Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
OPERATION-2024
OPERATION-2023
OPERATION-2022
OPERATION-2021
OPERATION-2020
OPERATION-2019
SASE1-2018
SASE1-2017
Experiment data
OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn
Not logged in
List
|
Message ID:
174
Entry time:
04 May 2023, 14:34
Author:
Loic Le Guyader
Group:
SCS
Subject:
morning shift summary
achievements
we change the DSSC timing to record the first pulse
sample was getting damaged with 26mJ/cm2 and scattering of the sample was changed so we used lower fluence to observe t0 on the sample
changed to 2nd mono order, 20% GATT transmission and exit slit to 0.3 mm. The scattering signal was better
time zero was found on the sample, 4ps from coarse timing
dataset collected at room temperature, reproducing previous results from previous beamtime
cooling of sample set up and started
problems
with current setting, some pixels saturate around the DSSC central hole. This limits the X-ray fluence we can use.
sample cooling freezed
ELOG V3.1.4-7c3fd00