Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 95     Entry time: 22 Mar 2023, 23:57
Author: Lisa Randolph 
Group: HED 
Subject: HED shift summary 22.03. 

During the night we worked on the temporal overlap between Relax laser and XFEL.

In the morning we noticed that the beam jitter is quite large (in and out of the aperture of the CRL4 lenses). There seems to be a correlation with the HED popin. We adjusted the TCC with x-ray and laser. Performed transmission scans.

We managed to see the direct beam on JF. Continued with sample alignment (grazing-incidence) and also aligned the beamblocks to block the direkt and the reflected beam.

ELOG V3.1.4-7c3fd00