Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 133     Entry time: 10 Apr 2023, 02:16
Author: Jan Gruenert 
Group: XPD 
Subject: SPB_XTD9_IMGPII45 lost steps - REPAIRED 

REPAIRED / FIXED

Problem: The imager SPB_XTD9_IMGPII45 insertion motor lost steps and kept the machine to maximum 2 bunches per train.
Mitigation by DOC/EEE/PRC on 8 April 2023: made sure that screen seems actually out of beam and took imager out of interlock condition.
"Repair" by XPD on 10 April 2023 02h15:
a) recalibrated OUT position.
b) verified that EPS-OUT switch shows green when moving to OUT position in MDL.
c) put back the imager into the interlock conditions.
d) communication with BKR before and after the intervention (SPB and FXE didn't use the beam).
Repair instruction see: https://in.xfel.eu/elog/SASE1+technical+commissioning/2065

ELOG V3.1.4-7c3fd00