Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, all entries  Not logged in ELOG logo
ID Date Authordown Group Subject Text Attachments
  12   04 Feb 2024, 23:36 Wonhyuk JoMIDShift summaryGoal Achieved.
- Finished flat field measurement
for AGIPD at different scenarios for upcoming
  
  144   11 Aug 2024, 02:15 Wonhyuk JoMIDShift summaryFound the spatial overlap on the Suna microscope
with Zyla.
Found the SDL motor position giving
  
  147   12 Aug 2024, 02:07 Wonhyuk JoMIDShift summaryFound spatial overlap at Suna microscope
with Zyla cam.
The splitting ratio was obtained about
  
  149   13 Aug 2024, 02:04 Wonhyuk JoMIDShift summaryFound the interference fringe at Suna microscope
with Zyla cam from MID split-and-delay line. 
The fringe patterns were recorded
  
  164   13 Sep 2024, 02:16 Wonhyuk JoMIDShift summary- DAQ was crashed after taking darks of
AGIPD. It was solved by DOC and OCD.

- Laser could not switched from
  
  167   14 Sep 2024, 02:23 Wonhyuk JoMIDShift summary- The seeding optimization result: Total
450 uJ (Seeding of 150 uJ  + SASE of
300 uJ).  BKR will be able to start
  
  169   15 Sep 2024, 02:16 Wonhyuk JoMIDShift summary- The seeding optimization is ongoing,
which was not successful. Now we have a total
of 170 uJ including SASE and seeding. 
  
  171   16 Sep 2024, 02:21 Wonhyuk JoMIDShift summary- Pump-probe experiments are being conducted
using PuMa and PP laser. 
- The user program is ongoing over
  
  103   13 May 2024, 08:48 Ulrike BoesenbergMIDShift summaryWeekend summary:

Overall stable beam delivery with
300bunches @18keV and 750uJ
  
  196   31 Oct 2024, 02:43 Ulrike BoesenbergMIDShift summary12.389keV, HXRSS, 1-400+ bunches, 450uJ


Seeding alignment
Beamline
alignment (Mirror + foccussing)
Measured
  
  27   17 Feb 2024, 08:15 Tommaso MazzaSQSIssueThe cross on the FEL imager, which we use
as a reference for BKR crew, is not centred
on the GATT aperture. when was this changed,
 Screenshot_from_2024-02-17_08-12-43.pngScreenshot_from_2024-02-17_08-17-03.pngScreenshot_from_2024-02-03_16-06-39.png 
  53   15 Mar 2024, 18:02 Tommaso MazzaSQSStability Issueit is not clear why, but the beam position
on BIU2 has changed over time, even more
since we checked last. it is off in both
 Screenshot_from_2024-03-15_18-04-59.pngScreenshot_from_2024-03-15_18-04-39.png 
  98   09 May 2024, 10:45 Tommaso MazzaSQSotherwe needed SASE1 to be set to 0 pulses briefly
to check alignment in our experiment.

The FXE control hutch was empty.
  
  213   04 Dec 2024, 07:12 Tomas PopelarSPBShift summaryX-ray delivery

19 keV, ~ 400  - 450 uJ, 1
- 128 pulses, stable delivery
  
  16   08 Feb 2024, 23:14 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1700
uJ. Stable delivery


Optical
  
  18   10 Feb 2024, 00:12 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1700
uJ. Stable delivery


Optical
  
  19   10 Feb 2024, 23:32 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1750
uJ. Stable delivery


Optical
  
  21   11 Feb 2024, 23:04 Tokushi SatoSPBShift summaryX-ray delivery
1-350 at 12.45 keV, 1700 uJ. Stable
delivery
  
  22   13 Feb 2024, 01:02 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1600
uJ. Stable delivery


Optical
  
  28   21 Feb 2024, 23:00 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 250
pulses per train. 1.1 MHz with 400 uJ

Optical laser delivery: NA
  
  30   22 Feb 2024, 22:52 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 190
pulses per train. 1.1 MHz with 200 uJ short
intervention needed to improve intensity
  
  31   23 Feb 2024, 23:03 Tokushi SatoSPBShift summaryX-ray delivery:

stable and flat over 190 pulses
per train. 1.1 MHz with ~200 uJ
  
  35   25 Feb 2024, 22:54 Tokushi SatoSPBShift summaryX-ray delivery


9.10 keV; 190 pulses per
train @1.1 MHz with roughly 170-200 uJ; stable
  
  154   25 Aug 2024, 22:37 Tokushi SatoSPBShift summaryX-ray delivery

-12.40
- 12.82 keV, XDT9 XGM ~0.85 mJ, 3 hours interruption
  
  155   26 Aug 2024, 23:05 Tokushi SatoSPBShift summaryX-ray delivery

-12.40 - 12.82 keV, ~1.3 mJ

Optical laser delivery
  
  158   08 Sep 2024, 06:44 Tokushi SatoSPBShift summaryX-ray delivery

12.8 keV, ~0.8 mJ

Achievements/Observations
  
  190   01 Oct 2024, 02:39 Tokushi SatoSPBShift summaryX-ray delivery

    6 keV, ~2.8 mJ, continuous
beam drift in both direction
  
  211   30 Nov 2024, 23:01 Tokushi SatoSPBShift summaryX-ray delivery

19 keV, ~550 uJ, 1 - 128 pulses,
stable delivery
  
  212   01 Dec 2024, 23:07 Tokushi SatoSPBShift summaryX-ray delivery

19 keV, ~450 uJ, 1 - 128 pulses,
stable delivery
  
  112   26 May 2024, 21:56 Thomas BaumannSQSStability IssueWe asked the machine for two color mode
in the morning. Tuning gave good results
at first (1.6mJ second color, 100uJ first
  
