Message ID: 141     Entry time: 10 Aug 2024, 01:17
Author: Jörg Hallmann 
Group: MID 
Subject: Shift summary 

Found the delay time from upper and lower branches of SDL with a frosted-YAG.
The upper branch is -512.8 and the lower branch is -513.28.
The delay time difference is about 500 fs. 
The Mid SDL delay tuner should be investigated further more. 
The next step is find the spatial overlap on the Suna microscope and measure the fringes. 
 