Message ID: 466     Entry time: 25 Jan 2024, 14:57
Author: Antje Trapp 
Group: XRO 
Subject: end of shift summary 

It was possible to align to HED in parasitic mode to seeding tests

mirror horizontal position (coating stripes) was optimized as far as possible under parasitic conditions

vertical motors calibration and EulerMDL calibration still to be done - collimated beam needed for that.