Group Selection Page
HELP
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
EEE
WP78
FXE
SPB
MID
HED
SQS
SXP
Sample Environment
Operation
PSPO
XO
TS
Migrated2Zulip
OPERATION-2025
OPERATION-2024
OPERATION-2023
OPERATION-2022
OPERATION-2021
OPERATION-2020
OPERATION-2019
SASE1-2018
SASE1-2017
Experiment data
OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn
Not logged in
List
|
Message ID:
291
Entry time:
06 Aug 2023, 15:55
Author:
Ben, Justina
Group:
SCS
Subject:
Morning Shift Summary
Achievements
Moved spectrometer to 1000 ln/mm and began alignment
Plan for next shift
Continue optimization of spectrometer with 1000 ln/mm grating
Problems
At some point we lost signal from the spectrometer and it took some time to find it
There were several beam lossed between 12 and 13h
ELOG V3.1.4-7c3fd00