Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 158     Entry time: 26 Apr 2023, 07:55
Author: Alejandro Laso Garcia 
Group: HED 
Subject: HED Full day shift summary 25.04. 

Morning shift:

- First thing in the morning ~7 am, the MDL in the SASE 2 topic were down. Even the watchdog which prevented us from moving SA2 attenuators. DOC quickly resolved the issue (10 min).

- Beam alignment down to the IBS. X-ray mirrors at 2 mrad. Approximately 85% transmission through the beamline.

- Transmission DAQ runs for cross calibration of devices.

- Focus at TCC in IC2 with CRL1 arms 6 and 8 and CRL3 arms 5 and 9. Focus of around 10 um.

- At around 14:00 the problem with the MDL in SASE2 topic happened again. Was again resolved by DOC.

 

Late shift:

- Timing setup for SOP and Visar systems, found timing on both systems.

 

Night shift:

- Improving the imaging quality of SOP and Visar. Did not manage entirely.

- DiPOLE timing setup.

ELOG V3.1.4-7c3fd00