27
|
12 Feb 2023, 01:56 |
Jörg Hallmann | | Shift summary Feb 11th | intense data taking on various samples
2 main issues:
- data collection using the optimize |
|
37
|
16 Feb 2023, 23:01 |
Trey Guest | | End of Shift | Staff: KK, RB, TG, AS, CK
X-ray delivery
9.3 keV, 1-120 pulses,
Optical |
|
49
|
21 Feb 2023, 23:07 |
Jan-Etienne Pudell | | shift summary | - Tunnel + experimental hutch alignment
(Mirrors, CRL1 and CRL2)
- Aligned main devices: Optics |
|
50
|
21 Feb 2023, 23:31 |
Thomas Baumann | | SASE1 changing photon energy changes the 2-color setup in SASE3 | We were set-up for 5.7 keV photon energy
in SASE1. We made a test with BKR to change
this energy to 9.3 keV. This had an effect |
|
52
|
23 Feb 2023, 01:51 |
Jan-Etienne Pudell | | shift summary | After realignement of M1 and M2 we could
solve the problem of the elogated beamprofile.
Different lens setting were prealignd for |
|
53
|
24 Feb 2023, 00:55 |
Jan-Etienne Pudell | | shift summary | We tested pulse on demand scans with
scantool and confirmed that there is only
one shot per scan point. This was used to |
|
55
|
24 Feb 2023, 22:57 |
Alexey Zozulya | | Shift summary | - Measured the speckle patterns using EPIX
detector to estimate the beamsize focused
down by 1D lens (Row 13). |
|
81
|
15 Mar 2023, 01:50 |
Johannes Moeller | | shift summary |
HXRSS delivery, 600 - 700 uJ, 1
bunch, 8.991 keV. Pedestal visibly in HIREX,
not checked with MID spectrometer yet.
beamline |
|
84
|
16 Mar 2023, 01:35 |
Johannes Moeller | | End of shift | Stable HXRSS delivery with >800 uJ,
1 bunch, 8.99 keV.
Re- Alignment of X-ray beam performed. |
|
87
|
18 Mar 2023, 01:45 |
Johannes Moeller | | shift summary |
stable HXRSS delivery at 8.99 keV,
1 bunch. XGM intensity during the day decreased
from 750 uJ to 600 uJ.
Vacuum |
|
88
|
19 Mar 2023, 02:01 |
Johannes Moeller | | shift summary |
upper and lower branch of SDL aligned
beamsizes
and angular mismatch characterized
vacuum
leak of flight path fixed
side |
|
93
|
21 Mar 2023, 19:35 |
Terry Mullins | | Finding t0 with the PAM | After setting timing witht he diode, we
look at the PAM spectrometer and scan the
laser timing a bit. We found a clear |
7x |
124
|
04 Apr 2023, 11:18 |
Johan Bielecki | | XTD2 Si500 attenuator broken | Attachment 1: Beam in SPB hutch with Si500
Attachment 2: Beam without Si500 |
|
140
|
19 Apr 2023, 02:14 |
Wonhyuk Jo | | Shift summary | Achieved
Brought the X-ray to the
end of the beamline.
Aligned |
|
145
|
20 Apr 2023, 02:26 |
Wonhyuk Jo | | Shift summary | Achieved
Brought the 800 nm of optical
pump laser to the hutch after the intervention.
Found |
|
147
|
21 Apr 2023, 02:10 |
Wonhyuk Jo | | Shift summary | Shift Summary
Collected optical laser-induced
dynamics in HfN and STO/SRO samples.
Jungfrau |
|
154
|
24 Apr 2023, 02:45 |
Ulrike Boesenberg | | shift summary |
Beam came back quickly
after cryo-incident with ok seeding performance |
|
218
|
02 Jun 2023, 06:17 |
Tommaso Mazza | | pointing stability | we lost spatial overlap on several instances.
It seems that this happens when
SASE2 changes number of pulses. |
|
251
|
13 Jun 2023, 06:49 |
Abhisakh Sarma | | Taking the beam | BKR changed the beam energy from 15 keV
to 12.4 keV
Energy 12.4 keV |
|
252
|
13 Jun 2023, 11:23 |
Raúl Villanueva-Guerrero | | Vacuum Leak in SA2-XTD1 Solid Attenuator - [SOLVED] - Closing report | Dear all,
the closing report on this issue
can be found in the following Alfresco |
|