Message ID: 14     Entry time: 02 Feb 2023, 09:25
Author: Peter Zalden 
Group: FXE 
Subject: Shift summary 

FXE bring-up, summary of shifts 31.1. and 1.2.:

Beam delivery (11.5 GeV)

  • 9.3 keV, 1.5 mJ (31.1.)
  • 7.1 keV, 1.7 mJ (1.2.)
  • Horizontal beam jitter 200 µm (RMS), a bit more than usual

Tunnel alignment

  • Align X-ray trajectory according to "fixed source" protocol with fixed TX of M3 in XTD9
  • References saved for two offset configurations
  • Beam transport diagnostics data taken to estimate source of jitter

Instrument Alignment Performed

  • After WMP, calibrate slits, lenses and attenuators to the beam trajectory
  • Check CRL performance after swap to new batch
  • Prepare beam focus for next user expt at 9.3 and 7.1 keV
  • Re-aligned FXE mono1 after 1st xtal swap

Issues

  • Camera FXE_XTD9_MONO-1 BEAMVIEW could not be instantiated: Solved by DOC (suggested restarting the KaraboGUI)
  • Issue with heater control on FXE mono: When switching ON in LOCAL mode it will apply max power; need to be in REMOTE first to control power via karabo
  • FXE_XTD9_MONO-1/MDL/PITCH could not be instantiated: Solved by DOC (default config was wrong)
  • SA1 DAQ PBM: DA01 in unknown state: Solved by DOC (IP misconfig.)

 

 