  7   01 Feb 2024, 21:56 Romain LetrunSPBIssueAt 21:29:20 today, the number of bunches
in SASE1 was increased from 1 to 352 without
intervention of the SPB/SFX shift crew. 30
 Screenshot_from_2024-02-01_21-52-15.pngScreenshot_from_2024-02-01_21-31-53.png 
  8   02 Feb 2024, 00:04 Romain LetrunSPBShift summaryX-ray delivery


1-352 pulses at 10 keV,
1200 - 400 uJ.
Significant pulse
  
  10   02 Feb 2024, 23:31 Romain LetrunSPBShift summaryX-ray delivery


1-64 pulses at 10 keV,
~1.1 mJ.
Overall stable delivery.


Optical
  
  24   13 Feb 2024, 08:52 Romain LetrunSPBIssueLike after the previous winter maintenance
period, the shutter of FXE appears as opened
in DOOCS panels even though it is closed
 Screenshot_from_2024-02-13_08-51-02.png 
  26   15 Feb 2024, 09:32 Romain LetrunSPBShift summaryX-ray delivery


1 to ~332 pulses at 6 keV,
4.5 mJ
Stable delivery
Number
  
  37   27 Feb 2024, 09:56 Romain LetrunSPBIssueThe status of the XTD2 attenuators has
been checked during the experiment last week
and many were found to cause disturbances
 8x 
  41   29 Feb 2024, 10:04 Romain LetrunSPBShift summaryX-ray
delivery


10
  
  43   01 Mar 2024, 10:54 Romain LetrunSPBShift summaryX-ray delivery


10 keV, up to 128 pulses
with custom bunch pattern, 1.6-2.0 mJ


Optical
  
  46   04 Mar 2024, 09:42 Romain LetrunSPBIssueThe number of bunches during the last night
shift kept being changed down to 24 by the
device SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020
 xtd2_att_watchdog.png 
  48   13 Mar 2024, 10:09 Romain LetrunSPBStatusWe checked the XTD2 attenuators following
the intervention from XRO (compar ewith elog:37, before the intervention).
 7x 
  52   15 Mar 2024, 07:08 Romain LetrunSPBIssueThere are now two watchdogs for the XTD2
attenuator running at the same time


SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020
SA1_XTD2_OPTICS_PROTECTION/MDL/ATT1


that
 Screenshot_from_2024-03-15_07-07-40.png 
  67   30 Mar 2024, 06:59 Romain LetrunSPBIssueDOOCS panels are again incorrectly reporting
the FXE shutter as opened when it is in fact
closed. This had been fixed after it was
 Screenshot_from_2024-03-30_06-58-42.png 
  97   09 May 2024, 07:14 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  100   10 May 2024, 07:06 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  101   11 May 2024, 07:20 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  102   12 May 2024, 07:35 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  104   13 May 2024, 10:36 Romain LetrunSPBShift summaryX-ray
delivery


11.56
  
  106   14 May 2024, 11:49 Romain LetrunSPBShift summaryX-ray delivery


11.56 keV, 1-197 pulses
@ 564 kHz, 2.6 mJ.


Optical
  
  111   26 May 2024, 00:23 Romain LetrunSPBShift summaryX-ray delivery


6.0 keV, up to 202 pulses
at 564 kHz and 101 at 282 kHz, 0.8-1.6 mJ
Low
  
  113   26 May 2024, 23:23 Romain LetrunSPBShift summaryX-ray delivery


6.0 keV, up to 202 pulses
at 564 kHz, 1.8-1.9 mJ.
Stable
  
  115   27 May 2024, 23:33 Romain LetrunSPBShift summaryX-ray
delivery


6.0 keV, up to 202 pulses
  
  116   04 Jun 2024, 23:38 Romain LetrunSPBShift summaryX-ray
delivery


7.0 keV, up to 202 pulses
  
  117   05 Jun 2024, 23:22 Romain LetrunSPBShift summaryX-ray
delivery


7.0 keV, up to 202 pulses
  
  135   27 Jul 2024, 23:42 Romain LetrunSPBShift summaryX-ray delivery
- 9.22 and 11.0 keV, 1-352 pulses
@ 1.1 MHz, 600-1400 uJ.
  
  136   28 Jul 2024, 23:34 Romain LetrunSPBShift summaryX-ray
delivery


11.0 keV, 1-352 pulses
  
  138   29 Jul 2024, 23:22 Romain LetrunSPBShift summaryX-ray
delivery


11.0 keV, 1-351 pulses
  
  142   10 Aug 2024, 07:19 Romain LetrunSPBIssueThe SASE1 HIREX interlock is not working
as expected.

