SPB/SFX In-house research 4978 shift 3 - end
X-ray delivery
- 9.3 keV 352 pulses / train, relatively stable intensity ~1.9 mJ / pulse
- beam down ~30 min
Optical laser delivery
Achievements/Observations
- Collected several runs for the in-line crystallisation project but some difficulties to inject, probably a coating issue
- Saw a lot of crystals
Issues
- Realised that there seems to be a vacuum leak from the load lock valve. Optimal pressure is only achieved when the load lock pump is running.
|