Message ID: 185     Entry time: 29 Sep 2024, 11:42
Author: Jan Gruenert 
Group: PRC 
Subject: Issue 

A2 failure - downtime

The machine / RC informs (11h22) that there is an issue with the accelerator module A2 (first module in L1, right after the injector).
This causes a downtime of the accelerator of 1 hour (from 10h51 to 11h51), affecting all photon beamlines.