At the position 'OUT' (step
 Screenshot_from_2024-08-10_07-17-38.png 
  145   11 Aug 2024, 14:33 Romain LetrunSPBShift summarySummary 06.08
- 10.08

X-ray
  
  160   09 Sep 2024, 06:52 Romain LetrunSPBShift summaryX-ray
delivery


12.8
  
  162   10 Sep 2024, 07:26 Romain LetrunSPBShift summaryX-ray
delivery


12.8 keV, 1-20 pulses at
  
  99   10 May 2024, 00:04 Rebecca BollSQSIssueour pp laser experienced timing jumps by
18 ns today. this happened for the first
time at ~7:30 in the morning without us noticing
  
  110   25 May 2024, 02:38 Rebecca BollSQSIssueToday in the afternoon, SASE1 was tuned
(a description of the activities in att 4).
We now realize that this has in some form
 Run_177_vs_247.pngScreenshot_from_2024-05-25_00-44-46.pngScreenshot_from_2024-05-25_01-03-29.pngScreenshot_from_2024-05-25_01-36-54.png 
  96   08 May 2024, 13:51 Raúl Villanueva-GuerreroPRCIssueDear all,

Due to a probable issue at the
SA1 Transmissive imager, the "OUT"
 image_2024-05-08_135756593.pngimage_2024-05-08_140027070.pngimage_2024-05-08_140101131.pngimage_2024-05-08_140228955.png 
  174   25 Sep 2024, 10:12 Raúl Villanueva-GuerrerootherIssueIssue with SA3 Gas attenuator (SA3_XTD10_GATT)
- SOLVED

Dear all,

after the reported issue by SQS
  
  45   04 Mar 2024, 06:52 Raphael de WijnSPBShift summary
X-ray
delivery


10 keV, up to 128 pulses
  
  59   21 Mar 2024, 06:33 Raphael de WijnSPBShift summaryX-ray delivery
- 9.3 keV, >3 mJ/pulse, stable
delivery 
  
  61   22 Mar 2024, 06:35 Raphael de WijnSPBShift summaryX-ray delivery
- 9.3 keV, >3 mJ/pulse, beam down
around 30min
  
  72   04 Apr 2024, 06:48 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 1

X-ray delivery:
  
  73   05 Apr 2024, 07:14 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 2

X-ray delivery:
  
  74   06 Apr 2024, 07:06 Raphael de WijnSPBShift summaryStaff: MS, RB, PS, RdW

In-house/commissioning beam time
summary night 3
  
  75   07 Apr 2024, 07:04 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 4

X-ray delivery:
  
  86   22 Apr 2024, 00:06 Raphael de WijnSPBShift summary
User
beamtime 5157 day 5

X-ray delivery:
  
  87   22 Apr 2024, 23:26 Raphael de WijnSPBShift summaryEnd of User beamtime 5157


X-ray
delivery:
  
  146   11 Aug 2024, 23:07 Raphael de WijnSPBShift summaryX-ray delivery

11.56 keV 202 pulses @0.5 MHz,
~1.0 mJ
  
  148   12 Aug 2024, 23:47 Raphael de WijnSPBShift summary
X-ray
delivery

11.56 keV, 202 pulses @0.5 MHz,
  
  150   21 Aug 2024, 23:34 Raphael de WijnSPBShift summaryX-ray delivery

12.40 - 12.82 keV, ~1.1 mJ

Optical laser delivery
  
  151   22 Aug 2024, 23:15 Raphael de WijnSPBShift summaryX-ray delivery

12.40 - 12.82 keV, ~1.1 mJ

Optical laser delivery
  
  168   14 Sep 2024, 23:13 Raphael de WijnSPBShift summaryX-ray delivery
8.951 keV, 1.2 mJ up to 30pulses at
113 kHz
  
  170   15 Sep 2024, 23:12 Raphael de WijnSPBShift summaryX-ray delivery
8.951 keV, 1.6 mJ up to 16 pulses
at 113 kHz
  
  197   03 Nov 2024, 00:00 Raphael de WijnSPBShift summaryX-ray delivery

12.5 keV,
~1.6 mJ
  
  203   23 Nov 2024, 07:09 Raphael de WijnSPBShift endEnd of in-house
8496

X-ray
  
  29   22 Feb 2024, 06:13 Peter ZaldenFXEShift summaryBeam conditions:


Used photon energies between
6 and 7 keV, including short undulator scans
Continuously
  
  38   28 Feb 2024, 06:57 Peter ZaldenFXEIssueNot sure if this is the cause of the fringes
reported before, but at 5.6 keV there are
clear cracks visible on the XTD2 Attenuators
 2024-02-28-064435_203161010_exflqr51474.png2024-02-28-064443_551842636_exflqr51474.png2024-02-28-064454_671377179_exflqr51474.png2024-02-28-085524_727294913_exflqr51474.png 
  39   28 Feb 2024, 08:57 Peter ZaldenFXESA1 status5.61 keV setpoint in SA1 was confirmed
to correspond to 5.660 keV (+/- 0.003 keV),
see attached.
 2024-02-28-081608_626485769_exflqr51474.png 
  58   20 Mar 2024, 23:15 Peter ZaldenFXEShift summaryPreparation for user experiment transient
grating, Cris Svetina


Used 7.12 keV from ACC
  
  60   21 Mar 2024, 23:20 Peter ZaldenFXEShift summaryUser experiment transient grating, Cris
Svetina. (LTP)


Used 7.12 keV from ACC
  
  62   22 Mar 2024, 23:13 Peter ZaldenFXEShift summaryUser experiment transient grating, Cris
Svetina. (LTP)


