Group Selection Page HELP Controls Group ITDM Vacuum WP78 SPB SQS XO ToBeMigrated2XWiki ToBeMigrated2GitlabPages ToBeMigratedByGroup Migrated2Zulip Archived2PDF not2MigrateOrArchive
SCS SXP Migrated2Zulip Photon Commissioning Team XRO DOC HED Migrated2Zulip WP74 MID PSPO_XO XO_Operation SQS Migrated2Zulip FXE Migrated2Zulip DET Sample Environment SPB Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 132     Entry time: 10 Apr 2023, 02:25
Author: Jan Gruenert 
Group: XPD 
Subject: Issue 

REPAIRED / FIXED

Problem: The imager SPB_XTD9_IMGPII45 insertion motor lost steps and kept the machine to maximum 2 bunches per train.
Mitigation by DOC/EEE/PRC on 8 April 2023: made sure that screen seems actually out of beam and took imager out of interlock condition.
Repair by XPD on 10 April 2023 02h15: 
a) recalibrated OUT position.
b) verified that EPS-OUT switch shows green when moving to OUT position in MDL.
c) put back the imager into the interlock conditions.
d) communication with BKR before and after the intervention (SPB and FXE didn't use the beam).
Repair instruction see: https://in.xfel.eu/elog/SASE1+technical+commissioning/2065