SA3 SCS exit slit: the upper blade was detached from the motor and fall into closed position. Maurizio V. and F. Wolff-Fabris tried to move it out of the beam by placing spacers to hold the blade up.
Bottom blade was moved down with the motors. Currently both motors are disconnected.
*** Update 14.02 10AM:
This morning the exit slit was clipping the beam. Another ZZ by M. Dommach, M. Petrich and F. Wolff-Fabris was done to move up the top blade by a further 8mm.
After that intervention SCS confirmed to see the beam at the Pop-in and at the experimental hutch. |