Used 7.11 keV from
  
  63   23 Mar 2024, 23:12 Peter ZaldenFXEShift summaryUser experiment transient grating, Cris
Svetina. (LTP)


Used 7.11 keV from
  
  82   13 Apr 2024, 23:03 Peter ZaldenFXEShift summaryMeasurements to check the impact of bunch
compression on FXE mono transmission were
successful. We could change the peak current
  
  152   23 Aug 2024, 08:48 Peter ZaldenFXEShift summaryUsed 9.4 keV with 94 kHz wed and thu nights.
Received approx. 0.9 mJ with large fluctuations
in pulse energy, however acceptable for the
  
  159   08 Sep 2024, 20:30 Peter ZaldenFXEIssueWe observe a continuous horizontal beam
drift in SA1 after the M1 incident. It seems
not to converge, so one can wonder where
 2024-09-08-194936_755701995_exflqr51474.png 
  161   09 Sep 2024, 23:19 Peter ZaldenFXEIssueFinally, the drift velocity of the pointing
reduced approx a factor of 2 as compared
to yesterday, see attached. Possibly it will
 2024-09-09-231922_609331430_exflqr51474.png 
  166   14 Sep 2024, 01:33 Peter ZaldenFXEStatusFXE received the beam and did not change
accelerator settings.

Beam alignment to FXE was re-established
  
  172   21 Sep 2024, 09:50 Peter ZaldenFXESA1 statusThe xray beam drifted significantly on
wednesday and thursday (18. and 19.) but
then was not drifting on friday (20.), see
 2024-09-21-094858_073864177_exflqr51474.png 
  195   28 Oct 2024, 09:58 Peter ZaldenFXESA1 statusThis is to report some findings during
operation that should be looked into (mostly
to avoid in the future, because both negatively
 2024-10-28-095823_156722903_exflqr37199.png2024-10-28-100227_584317851_exflqr37199.pngScreenshot_2024-11-08_093316.png 
  6   01 Feb 2024, 07:14 Natalia GerasimovaSCSShift summaryMoning shift summary (31.01 and 01.02)

Acievements:
- SRA recalibrated, cross position
  
  120   08 Jun 2024, 15:21 Natalia GerasimovaSCSShift summary
Morning
shift on 08.06.2024 (Natalia, Teguh, Yi Ping)

Achievements:


Focus the KB to ca. 40
  
  2   28 Jan 2024, 19:55 Naresh KujalaXPDExperiment summaryX-ray delivery


0.25nC, 14 GeV, rep rate
2.25 MHz, 9300 eV, 1 to 100 pulses, ~2000
 Screenshot_from_2024-01-28_20-42-59.png 
  44   01 Mar 2024, 17:11 Naresh KujalaPRCStatus-Machine status

the cold compressor failure occurred
at ~16.30hr today. And it will take around
  
  191   07 Oct 2024, 15:15 Naresh KujalaPRCIssue14:40hr

FXE and HED reported the laser
synchronization issue. Informed to Machine
  
  192   07 Oct 2024, 16:34 Naresh KujalaPRCStatusDesy Laser group has fixed the issue about
the laser Synchronization.

https://ttfinfo.desy.de/XFELelog/show.jsp?dir=/2024/41/07.10_M&pos=2024-10-07T14:51:12
  
  32   24 Feb 2024, 11:58 Motoaki NakatsutsumiHEDShift summaryShift summary 2024-02-23 07:00 - 2024-02-24 10:00

We got self-seeding at 8.5 keV
very quickly after changeover from 10.5 keV
  
  34   25 Feb 2024, 14:47 Motoaki NakatsutsumiHEDShift summaryShift summary for 2024-02-24 from 07:00
to 2024-02-25 at 14:00:

Self-seeding at 8.5 keV, with approximately
  
  36   26 Feb 2024, 14:32 Motoaki NakatsutsumiHEDShift summaryShift summary for 2024-02-25 from
11:00 to 2024-02-25 at 14:00:

Self-seeding at 8.5 keV, with approximately
  
  47   05 Mar 2024, 07:41 Marcin SikorskiSPBShift summary
10 keV beam
Detector:
JUNGFRAU in the burst mode (16 memory cells)
Achievements:

multiple
sfx data sets (lysozyme) with 4 and 8 pulses
  
  76   08 Apr 2024, 06:37 Marcin SikorskiSPBShift endIn-house/commissioning beam time summary
night 5

X-ray delivery:
  
  9   02 Feb 2024, 12:40 Konopkova ZuzanaHEDShift summarybeam parametes: 8.5-9 kev, 1.2
mJ, 1-2 pulses


HED trajectory
  
  25   13 Feb 2024, 08:55 Konopkova ZuzanaHEDExperiment summary*Achievements :
- Generally rather successful with
very high quality beam parameters
  
  95   05 May 2024, 00:25 Konopkova ZuzanaHEDExperiment summary
proposal 5700 finished on 04.05.
The experiment used 352 pulses at
4.5 MHz and 18 keV to X-ray heat
  
  114   27 May 2024, 06:41 Konopkova ZuzanaHEDShift summarybeam parameters: 2 colors
at around 6.5 keV, 1 pulse

achievements: 
  
