FXE bring-up, summary of shifts 31.1. and 1.2.:
Beam delivery (11.5 GeV)
- 9.3 keV, 1.5 mJ (31.1.)
- 7.1 keV, 1.7 mJ (1.2.)
- Horizontal beam jitter 200 µm (RMS), a bit more than usual
Tunnel alignment
- Align X-ray trajectory according to "fixed source" protocol with fixed TX of M3 in XTD9
- References saved for two offset configurations
- Beam transport diagnostics data taken to estimate source of jitter
Instrument Alignment Performed
- After WMP, calibrate slits, lenses and attenuators to the beam trajectory
- Check CRL performance after swap to new batch
- Prepare beam focus for next user expt at 9.3 and 7.1 keV
- Re-aligned FXE mono1 after 1st xtal swap
Issues
- Camera FXE_XTD9_MONO-1 BEAMVIEW could not be instantiated: Solved by DOC (suggested restarting the KaraboGUI)
- Issue with heater control on FXE mono: When switching ON in LOCAL mode it will apply max power; need to be in REMOTE first to control power via karabo
- FXE_XTD9_MONO-1/MDL/PITCH could not be instantiated: Solved by DOC (default config was wrong)
- SA1 DAQ PBM: DA01 in unknown state: Solved by DOC (IP misconfig.)
|