OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn |
Not logged in |
 |
|
Message ID: 94
Entry time: 22 Mar 2023, 21:49
|
Author: |
Adam Round |
Group: |
SPB |
Subject: |
Shift end |
|
|
X-ray delivery
- 9 keV 1 to 165 pulses ~ 300 mj per pulse - stable delivery during the day
Optical laser delivery
- ns lasers for illumination only
Achievements/Observations
- Focus alignment
- found illumination / shield (100 micron) conditions to optimise background on detector
- observed that the flourecence signal on the diode was very low and this appears corelated with drift in the focus - after focus optimisation signal was again visible
- several runs collected with varying attenuation with the aim to try to corelate flourecence signal on diode with beam intensity
Issues
- Too high background from sample at full transmission required exchange of copper shield form 50 to 100 microns
- disc detaching from motor spindle (twice) - first time disc blocked gate valve, second bolt and washer are in the gate valve mechanisme space