, Hauke, SamueleHEDShift summary - night shift22 Mar 2023, 23:30 Handover from late shift

Tasks for the night:


source point measurement
Sample
 7x 
  106   24 Mar 2023, 21:46 Lisa RandolphHEDHED shift summary 23.-24.3.8.2 keV, 1-2 bunches, 600uJ

23.3.


did timing runs and optimized
  
  108   25 Mar 2023, 21:01 Lisa RandolphHEDHED summary 25.3.This day we had lots of issues.


Nightshift noticed that
the mirror 2 feedback was not running anymore
  
  122   04 Apr 2023, 07:11 Lisa Randolph, Carsten Baehtz, Alexander PelkaHEDSummary day shift 2023-04-0404 Apr 2023, 07:44 we realize that the
SetpointsHED Macro lost all values, probably
during the Karabo Crash. Since it is a macro,
 FEL_imager_2023-04-04_08-09-58.png 
  125   07 Apr 2023, 23:00 Alejandro Laso GarciaHEDHED Shift Summary 07.04.Morning - Users from proposal 3455 continued
with their measurement program. Beam stable
during the measurements.
  
  131   09 Apr 2023, 00:03 Motoaki NakatsutsumiHEDShift summary HED 2022-09.752 keV, self-seeding, 700-800 uJ. 
Intensity is very stable, ponting is also
much stable than usual. very good beam.
  
  158   26 Apr 2023, 07:55 Alejandro Laso GarciaHEDHED Full day shift summary 25.04.Morning shift:

- First thing in the morning ~7
am, the MDL in the SASE 2 topic were down.
  
  160   27 Apr 2023, 07:51 Alejandro Laso GarciaHEDHED Full Day Summary 26.04.Morning shift:

- Tried to align the fiducial fiber
in IC1 for the streak cameras, however it
  
  197   10 May 2023, 09:51 karen appelHEDShift summaryfor 9th of May - 10th of May:
user experiment 2740 , first users with DIPOLE100-X
long pulse laser
  
  199   11 May 2023, 05:07 Konopkova ZuzanaHEDShift summarybeam parameters: 18 keV, 1 pulse on demand,
400 uJ

achieved:
  
  216   01 Jun 2023, 12:10 Konopkova ZuzanaHEDShift summaryX-ray parameters: 20 keV (20080 eV from
HIREX), 352 pulses, cca 250 uJ


changed setup to diamond
  
  220   03 Jun 2023, 09:42 Thomas PrestonHEDShift summaryX-ray parameters: 20 keV,  352 pulses,
ca 300 uJ


running user samples.


experiment
  
  221   03 Jun 2023, 13:42 Thomas PrestonHEDPulse energy has dropped to ~50% from this morning03 Jun 2023, 13:46

We called the BKR to ask what they
can do about our pulse energy being 50% (~160uJ
  
  223   04 Jun 2023, 14:53 Konopkova ZuzanaHEDShift summarybeam parameters: 20 keV, 300 uJ, 352 pulses


continuation of user programe.
Machine
performance very good for trying the 20 keV
  
  253   13 Jun 2023, 23:08 Konopkova ZuzanaHEDShift summarybeam: 18 keV, 352 pulses, ~200 uJ per pulse

achievements:


AGIPD timing scans, AGIPD
  
  254   15 Jun 2023, 06:41 Konopkova ZuzanaHEDShift summary18 keV, 150 uJ per pulse, 2.2 MHz


continuing user program
proposal 3285
X-ray heating and
  
  258   17 Jun 2023, 07:27 Konopkova ZuzanaHEDShift summaryBeam 18 keV, 0.5 MHz, long trains up to
~280 pulses


change setup to dynamic
  
  261   19 Jun 2023, 05:34 Konopkova ZuzanaHEDShift summary
concluded user experiment on dynamically
compressed water
long train operation
worked relatively stable with no major interuptions
  
