  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 140     Entry time: 09 Aug 2024, 01:59
Author: Jörg Hallmann 
Group: MID 
Subject: Shift summary 

optimized the SDL alignment

found timing of the upper (-520 ps) and lower branch (-514.5 ps) of the SDL

moved the upper branch by 3 ps (positive) and lost the beam on the merger crystal - difficult to get it back