Stable HXRSS delivery with >800 uJ, 1 bunch, 8.99 keV.
Re- Alignment of X-ray beam performed.
-Beam position defined for sample interaction in SAM CAM1. Do not touch SAM CAM1
-X-ray beam (unfocused and focused) is now going through LIC & 45 deg mirror. Updated M2 feedback setpoint.
-CRL2 has been aligned to the new position.
-Lower branch SDL aligned. Not on Sample interaction point.
-LIC mirty moved out -63 mm (in at 6 mm)
Status now:
We moved lower branch out. CRL2 left in.
We have left the direct beam (no branch) on the X-ray eye and inline microscope.
We have left some diamond in the OPt Hutch Att for running feedback and HIREX
To do:
- Bring both branches to the sample interaction point in SAM CAM1.
- Aligment upper branch
- Spatial overlap laser and X-ray
- temporal overlap with diode (from laser and lower branch?)
- Beamsize analysis of both branches
|