achievements:

  • calibration of exit slits
  • measurement of Cu L3 edge
  • moved hRIXS to nominal settings for Cu L3 edge

problems:

  • hRIXS motors could not be moved remotely, the problem was finally understood: GTZ had been moved manually into an interlock condition, going then to remote operation bring the motors to error state, it is then impossible to go out of error state from remote operation if there is also an interlocked state. In this case, the solution is to move the motor away from interlock state manually and then move to remote operation.
  • vavle with filters in front of grating chamber cannot be moved: problem unsolved, please Martin have a look at it.
  • DA online analysis tool for XAS was not working, DAC contacted Oleksey from DA and problem was fixed

plan:

  • optimize beam dimension for hRIXS
  • find rixs signal and optimize resolution