Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
OPERATION-2024
OPERATION-2023
OPERATION-2022
OPERATION-2021
OPERATION-2020
OPERATION-2019
SASE1-2018
SASE1-2017
Experiment data
OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn
Not logged in
List
|
Message ID:
285
Entry time:
02 Aug 2023, 06:44
Author:
Giuseppe Mercurio, Teguh Asmara
Group:
SCS
Subject:
shift summary
achievements:
beam transport with the second half of undulators closed
measured pulse energy in SCS hutch and verified that the transmission of the beamline with hr grating is as previously reported
knife edge scans along vertical direction to find focus (<=11 um) and horizontal direction to have 175 um
half clip scans to find center of rotation
aligned Cu and Ni ML (theta offset) to find signal of Cu and Ni at hrixs
delivered the beam at the hrixs ccd camera
problems:
all the undulator cells were closed instead of only the second half of the undulators
plan:
optimize energy resolution at hrixs at Ni L edge (priority)