Group Selection Page
HELP
Controls Group
ITDM
Vacuum
WP78
SPB
SQS
XO
ToBeMigrated2XWiki
ToBeMigrated2GitlabPages
ToBeMigratedByGroup
Migrated2Zulip
Archived2PDF
not2MigrateOrArchive
|
|
SCS
SXP Migrated2Zulip
Photon Commissioning Team
XRO
DOC
HED Migrated2Zulip
WP74
MID
PSPO_XO
XO_Operation
SQS Migrated2Zulip
FXE Migrated2Zulip
DET
Sample Environment
SPB Migrated2Zulip
|
|
OPERATION-2025
OPERATION-2024
OPERATION-2023
OPERATION-2022
OPERATION-2021
OPERATION-2020
OPERATION-2019
SASE1-2018
SASE1-2017
Experiment data
|
| OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn |
Not logged in |
 |
|
|
|
|
Message ID: 179
Entry time: 05 May 2023, 06:33
Reply to this: 180
|
| Author: |
Giuseppe Mercurio, Diego, Martin, Amina |
| Group: |
SCS |
| Subject: |
Shift summary |
|
|
achievements:
- inserted the magnet and measured delay scan at the maximum magnetic field with opposite directions
- data analysis showed that runs measured during the afternoon/evening led to sample degradation (the sample shows a dark spot, change in the scattering signal is also cearly visible)
- corrected spatial overlap
- moved to gresh spot and did delay scan at lower OL fluence (Tr = 35% instead of 70%)
problems:
- shortly before 23:00 the optical laser synchronization was lost for a bit more than 2 hours, then it came back shortly after 1 am at that time the PP laser phase shifter when optically lock moved from 1018 to 229.8 apparently on its own, and it was realized few hours later. We moved it back to the original value, but this was not sufficient, we had to move by several ns and we were not able to move where we wanted, Laser OCD was called a7 7:35.
|