  106   14 May 2024, 11:49 Romain LetrunSPBShift summaryX-ray delivery


11.56 keV, 1-197 pulses
@ 564 kHz, 2.6 mJ.


Optical
  
  105   14 May 2024, 09:56 Andreas KochXPDIssueEPS issue for Transmissive imager
SA1 (OTRC.2615.T9) w.r.t Operation eLog #96

The motor screen positions w.r.t.
  
  104   13 May 2024, 10:36 Romain LetrunSPBShift summaryX-ray
delivery


11.56
  
  103   13 May 2024, 08:48 Ulrike BoesenbergMIDShift summaryWeekend summary:

Overall stable beam delivery with
300bunches @18keV and 750uJ
  
  102   12 May 2024, 07:35 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  101   11 May 2024, 07:20 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  100   10 May 2024, 07:06 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  99   10 May 2024, 00:04 Rebecca BollSQSIssueour pp laser experienced timing jumps by
18 ns today. this happened for the first
time at ~7:30 in the morning without us noticing
  
  98   09 May 2024, 10:45 Tommaso MazzaSQSotherwe needed SASE1 to be set to 0 pulses briefly
to check alignment in our experiment.

The FXE control hutch was empty.
  
  97   09 May 2024, 07:14 Romain LetrunSPBShift summaryX-ray
delivery


11.56 keV, 1-352 pulses
  
  96   08 May 2024, 13:51 Raúl Villanueva-GuerreroPRCIssueDear all,

Due to a probable issue at the
SA1 Transmissive imager, the "OUT"
 image_2024-05-08_135756593.pngimage_2024-05-08_140027070.pngimage_2024-05-08_140101131.pngimage_2024-05-08_140228955.png 
  95   05 May 2024, 00:25 Konopkova ZuzanaHEDExperiment summary
proposal 5700 finished on 04.05.
The experiment used 352 pulses at
4.5 MHz and 18 keV to X-ray heat
  
  94   03 May 2024, 23:31 Juncheng ESPBShift summaryX-ray delivery

- 9.3 keV, 3.1 mJ, 214 pulses/train
at 1.1 MHz and 132 at 0.5 MHz
  
  93   02 May 2024, 23:19 Juncheng ESPBShift summaryX-ray delivery


9.3 keV, 3.3 mJ, 190 pulses/train


Optical
later delivery
  
  92   01 May 2024, 23:31 Juncheng ESPBShift summaryX-ray delivery


9.3 keV, 3.3 mJ, 190 pulses/train


Optical
later delivery
  
  91   01 May 2024, 16:39 Andreas GallerPRCIssue840 pulses not possible at SXP due to big
brother settings for the EPS Power Limit
rule. The minimum pulse energy was assumed
 Screenshot_2024-05-01_at_16.33.13.png 
  90   27 Apr 2024, 02:11 Jörg HallmannMIDShift summary

optimized
the FEL energy on the absorption edge of
Iridium
measurements on the SDW
  
  89   25 Apr 2024, 21:11 Frederik Wolff-FabrisPRCStatusV0 valve for SA2 closed as the pump P22090I
at HED branch enters in wrong state. This
closed nearby vacuum valves for HED branch and
 Screenshot_2024-04-25_211325.png 
  88   25 Apr 2024, 01:50 Jörg HallmannMIDShift summaryinstrument alignment including NaFos, DES
spectrometer, diamond detector, PUMA &
test samples
  
  87   22 Apr 2024, 23:26 Raphael de WijnSPBShift summaryEnd of User beamtime 5157


X-ray
delivery:
  
  86   22 Apr 2024, 00:06 Raphael de WijnSPBShift summary
User
beamtime 5157 day 5

X-ray delivery:
  
  85   20 Apr 2024, 23:58 Jan GruenertPRCSA2 status20.4.2024 / 22h51:
DOC informed PRC that the SASE2 topic
broker had to be restarted.
  