  80   10 Apr 2024, 17:03 Kelin TascaXROM3 calibration- M3 TX moved to 0 in steps of 1 mm and
beam on FXE Pop-In corrected with M3 RY (+)
and M2 RY
 SA1_M1_calibration.odsM3_at_nominal_2024-04-10_21-16-39.pngM3_calibrated_2024-04-10_21-20-34.png 
  127   18 Jun 2024, 13:03 Kelin TascaXROCompensation of M2 RY motor for the case of Piezo offWe plan to put the piezos of M2 off, in
the (unprobable) case that this is the reason
of the "jumps" in SASE3 trajectory.
 Screenshot_from_2024-06-18_13-16-14.pngScreenshot_from_2024-06-18_13-18-15.pngScreenshot_from_2024-06-18_13-20-06.png 
  11   03 Feb 2024, 23:51 Jörg HallmannMIDShift summarygoals achieved:
alignment of the beam in tunnel and
hutches including refinement of the beam
  
  13   05 Feb 2024, 23:10 Jörg HallmannMIDShift summarycheck of the optimized focussing options
at 10 keV using only one arm in CRL2 - results
still to be evaluated
  
  40   29 Feb 2024, 02:41 Jörg HallmannMIDShift summaryStable seeding with 1mJ + 400mJ SASE
HIREX triggered interlock when all
attenuators are removed 
  
  42   01 Mar 2024, 06:30 Jörg HallmannMIDShift summary
Shift
summary (Feb 29th):
Stable seeding with 1mJ + 400mJ SASE
  
  88   25 Apr 2024, 01:50 Jörg HallmannMIDShift summaryinstrument alignment including NaFos, DES
spectrometer, diamond detector, PUMA &
test samples
  
  90   27 Apr 2024, 02:11 Jörg HallmannMIDShift summary

optimized
the FEL energy on the absorption edge of
Iridium
measurements on the SDW
  
  125   13 Jun 2024, 01:46 Jörg HallmannMIDShift summaryalignment of the instrument including collimation
and beam shaping
test of the tempus detector using
  
  126   14 Jun 2024, 01:53 Jörg HallmannMIDShift summarycontinue with Tempus tests
continue with PAM commissioning (first
results of the working device at MID)
  
  139   08 Aug 2024, 00:18 Jörg HallmannMIDShift summaryoptimization of seeding (still not as good
as needed)

set position for the two color
  
  140   09 Aug 2024, 01:59 Jörg HallmannMIDShift summaryoptimized the SDL alignment

found timing of the upper (-520
ps) and lower branch (-514.5 ps) of the SDL
  
  141   10 Aug 2024, 01:17 Jörg HallmannMIDShift summaryFound the delay time from upper and lower
branches of SDL with a frosted-YAG.
The upper branch is -512.8 and the
  
  177   26 Sep 2024, 01:46 Jörg HallmannMIDShift summaryStarted the day with vacuum & detector
issues
real start of the experiments only
  
  179   27 Sep 2024, 01:51 Jörg HallmannMIDShift summarystarted initial alignment for the ptycho
experiment 
Continued with XPCS measurement using
  
  182   28 Sep 2024, 01:31 Jörg HallmannMIDShift summary


started
with data acquisition for the ptycho experiment
  
  183   28 Sep 2024, 23:42 Jörg HallmannMIDShift summarycontinued with the evaluation of the XPCS
analysis packages
investigated the effect of alignment
  
  189   30 Sep 2024, 01:50 Jörg HallmannMIDShift summary01:49
  
  215   05 Dec 2024, 00:06 Jörg HallmannMIDShift summary
machine
runs at 17 keV with about 1.2 mJ

  
  84   20 Apr 2024, 23:37 Juncheng ESPBShift summaryStaff: JK, SB, JE, AS, RW, FK

**X-ray delivery:**
- 21 keV, ~500 uJ
  
  92   01 May 2024, 23:31 Juncheng ESPBShift summaryX-ray delivery


9.3 keV, 3.3 mJ, 190 pulses/train


Optical
later delivery
  
  93   02 May 2024, 23:19 Juncheng ESPBShift summaryX-ray delivery


9.3 keV, 3.3 mJ, 190 pulses/train


Optical
later delivery
  
  94   03 May 2024, 23:31 Juncheng ESPBShift summaryX-ray delivery

- 9.3 keV, 3.1 mJ, 214 pulses/train
at 1.1 MHz and 132 at 0.5 MHz
  
  33   25 Feb 2024, 00:11 Johan BieleckiSPBShift summaryX-ray delivery
9.10 keV; 190 pulses per train @1.1
MHz with roughly 140-200 uJ; observed some
  
  1   28 Jan 2024, 13:50 Jan GruenertPRCIssueRC / BKR informs : Beam is down
(since 12h10), all beamlines affected

The reason is failure of a quadrupole
  
  83   18 Apr 2024, 19:31 Jan GruenertPRCStatusThe intra-bunchtrain feedback (IBFB) was
not active until today afternoon.
Although not strictly required or
  
  85   20 Apr 2024, 23:58 Jan GruenertPRCSA2 status20.4.2024 / 22h51:
DOC informed PRC that the SASE2 topic
broker had to be restarted.
  
