Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
OPERATION-2024
OPERATION-2023
OPERATION-2022
OPERATION-2021
OPERATION-2020
OPERATION-2019
SASE1-2018
SASE1-2017
Experiment data
|
OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn |
Not logged in |
|
|
Message ID: 308
Entry time: 17 Aug 2023, 11:07
|
Author: |
Teguh Citra Asmara, Eugenio Paris |
Group: |
SCS |
Subject: |
Morning Shift Summary on 16.08.2023 |
|
|
Achievements:
- Performed tr-RIXS on peak A, B, and C at 2.4 mJ/cm^2
- Performed tr-XAS on peak A at 3 fluences
- Performed tr-RIXS on peak A at 4 mJ/cm^2
Problems:
- BAM delay line compensator was not working due to incorrect macro. DOC and LM fixed the issue.
- Delay line scan of hRIXS camera was not working as it was still configured for Viking. MT fixed the issue.
- The new centroiding algorithm (provided natively by the 4137 kernel) is not consistent with integration mode. For the time being, we use an older, manually configured centroiding algorithm developed for a previous user beamtime.
- tR-XAS results show large changes, but these large changes were not reflected in tr-RIXS.
|