Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 428     Entry time: 01 Nov 2023, 02:22
Author: Johannes Moeller 
Group: MID 
Subject: Shift summary 
  • stable delivery of 1mJ at 18keV SASE
  • succesful beamline alignment for MID (CRLs + M1 and M2) with mono.
  • alignment of NAFO stack to DES and zyla camera with SASE and monochromatic beam
  • setup of DES spectrometer for 18keV on 440 reflection with SASE
  • timing of PP laser with perpendicular excitation condition with diode and YAG

Problems:
Mirror M2 needs 30min to move from SASE to Mono position

ELOG V3.1.4-7c3fd00