  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 133     Entry time: 24 Jul 2024, 15:22
Author: Giuseppe Mercurio 
Group: SCS 
Subject: Shift summary 

Shift summary (Natalia, Giuseppe)

Achievements:

  • M1, M2 pitches adjusted
  • Grating AX changed value during shutdown, encoder offsets have been recalibrated
  • Set up SCS, 9mrad, HEPM, grating configuration
  • Set up SCS, 9 mrad, HEPM, blank configuration

Problems:

  • at 10am the mono translations gone in error. It was problem with fuse in ELMO crate in tunnel. Repaired (ZZ). Machine was log to set up, till end of shift, we lost ~5 hours from the shift.