Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 2     Entry time: 16 Jan 2023, 16:01
Author: karen appel 
Group: HED 
Subject: CRL3: recalibration of y axis, test of x range and move to SEPS interlock trigger position 

CRL3 arm 2, 5 and 9 were mecanically religned to the V groove and retracted to some y position.

The y motor position was recalibrated by moving the motor to the lower limit switch, moving it up by 0.5 mm and then recalibrating the motor and encoder position to the former software limit position.

In that down position, the x range was tested by moving into the limit switches:

arm 2 x -1.213 to 0.824

arm 5 x -1.22 to 1.73

arm 9 x -0.32 to 2.256

The x limit switches were not changed and also the motor x axis were not recalibrated.

After that the x and y motors were moved to the x and y out position as stored in the CRL3 MDL. In that position, it was confirmed that all SEPS interlocks are triggered.

CRL3 is thus set-up for the SEPS testing, that will take place on the 24th of January.

 

 

ELOG V3.1.4-7c3fd00