  84   20 Apr 2024, 23:37 Juncheng ESPBShift summaryStaff: JK, SB, JE, AS, RW, FK

**X-ray delivery:**
- 21 keV, ~500 uJ
  
  83   18 Apr 2024, 19:31 Jan GruenertPRCStatusThe intra-bunchtrain feedback (IBFB) was
not active until today afternoon.
Although not strictly required or
  
  82   13 Apr 2024, 23:03 Peter ZaldenFXEShift summaryMeasurements to check the impact of bunch
compression on FXE mono transmission were
successful. We could change the peak current
  
  81   11 Apr 2024, 21:54 Antje TrappXROSASE1 MIRROR MOTORS CALIBRATEDDear all,

we calibrated the mirror vertical
motors to their geometrically neutral.
 XRO_optics-setpoints_2024-04-11_22-05-08.png 
  80   10 Apr 2024, 17:03 Kelin TascaXROM3 calibration- M3 TX moved to 0 in steps of 1 mm and
beam on FXE Pop-In corrected with M3 RY (+)
and M2 RY
 SA1_M1_calibration.odsM3_at_nominal_2024-04-10_21-16-39.pngM3_calibrated_2024-04-10_21-20-34.png 
  79   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- beam is centered on FEL imager

- pblm in XTD9 is inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  78   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- found solid attenuator 0.5mm
silicon inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  77   10 Apr 2024, 11:55 Harald SinnPRCStatusYesterday two motors of the SASE2 seeding
mono were damaged. The mono was exchanged
in the afternoon and pumped down. Currently,
  
  76   08 Apr 2024, 06:37 Marcin SikorskiSPBShift endIn-house/commissioning beam time summary
night 5

X-ray delivery:
  
  75   07 Apr 2024, 07:04 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 4

X-ray delivery:
  
  74   06 Apr 2024, 07:06 Raphael de WijnSPBShift summaryStaff: MS, RB, PS, RdW

In-house/commissioning beam time
summary night 3
  
  73   05 Apr 2024, 07:14 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 2

X-ray delivery:
  
  72   04 Apr 2024, 06:48 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 1

X-ray delivery:
  
  71   31 Mar 2024, 23:20 Adam RoundSPBShift endX-ray delivery


12.72 keV, 10Hz, ~1.4 mJ/pulse,
some beam drift in the horizontal direction
  
  70   30 Mar 2024, 22:50 Chan KimSPBShift summaryX-ray delivery

- 12.72 keV, 10Hz, ~1.4 mJ/pulse,
continuous beam drift in the horizontal direction
  
  69   30 Mar 2024, 22:02 Chan KimSPBIssueContinuous pointing drift in horizontal
direction.

It may trigger a vacuum spike at
 Screenshot_from_2024-03-30_21-59-03.pngScreenshot_from_2024-03-30_21-09-11.png 
  67   30 Mar 2024, 06:59 Romain LetrunSPBIssueDOOCS panels are again incorrectly reporting
the FXE shutter as opened when it is in fact
closed. This had been fixed after it was
 Screenshot_from_2024-03-30_06-58-42.png 
  68   30 Mar 2024, 00:17 Björn Senfftleben (Resolved) Issues with DAQWe had some trouble with the DAQ. It was
not able to start runs properly.

We got the following error messages:
  
  66   29 Mar 2024, 22:38 Chan KimSPBShift summaryX-ray delivery
- 12.72 keV, 10Hz, ~1.4 mJ/pulse,
stable delivery 
  
  65   28 Mar 2024, 14:56 Chan KimSPBIssuePulse energy fluctuation observed after
full train operation in SA2 starts.
 Screenshot-from-2024-03-28-14-26-18_1.png 
  64   28 Mar 2024, 14:54 Chan KimSPBShift summaryX-ray delivery


12.72 keV, 10 Hz, NOT stable
delivery, pointing drastically changed in
  
  63   23 Mar 2024, 23:12 Peter ZaldenFXEShift summaryUser experiment transient grating, Cris
Svetina. (LTP)


Used 7.11 keV from
  
  62   22 Mar 2024, 23:13 Peter ZaldenFXEShift summaryUser experiment transient grating, Cris
Svetina. (LTP)


Used 7.11 keV from
  
  61   22 Mar 2024, 06:35 Raphael de WijnSPBShift summaryX-ray delivery
- 9.3 keV, >3 mJ/pulse, beam down
around 30min
  
  60   21 Mar 2024, 23:20 Peter ZaldenFXEShift summaryUser experiment transient grating, Cris
Svetina. (LTP)


Used 7.12 keV from ACC
  
  59   21 Mar 2024, 06:33 Raphael de WijnSPBShift summaryX-ray delivery
- 9.3 keV, >3 mJ/pulse, stable
delivery 
  
  58   20 Mar 2024, 23:15 Peter ZaldenFXEShift summaryPreparation for user experiment transient
grating, Cris Svetina


Used 7.12 keV from ACC
  
  57   20 Mar 2024, 23:03 Giuseppe MercurioSCSShift summary
Late
shift summary


coarse timing
installed
laser shutter on the laser breadboard and
  
  56   20 Mar 2024, 12:41 Frederik Wolff-FabrisPRCIssueBKR called PRC around 06:10AM to inform
on vacuum issues at SA1 beamline leading
to a lost beam permission for the North Branch.
  
