Message ID: 29     Entry time: 22 Feb 2024, 06:13
Author: Peter Zalden 
Group: FXE 
Subject: Shift summary 

Beam conditions:

  • Used photon energies between 6 and 7 keV, including short undulator scans
  • Continuously got 1 mJ despite the short pulse mode that's running
  • Bandwidth was found to be 18 eV FWHM at 6.07 keV (0.3%) by monochromator scan against fixed undulator setpoint

Achievements:

  • Cr foil scan for energy calibration of the FXE mono
  • Prepared setpoints for XAS scans during next week's user expts. at: Ce L3 (5.72 keV), Ce L2 (6.16 keV) and Mn K (6.54 keV)
  • IPM calibration against XGMD

Issues:

  • ATT MDL (class JJAttenuator) got stuck in INIT state and then did not show that absorber was inserted in the beam path (ticket to be submitted to Ctrls)
  • DA3 of FXE DAQ (FXE_DAQ_DATA/DA/3) got stuck in changing state (it got too many parameters inserted). The restart by shutting down the server and waiting for the device to come back up took around 20 mins, see 22.2.2024, 4:24 am to 4:43 am.