  312   19 Aug 2023, 06:20 Konopkova ZuzanaHEDShift summarybeam parameters: 7.7 keV seeded, 2.2 MHz,
up to 20 pulses, 150 uJ/pulse


user program, measuring
  
  314   21 Aug 2023, 04:31 Konopkova ZuzanaHEDExperiment summarybeam: 7.7 keV seeded, ~300 uJ/pulse, 2.2
MHz, 20 pulses


user experiment finilized,
  
  331   05 Sep 2023, 22:33 Oliver HumphriesHEDShift summary
Received the beam from day shift,
aligned to beam stop (low signal due to 4m
air scatter, only 700uJ upstream)

ZYLA5
  
  336   08 Sep 2023, 06:22 Erik BrambrinkHEDShift summary
Improved the alignment procedure:

Using
the pin to make sure of the spatial overlap
SAXS
signal is used to make sure the pin is well
  
  337   09 Sep 2023, 07:00 Erik BrambrinkHEDShift summary
Data taken from 11 to cryo failure
Beam
conditions stable
Timing scan
for different energy
Operation
  
  357   23 Sep 2023, 07:59 Oliver HumphriesHEDShift summaryShift summary from Monday 18th 7am until
Saturday 7am

MONDAY


Aligned
  
  362   23 Sep 2023, 23:31 Motoaki NakatsutsumiHEDShift summaryDuring the morning shift (7am - 3pm), we
couldn't take any meaningful data due
to the issue of power glitch which caused
  
  390   15 Oct 2023, 04:43 Konopkova ZuzanaHEDShift summary
the initial 600-700 uJ of pulse
energy at the beginning of the user beamtime
dropped down to 300-350 uJ over night from
  
  391   16 Oct 2023, 05:05 Konopkova ZuzanaHEDExperiment summaryBeam parameters: 18.8 keV, 350-600 uJ,
1 pulse

Experiment: Shock compression experiments
  
  409   24 Oct 2023, 19:26 Thomas PrestonHEDIssueVacuum issue at HED

At 18:26 the vacuum failed in the
HED CRL3 chamber in the OPTs hutch. The vacuum
 Vac_issue_2023-10-24-18-50-16.png 
  423   28 Oct 2023, 14:52 Konopkova ZuzanaHEDShift summaryBeam parameters: 18 keV, 1 pulse, 600 uJ

- user beamtime started Friday,
the 27th and going smoothly until now and
  
  433   03 Nov 2023, 02:08 Johannes MoellerHEDShift summary
stable 18 keV SASE delivery
measurement
of siemens star in the morning
alignment
of phase plate for the nano focussing lenses
testing
  
  14   02 Feb 2023, 09:25 Peter ZaldenFXEShift summaryFXE bring-up, summary of shifts 31.1. and
1.2.:

Beam delivery (11.5 GeV)
  
  51   22 Feb 2023, 14:53 Peter ZaldenFXEStability IssueInstability observed today at 14:05, reported
to PRC and BKR, including RC: We saw RMS
jitter amplitude of up to 4 mm at FXE imager.
 2023-02-22-145134_250580044_exflqr37199.png 
  127   07 Apr 2023, 23:57 Yifeng JiangFXEIssueAfter receiving beam from SPB, we noticed
that there is a werid shape of beam in the
FEL imager which was not observed yesterday.
 2023-04-07-235513_774809068_exflqr51474.png 
  130   08 Apr 2023, 23:44 Yifeng JiangFXEIssueWe notice that 0.5 mm Silicon ATT in SASE1
causes holo beam profile in FEL imager. Maybe
this silicon att has been damaged.
 2023-04-08-234240_066894160_exflqr51474.png2023-04-08-234217_329678202_exflqr51474.png 
  212   28 May 2023, 23:15 Fernando ArdanaFXEShift summaryUser proposal 3273:


X-ray delivary

We
use several deliveraly modes:

Continous
  
  346   18 Sep 2023, 19:14 Yifeng JiangFXEIssue
We found that the x-ray pulse energy
dropped a lot when we changed the undulator
from 5.5 keV to 5.45 keV. We called BKR to
 11111.PNG3435.PNG 
  349   20 Sep 2023, 19:42 Peter ZaldenFXEIssueConnerning the phase shifter adjustment
after undulator gap scan via karabo:

