Group Selection Page HELP Controls Group ITDM Vacuum WP78 SPB SQS XO ToBeMigrated2XWiki ToBeMigrated2GitlabPages ToBeMigratedByGroup Migrated2Zulip Archived2PDF not2MigrateOrArchive
SCS SXP Migrated2Zulip Photon Commissioning Team XRO DOC HED Migrated2Zulip WP74 MID PSPO_XO XO_Operation SQS Migrated2Zulip FXE Migrated2Zulip DET Sample Environment SPB Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 30     Entry time: 13 Feb 2023, 19:02
Author: Frederik Wolff-Fabris 
Group: PRC 
Subject: Issue 

SA3 SCS exit slit: the upper blade was detached from the motor and fall into closed position. Maurizio V. and F. Wolff-Fabris tried to move it out of the beam by placing spacers to hold the blade up.

Bottom blade was moved down with the motors. Currently both motors are disconnected.

*** Update 14.02 10AM:

This morning the exit slit was clipping the beam. Another ZZ by M. Dommach, M. Petrich and F. Wolff-Fabris was done to move up the top blade by a further 8mm. 

After that intervention SCS confirmed to see the beam at the Pop-in and at the experimental hutch.