Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 106     Entry time: 24 Mar 2023, 21:46
Author: Lisa Randolph 
Group: HED 
Subject: HED shift summary 23.-24.3. 

8.2 keV, 1-2 bunches, 600uJ

23.3.

  • did timing runs and optimized the beamline alignment
  • Karabo was working very slow
  • continued with sample alignment
  • performed several xfel+laser shots
  • opened the chamber and replaced samples

24.3.

  • aligned xfel and Relax to TCC
  • sample alignment
  • taking shots
ELOG V3.1.4-7c3fd00