Subject: Shift summary 

- Measured the speckle patterns using EPIX detector to estimate the beamsize focused down by 1D lens (Row 13).

- Heat load test to NFL #18 with 50 bunches.

- Measured the speckle patterns with 2D focusing lens to estimate the beamsize. wire edge scan?

- Local optics hexapod had some issue in moving while alignment. DOC helped us to solve it.

-Sample hexapod is not working, need to be checked in the morning.

 