  173   25 Sep 2024, 09:47 Jan GruenertPRCIssueIssue with SA3 Gas attenuator (SA3_XTD10_GATT)

9h06:
SQS informs PRC that the Argon line in GATT
is not reacting on pressure change commands,
 JG_2024-09-29_um_12.06.37.png 
  180   27 Sep 2024, 15:17 Jan GruenertPRCStatusBunch pattern SA1 / SA3

SQS
requests to change the bunch pattern.
Currently SA1/SA3 run interleaved
  
  185   29 Sep 2024, 11:42 Jan GruenertPRCIssueA2 failure - downtime

The machine
/ RC informs (11h22) that there is an issue
with the accelerator module A2 (first module
  
  186   29 Sep 2024, 12:13 Jan GruenertPRCStatusBeam is back. Current status:

SASE1 (SPB/SFX)


2.72
mJ, 352 bunches/train, 6 keV


SASE2 (MID)


880 uJ,
 JG_2024-09-29_um_12.12.28.png 
  201   23 Nov 2024, 00:36 Jan GruenertPRCIssue20h16: beam down in all beamlines due
to a gun problem
20h50: x-ray beams are back
 JG_2024-11-23_um_00.47.04.png 
  202   23 Nov 2024, 00:48 Jan GruenertPRCIssueBroken Bridges

Around 21h20 the
XPD group notices that several karabo-to-DOOCS
bridges are broken.
  
  204   23 Nov 2024, 10:23 Jan GruenertPRCIssueBroken Radiation Interlock

Beam
was down for all beamlines due to a broken
radiation interlock in the SPB/SFX experimental
 JG_2024-11-23_um_10.22.43.png 
  205   23 Nov 2024, 10:27 Jan GruenertPRCIssueSA1 Beckhoff issue

SA1 blocked
to max. 2 bunches and SA3 limited to max
29 bunches
 JG_2024-11-23_um_12.06.35.pngJG_2024-11-23_um_12.10.23.pngJG_2024-11-23_um_14.33.06.png 
  206   23 Nov 2024, 15:11 Jan GruenertPRCIssueDamage on YAG screen of SA1_XTD2_IMGFEL

A
damage spot was detected during the restart
of SA1 beam operation at 14h30.
 JG_2024-11-23_um_14.33.06.pngJG_2024-11-23_um_14.40.23.pngJG_2024-11-23_um_15.14.33.png 
  207   24 Nov 2024, 13:47 Jan GruenertPRCIssueBeckhoff communication loss SA1-EPS

12h19:
BKR informs PRC about a limitation to 30
bunches in total for the north branch.
  
  208   24 Nov 2024, 14:09 Jan GruenertPRCIssueBeckhoff communication loss SA1-EPS (again)

14h00
Same issue as before, but now EEE cannot
clear the problem anymore remotely.
 JG_2024-11-24_um_16.54.02.png 
  209   24 Nov 2024, 17:23 Jan GruenertPRCStatusStatus

All beamlines in operation.
The attachment ATT#1 shows the beam
delivery of this afternoon, with the pulse
 JG_2024-11-24_um_17.22.58.png 
  214   04 Dec 2024, 15:34 Jan GruenertPRCStatusBeam delivery Status well after tuning
finished (which went faster than anticipated).
 JG_2024-12-04_um_15.33.09.png 
  3   27 Jan 2024, 15:17 IdoiaXROShift summarySASE3
Open Issues:
- currently it is not possible to
  
  130   23 Jul 2024, 17:17 IdoiaXROShift summary

ZZ
access at XTD10


The
LE PM X and HE PM X motors were checked and
  
  50   15 Mar 2024, 00:07 Harald SinnPRCIssueSASE1 bunch number was reduced to 10 pulses
for no obvious reason. 

Traced it back to a malfunctioning
 watchdog_error.jpgcracks_in_SA.jpg 
  55   16 Mar 2024, 12:12 Harald SinnPRCIssue11:15 SASE1/SPB called that they observed
and issue with the SASE1 XGM/XTD2: about
every 35 seconds the power reading jumps
  
  77   10 Apr 2024, 11:55 Harald SinnPRCStatusYesterday two motors of the SASE2 seeding
mono were damaged. The mono was exchanged
in the afternoon and pumped down. Currently,
  
  131   24 Jul 2024, 10:26 Harald SinnPRCIssueIn SASE2 undualtor cell 10 has issues.
Suren K. will do a ZZ at 11:30 to fix it
(if possible). Estimated duration: 1-3 hours. 
  
  132   24 Jul 2024, 11:35 Harald SinnPRCIssueThe control rack of the soft mono at SASE3
has some failure. Leandro from EEE will enter
the XTD10 at 12:00. 
  
  134   27 Jul 2024, 09:10 Harald SinnPRCIssueSASE1: Solid attenuator att5 is in error.
When it is tried to move it out, the arm
lifts, but does not reach the final position
  
  14   06 Feb 2024, 07:17 Giuseppe MercurioSCSShift summary
  
  15   08 Feb 2024, 07:00 Giuseppe MercurioSCSShift summaryLate shift
07.02.24
Laurent, Martin
  
  17   09 Feb 2024, 07:15 Giuseppe MercurioSCSShift summary
night
shift summary

achievements:
  
  20   11 Feb 2024, 06:28 Giuseppe MercurioSCSShift summaryNight
shift summary
Andreas, Giuseppe
  
  23   13 Feb 2024, 06:38 Giuseppe MercurioSCSShift summaryshift
summary
Andreas, Giuseppe
  
