Group Selection Page HELP Controls Group ITDM Vacuum WP78 FXE SPB HED SQS SXP Sample Environment PSPO XO TS Migrated2Zulip Archived2GitlabPages Archived2PDF MigratedByGroup
SCS Photon Commissioning Team XRO DOC WP74 MID XO_mig XO_Operation SQS Migrated2Zulip DET
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 80     Entry time: 10 Apr 2024, 17:03
Author: Kelin Tasca 
Group: XRO 
Subject: M3 calibration 

- M3 TX moved to 0 in steps of 1 mm and beam on FXE Pop-In corrected with M3 RY (+) and M2 RY

- Started calibration with M3 Rz in steps of 0.5 (+) and corrected with M2 RY and RZ to find a position with a minimum of parasitic motion

- Iterations with M3 TY

- CRL 3 and 4 were inserted (using find target)

- The backlash correction was disabled

- Curve for M3 Rz position with Ry correction done. M2 RY/RZ corrections to move beam up and down to have it on the screen

- Curve for M3 Ty position with Ry correction done.

- Curve for M3 Rx position with Ry correction done

M3 vertical motors calibrated to 0

 

Attachment 1: SA1_M1_calibration.ods  26 kB  Uploaded 10 Apr 2024, 22:16
Attachment 2: M3_at_nominal_2024-04-10_21-16-39.png  157 kB  Uploaded 10 Apr 2024, 22:20  | Hide | Hide all
M3_at_nominal_2024-04-10_21-16-39.png
Attachment 3: M3_calibrated_2024-04-10_21-20-34.png  152 kB  Uploaded 10 Apr 2024, 22:21  | Hide | Hide all
M3_calibrated_2024-04-10_21-20-34.png
ELOG V3.1.4-7c3fd00