Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
OPERATION-2024
OPERATION-2023
OPERATION-2022
OPERATION-2021
OPERATION-2020
OPERATION-2019
SASE1-2018
SASE1-2017
Experiment data
|
OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn |
Not logged in |
|
|
Message ID: 336
Entry time: 08 Sep 2023, 06:22
|
Author: |
Erik Brambrink |
Group: |
HED |
Subject: |
Shift summary |
|
|
- Improved the alignment procedure:
- Using the pin to make sure of the spatial overlap
- SAXS signal is used to make sure the pin is well centered on the X-ray beam path
- YAG is only used in combination with ILM to fix with ~5 um precision the height of the beam (moving CRLs on laser focus) and the temporal overlap.
- Recording of the different laser foc planned to be used during the experiment: no aperture, 40 mm, 25 mm, 15 mm diameter
Note:
- Jet failed a couple of time
- We lost the Sync system for 2 hours, got it back again for 30 min, then lost it again
|