At 19:30 FXE tested the scan change
  
  358   23 Sep 2023, 08:14 Peter ZaldenFXEIssueFXE interlock in fault state. See photo
attached with original error message from
6:53h. It cannot be reset by acknowledging.
 20230923_074956.jpg 
  367   24 Sep 2023, 09:16 Peter ZaldenFXEShift summarySummary for sept., 23rd

6:55 SPB just handed the beam over
to FXE when the power glitch killed the interlocks
  
  368   24 Sep 2023, 09:24 Peter ZaldenFXEShift summary7:00 Power glitch during SPB operation
- they were supposed to hand the beam back
at 7:30h
  
  19   29 Oct 2022, 11:03 Jaydeep Patel Jet alignment test- obeserver



Nozzle
type


Nozzle
  
  21   09 Feb 2023, 01:11 Jörg Hallmann Shift summary Feb 8thstable beam at 9kev (about 1.1 mJ)

checks of the sample environment
required for the upcoming user experiment
  
  27   12 Feb 2023, 01:56 Jörg Hallmann Shift summary Feb 11thintense data taking on various samples

2 main issues:

- data collection using the optimize
  
  37   16 Feb 2023, 23:01 Trey Guest End of ShiftStaff: KK, RB, TG, AS, CK

X-ray delivery


9.3 keV, 1-120 pulses,


Optical
  
  49   21 Feb 2023, 23:07 Jan-Etienne Pudell shift summary- Tunnel + experimental hutch alignment
(Mirrors, CRL1 and CRL2)

- Aligned main devices: Optics
  
  50   21 Feb 2023, 23:31 Thomas Baumann SASE1 changing photon energy changes the 2-color setup in SASE3We were set-up for 5.7 keV photon energy
in SASE1. We made a test with BKR to change
this energy to 9.3 keV. This had an effect
 Screenshot_from_2023-02-21_23-28-02_1.pngScreenshot_from_2023-02-21_23-35-20.png 
  52   23 Feb 2023, 01:51 Jan-Etienne Pudell shift summaryAfter realignement of M1 and M2 we could
solve the problem of the elogated beamprofile.
Different lens setting were prealignd for
  
  53   24 Feb 2023, 00:55 Jan-Etienne Pudell shift summaryWe tested pulse on demand scans with
scantool and confirmed that there is only
one shot per scan point. This was used to
  
  55   24 Feb 2023, 22:57 Alexey Zozulya Shift summary- Measured the speckle patterns using EPIX
detector to estimate the beamsize focused
down by 1D lens (Row 13).
  
  81   15 Mar 2023, 01:50 Johannes Moeller shift summary
HXRSS delivery, 600 - 700 uJ, 1
bunch, 8.991 keV. Pedestal visibly in HIREX,
not checked with MID spectrometer yet.
beamline
  
  84   16 Mar 2023, 01:35 Johannes Moeller End of shiftStable HXRSS delivery with >800 uJ,
1 bunch, 8.99 keV.

Re- Alignment of X-ray beam performed.
 Screenshot_from_2023-03-16_02-09-46.png 
  87   18 Mar 2023, 01:45 Johannes Moeller shift summary
stable HXRSS delivery at 8.99 keV,
1 bunch. XGM intensity during the day decreased
from 750 uJ to 600 uJ.
Vacuum
  
  88   19 Mar 2023, 02:01 Johannes Moeller shift summary
upper and lower branch of SDL aligned

beamsizes
and angular mismatch characterized


vacuum
leak of flight path fixed
side
 Screenshot_from_2023-03-19_02-11-16.png 
  93   21 Mar 2023, 19:35 Terry Mullins Finding t0 with the PAMAfter setting timing witht he diode, we
look at the PAM spectrometer and scan the
laser timing a bit.  We found a clear
 7x 
  124   04 Apr 2023, 11:18 Johan Bielecki XTD2 Si500 attenuator brokenAttachment 1: Beam in SPB hutch with Si500

Attachment 2: Beam without Si500
 Screenshot_from_2023-04-04_11-17-46.pngScreenshot_from_2023-04-04_11-18-04.png 
  140   19 Apr 2023, 02:14 Wonhyuk Jo Shift summary Achieved


