Late shift 07.02.24
Laurent, Martin
Continued with laser preparation
- optimized SHG
- changed lens to f = 600 mm
- knife edge scans
- found optimum lens position (95 mm) for w0 = 70 um
- fluence characterization --> up to more than 2 J /cm^2
- Coarse timing
- Fine timing
night shift summary 07.02.24
Andreas, Giuseppe
program was to determine horizontal an vertical beam size and then create some single laser shot patterns to determine fluence settings for LIPSS.
PROBLEMS:
- knife edge insensitive to beam sizes smaller than 20um due the large beam jitter of the FEL.
- moved to the camera and curved gratings but then encountered vacuum issue with scroll pump down since noon 07.02. fixed by replacing scroll pump.
- useful camera data could not extracted as we cannot control the TPI shutter and have multiple exposures of the camera. STPulser Macro need to be fixed.
- SCS_XTD10_TPI/DCTRL/SHUTTER in the SCS topic is not found after shutting device down when tracking down device issues.
|