Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 402     Entry time: 22 Oct 2023, 00:27
Author: Raphael de Wijn 
Group: SPB 
Subject: Shift summary 

X-ray delivery

  • 13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.
  • Beam down until around 1PM.
  • After agreement with FXE, we could collect data until midnight.

Optical laser delivery

  • 800 nm, 50 fs, 1 to 176 pulses at 564 kHz pumping TOPAS at 475 nm.
  • PP laser down for ~4h. Facility cooling water for the AMPHOS chiller was down, solved by LAS and TS OCD (controller had to be replaced).

Achievements/Observations

  • PP laser and X-ray spatial and timing overlap.
  • Collected pump-probe data ~1.5h until PP laser down, then dark data on a different sample and then again ~1.5h pump-probe at the end of the shift

Issues

  • Beam down in the morning.
  • PP laser down in the evening.
ELOG V3.1.4-7c3fd00