Brought the X-ray to the
end of the beamline. 
Aligned
  
  145   20 Apr 2023, 02:26 Wonhyuk Jo Shift summaryAchieved


Brought the 800 nm of optical
pump laser to the hutch after the intervention. 
Found
  
  147   21 Apr 2023, 02:10 Wonhyuk Jo Shift summaryShift Summary


Collected optical laser-induced
dynamics in HfN and STO/SRO samples.
Jungfrau
  
  154   24 Apr 2023, 02:45 Ulrike Boesenberg shift summary


Beam came back quickly
after cryo-incident with ok seeding performance
  
  218   02 Jun 2023, 06:17 Tommaso Mazza pointing stabilitywe lost spatial overlap on several instances.

It seems that this happens when
SASE2 changes number of pulses.
 Screenshot_from_2023-06-02_03-14-16.png 
  251   13 Jun 2023, 06:49 Abhisakh Sarma Taking the beam BKR changed the beam energy from 15 keV
to 12.4 keV

Energy 12.4 keV
 Screenshot_from_2023-06-13_06-57-01.png 
  252   13 Jun 2023, 11:23 Raúl Villanueva-Guerrero Vacuum Leak in SA2-XTD1 Solid Attenuator - [SOLVED] - Closing report Dear all,

the closing report on this issue
can be found in the following Alfresco
  
  259   17 Jun 2023, 07:41 Faisal Hammad Mekky Koua Strange pulse behavior upstream XGM- Pulse intensity decreases drastically
at XTD2 across the train

- the visualisation of our beam
 Screenshot_from_2023-06-17_07-40-49.png 
  343   14 Sep 2023, 16:49 Thomas Baumann Summary: Night 13th and Day 14thThe late shift on the 13th fixed remaining
problems with the DLD and the calibration
pipeline.
  
  385   12 Oct 2023, 02:00 Tokushi Sato Shift summary 11.10.2023Staff: JK, CK, KL, AS

X-ray delivery


8.4 keV, up to 260 pulses
  
  413   25 Oct 2023, 02:43 Diogo Filipe Monrroy Vilan e Melo SASE 3 background heavily impacts our focusAttch 1: We were having trouble focusing
at IRU chamber. After multiple attempts the
best we could achieve was 2.9-3.1 um beam.
 Screenshot_from_2023-10-25_02-21-29.pngScreenshot_from_2023-10-25_02-36-16.pngScreenshot_from_2023-10-25_02-37-38.pngScreenshot_from_2023-10-25_02-42-21.png 
  412   25 Oct 2023, 06:02 Diogo Filipe Monrroy Vilan e Melo Shift SummaryStaff: DM, CK, KK

X-ray delivery


7.8keV, 2.4mj, stable delivery,
  
  419   26 Oct 2023, 06:48 Diogo Filipe Monrroy Vilan e Melo Shift summary 25.10.2023Staff: DM, CK, KK, JB, SR (SEC), LW (Uppsala
university), MM (GU)

X-ray delivery
  
  441   07 Nov 2023, 15:57 Janni Eidam KW44 - Leak in Solid AttenuatorThere was a leak in the Solid Attenuator
that increased on Saturday morning when SPB
moved the arm number 4 (see last
 20231106_180901.jpg20231106_175457.jpg20231106_175612.jpg20231106_185102_(1).jpg 
  458   24 Nov 2023, 05:07 Bjoern Senfftleben Sample Camera got stuck (likely at 11pm) and was only noticed at 5amAfter going in and reconnecting the camera,
we observe att. 1.

 
 Screenshot_from_2023-11-24_05-01-47.pngScreenshot_from_2023-11-24_05-09-07.pngScreenshot_from_2023-11-24_05-18-07.png 
  470   30 Jul 2024, 10:38 Antje Trapp Solid attenuator arm 5 limit switchOn 27th of July, it was reported that arm
5 of the solid attenuator did not stay
in 'out' position when retracted,
 6x 
ELOG V3.1.4-7c3fd00