  57   20 Mar 2024, 23:03 Giuseppe MercurioSCSShift summary
Late
shift summary


coarse timing
installed
laser shutter on the laser breadboard and
  
  118   07 Jun 2024, 15:19 Giuseppe MercurioSCSShift summary
Morning
Shift Summary for 07.06.2024 (Teguh, Natalia)

Achievements:


Aligned the beamline to
  
  122   09 Jun 2024, 22:21 Giuseppe MercurioSCSShift summaryLate Shift summary

Achievements:
- recovered the beam overlap
  
  133   24 Jul 2024, 15:22 Giuseppe MercurioSCSShift summary
Shift
summary (Natalia, Giuseppe)

Achievements:


M1, M2 pitches adjusted
Grating
  
  137   29 Jul 2024, 06:45 Giuseppe MercurioSCSShift summary## Shift summary night July 28th-29th

Achievements:
- we saw signal on both MCPs (with
  
  4   31 Jan 2024, 11:24 Frederik Wolff-FabrisPRCSA1 statusA ZZ is taking place today, 31.01 at
11:30, in XTD9 to verify and fix the M3 Pop-in
screen which is currently blocking the
  
  56   20 Mar 2024, 12:41 Frederik Wolff-FabrisPRCIssueBKR called PRC around 06:10AM to inform
on vacuum issues at SA1 beamline leading
to a lost beam permission for the North Branch.
  
  89   25 Apr 2024, 21:11 Frederik Wolff-FabrisPRCStatusV0 valve for SA2 closed as the pump P22090I
at HED branch enters in wrong state. This
closed nearby vacuum valves for HED branch and
 Screenshot_2024-04-25_211325.png 
  198   04 Nov 2024, 15:07 Frederik Wolff-FabrisXOSA2 statusDear MID colleagues, Svitozar (PRC), Bolko
and Shan (RCs),
This morning we faced the situation
  
  199   12 Nov 2024, 10:07 Frederik Wolff-FabrisPRCIssue
- While FEL IMG with YAG screen was
inserted in SA1, EPS/MPS was not limited
to the expected 2 bunches, but to 30
 Screenshot_2024-11-12_100032.png 
  200   15 Nov 2024, 10:50 Frederik Wolff-FabrisPRCIssueSA2 cell#5 undulator segment moved at ~09:45AM
Fri to 25mm without aparent reason and
undulator experts need a ZZ to exchange power
  
  107   17 May 2024, 10:42 Dirk RaiserSQSStatusLaser status:

After the laser issues listed in https://in.xfel.eu/elog/OPERATION-2024/99 the
  
  5   31 Jan 2024, 23:26 Chan KimSPBShift summary31.01.2024 (Day shift)

X-ray delivery


10 keV
1200
  
  49   13 Mar 2024, 23:41 Chan KimSPBShift summaryX-ray delivery


6 keV, 2.6 mJ/pulse, stable
delivery


Optical
  
  51   15 Mar 2024, 00:16 Chan KimSPBShift summaryX-ray delivery

6 keV, 2.4 mJ/pulse, stable delivery

Optical laser delivery
  
  54   15 Mar 2024, 23:43 Chan KimSPBShift summary**X-ray delivery**

- 6 keV, 3.2 mJ/pulse, stable delivery

**Optical laser delivery**
  
  64   28 Mar 2024, 14:54 Chan KimSPBShift summaryX-ray delivery


12.72 keV, 10 Hz, NOT stable
delivery, pointing drastically changed in
  
  65   28 Mar 2024, 14:56 Chan KimSPBIssuePulse energy fluctuation observed after
full train operation in SA2 starts.
 Screenshot-from-2024-03-28-14-26-18_1.png 
  66   29 Mar 2024, 22:38 Chan KimSPBShift summaryX-ray delivery
- 12.72 keV, 10Hz, ~1.4 mJ/pulse,
stable delivery 
  
  69   30 Mar 2024, 22:02 Chan KimSPBIssueContinuous pointing drift in horizontal
direction.

It may trigger a vacuum spike at
 Screenshot_from_2024-03-30_21-59-03.pngScreenshot_from_2024-03-30_21-09-11.png 
  70   30 Mar 2024, 22:50 Chan KimSPBShift summaryX-ray delivery

- 12.72 keV, 10Hz, ~1.4 mJ/pulse,
continuous beam drift in the horizontal direction
  
  119   07 Jun 2024, 23:12 Chan KimSPBShift summaryX-ray delivery
- 7.0 keV, up to 202 pulses at 564
kHz, 1.0 mJ.
  
  123   09 Jun 2024, 22:45 Chan KimSPBShift summaryX-ray delivery


7.0 keV, up to 202 pulses
at 564 kHz, 1.0 mJ.


