Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 79     Entry time: 10 Apr 2024, 16:35
Author: Antje Trapp 
Group: XRO 
Subject: start of shift - status 

Starting shift with mirror motor calibration:

- beam is centered on FEL imager

- pblm in XTD9 is inserted

We removed both silicon solid attenuator and pblm

Attachment 1: Init_2024-04-10_16-34-30.png  2.788 MB  Uploaded 10 Apr 2024, 17:53  | Hide | Hide all
Init_2024-04-10_16-34-30.png
Attachment 2: status_2024-04-10_16-46-01.png  235 kB  Uploaded 10 Apr 2024, 17:53  | Hide | Hide all
status_2024-04-10_16-46-01.png
Attachment 3: FEL_imag_2024-04-10_16-40-29.png  365 kB  Uploaded 10 Apr 2024, 17:53  | Hide | Hide all
FEL_imag_2024-04-10_16-40-29.png
Attachment 4: pblm_2024-04-10_16-52-34.png  152 kB  Uploaded 10 Apr 2024, 17:54  | Hide | Hide all
pblm_2024-04-10_16-52-34.png
ELOG V3.1.4-7c3fd00