Optical
  
  153   24 Aug 2024, 23:09 Chan KimSPBShift summaryX-ray delivery

-12.40
- 12.82 keV, XDT9 XGM ~0.81 mJ@ end of shift
  
  156   27 Aug 2024, 12:17 Chan KimSPBShift summaryX-ray delivery


12.78 keV, ~1.3 mJ


Optical
laser delivery
  
  175   25 Sep 2024, 16:53 Chan KimSPBIssue600um thick CVD diamond (XTD2 attenuator)
seems damaged

 
 Screenshot_from_2024-09-25_16-50-57.pngScreenshot_from_2024-09-25_16-51-21.png 
  176   25 Sep 2024, 23:36 Chan KimSPBShift summaryX-ray delivery


6 keV, ~2.8 mJ, stable
delivery


Optical
  
  178   26 Sep 2024, 23:12 Chan KimSPBShift summaryX-ray delivery


6 keV, ~2.7 mJ, stable
delivery


Optical
  
  181   27 Sep 2024, 23:13 Chan KimSPBShift summaryX-ray delivery


6 keV, ~3.0 mJ, stable
delivery


Optical
  
  184   29 Sep 2024, 00:07 Chan KimSPBShift summary**X-ray delivery**

- 6 keV, ~2.8 mJ, stable delivery

**Optical laser delivery**
  
  187   29 Sep 2024, 22:29 Chan KimSPBStability IssueX-ray beam is continuously drifting in
the vertical direction (XTD9_XGM)
It affects our NKB focus and focused
 Screenshot_from_2024-09-29_22-24-09_1.pngScreenshot_from_2024-09-29_22-24-00.png 
  188   30 Sep 2024, 01:13 Chan KimSPBShift summary**X-ray delivery**

- 6 keV, ~2.8 mJ, continuous beam
drift in vertical direction (both XTD2 &
  
  193   24 Oct 2024, 06:51 Chan KimSPBShift summaryX-ray
delivery

12.4 keV, ~1.4 mJ

Achievements/Observations
  
  194   25 Oct 2024, 05:51 Chan KimSPBShift summaryX-ray delivery

12.4 keV, ~1.4 mJ

 
  
  68   30 Mar 2024, 00:17 Björn Senfftleben (Resolved) Issues with DAQWe had some trouble with the DAQ. It was
not able to start runs properly.

We got the following error messages:
  
  79   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- beam is centered on FEL imager

- pblm in XTD9 is inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  78   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- found solid attenuator 0.5mm
silicon inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  81   11 Apr 2024, 21:54 Antje TrappXROSASE1 MIRROR MOTORS CALIBRATEDDear all,

we calibrated the mirror vertical
motors to their geometrically neutral.
 XRO_optics-setpoints_2024-04-11_22-05-08.png 
  108   19 May 2024, 14:49 Antje TrappXROM1 - M2 - M3 euler fine tuning geometriy parametersWe fine tuned geometry parameters for linear
effects on X motion (parallel offset) for
all three mirrors.
 Screenshot_from_2024-05-19_15-18-51.png 
  109   19 May 2024, 15:20 Antje TrappXROHED 6keV after Euler MDL   Screenshot_from_2024-05-19_15-18-51.png 
  129   22 Jul 2024, 15:20 Antje TrappXROSASE2 end of shift summaryBeam is now aligned back to HED for hand-over
to Naresh (see picture)

points achieved:
 HED_beam__2024-07-22_15-19-15.png 
  128   22 Jul 2024, 15:27 Antje TrappXROSASE3 end of shift summarythis morning, ZZ was done together with
Sylvia Huynh (EEE) to solve softmono pre-mirror
motor issue https://redmine.xfel.eu/issues/177392
  
  157   30 Aug 2024, 13:02 Antje TrappXROM1 Rz damaged - DO NOT MOVE!!!What has happened:
During euler motion calibration of
M1, we were driving the vertical motors by
 6x 
  105   14 May 2024, 09:56 Andreas KochXPDIssueEPS issue for Transmissive imager
SA1 (OTRC.2615.T9) w.r.t Operation eLog #96

The motor screen positions w.r.t.
  
  210   26 Nov 2024, 09:47 Andreas KochXPDSA1 statusConcerning
damage of the SA1 FEL imager, Operation-2024
eLog #206
 SA1_FEL_imager_-_damaged_spot_at_YAG_-_original_screen_position.pngSA1_FEL_imager_-_damaged_spot_at_YAG_-_new_screen_position.png 
  91   01 May 2024, 16:39 Andreas GallerPRCIssue840 pulses not possible at SXP due to big
brother settings for the EPS Power Limit
rule. The minimum pulse energy was assumed
 Screenshot_2024-05-01_at_16.33.13.png 
  143   11 Aug 2024, 00:13 Andreas GallerPRCAttentionEPS Interlock change for Mode30:
the 3 HIREX Interlock conditions had
been disabled
 Screenshot_2024-08-11_at_00.12.04.png 
  71   31 Mar 2024, 23:20 Adam RoundSPBShift endX-ray delivery


12.72 keV, 10Hz, ~1.4 mJ/pulse,
some beam drift in the horizontal direction
  
  163   12 Sep 2024, 23:48 Adam RoundSPBShift endX-ray delivery

8.951
keV, 1.6 mJ
  
  165   13 Sep 2024, 23:17 Adam RoundSPBShift endOn Shift: TS,
FT, CK, AR, PS

X-ray
  
  121   08 Jun 2024, 23:20 Abhisakh SarmaSPBShift summaryX-ray delivery
- 7.0 keV, up to 202 pulses at 564
kHz, 1.0 mJ.
  
  124   11 Jun 2024, 00:43 Abhisakh SarmaSPBShift summary**X-ray delivery**


7.0 keV, up to 202 pulses
at 564 kHz, 1.0 mJ.


**Optical
  
ELOG V3.1.4-7c3fd00