  55   16 Mar 2024, 12:12 Harald SinnPRCIssue11:15 SASE1/SPB called that they observed
and issue with the SASE1 XGM/XTD2: about
every 35 seconds the power reading jumps
  
  54   15 Mar 2024, 23:43 Chan KimSPBShift summary**X-ray delivery**

- 6 keV, 3.2 mJ/pulse, stable delivery

**Optical laser delivery**
  
  53   15 Mar 2024, 18:02 Tommaso MazzaSQSStability Issueit is not clear why, but the beam position
on BIU2 has changed over time, even more
since we checked last. it is off in both
 Screenshot_from_2024-03-15_18-04-59.pngScreenshot_from_2024-03-15_18-04-39.png 
  52   15 Mar 2024, 07:08 Romain LetrunSPBIssueThere are now two watchdogs for the XTD2
attenuator running at the same time


SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020
SA1_XTD2_OPTICS_PROTECTION/MDL/ATT1


that
 Screenshot_from_2024-03-15_07-07-40.png 
  51   15 Mar 2024, 00:16 Chan KimSPBShift summaryX-ray delivery

6 keV, 2.4 mJ/pulse, stable delivery

Optical laser delivery
  
  50   15 Mar 2024, 00:07 Harald SinnPRCIssueSASE1 bunch number was reduced to 10 pulses
for no obvious reason. 

Traced it back to a malfunctioning
 watchdog_error.jpgcracks_in_SA.jpg 
  49   13 Mar 2024, 23:41 Chan KimSPBShift summaryX-ray delivery


6 keV, 2.6 mJ/pulse, stable
delivery


Optical
  
  48   13 Mar 2024, 10:09 Romain LetrunSPBStatusWe checked the XTD2 attenuators following
the intervention from XRO (compar ewith elog:37, before the intervention).
 7x 
  47   05 Mar 2024, 07:41 Marcin SikorskiSPBShift summary
10 keV beam
Detector:
JUNGFRAU in the burst mode (16 memory cells)
Achievements:

multiple
sfx data sets (lysozyme) with 4 and 8 pulses
  
  46   04 Mar 2024, 09:42 Romain LetrunSPBIssueThe number of bunches during the last night
shift kept being changed down to 24 by the
device SA1_XTD2_WATCHDOG/MDL/ATT1_MONITOR020
 xtd2_att_watchdog.png 
  45   04 Mar 2024, 06:52 Raphael de WijnSPBShift summary
X-ray
delivery


10 keV, up to 128 pulses
  
  44   01 Mar 2024, 17:11 Naresh KujalaPRCStatus-Machine status

the cold compressor failure occurred
at ~16.30hr today. And it will take around
  
  43   01 Mar 2024, 10:54 Romain LetrunSPBShift summaryX-ray delivery


10 keV, up to 128 pulses
with custom bunch pattern, 1.6-2.0 mJ


Optical
  
  42   01 Mar 2024, 06:30 Jörg HallmannMIDShift summary
Shift
summary (Feb 29th):
Stable seeding with 1mJ + 400mJ SASE
  
  41   29 Feb 2024, 10:04 Romain LetrunSPBShift summaryX-ray
delivery


10
  
  40   29 Feb 2024, 02:41 Jörg HallmannMIDShift summaryStable seeding with 1mJ + 400mJ SASE
HIREX triggered interlock when all
attenuators are removed 
  
  39   28 Feb 2024, 08:57 Peter ZaldenFXESA1 status5.61 keV setpoint in SA1 was confirmed
to correspond to 5.660 keV (+/- 0.003 keV),
see attached.
 2024-02-28-081608_626485769_exflqr51474.png 
  38   28 Feb 2024, 06:57 Peter ZaldenFXEIssueNot sure if this is the cause of the fringes
reported before, but at 5.6 keV there are
clear cracks visible on the XTD2 Attenuators
 2024-02-28-064435_203161010_exflqr51474.png2024-02-28-064443_551842636_exflqr51474.png2024-02-28-064454_671377179_exflqr51474.png2024-02-28-085524_727294913_exflqr51474.png 
  37   27 Feb 2024, 09:56 Romain LetrunSPBIssueThe status of the XTD2 attenuators has
been checked during the experiment last week
and many were found to cause disturbances
 8x 
  36   26 Feb 2024, 14:32 Motoaki NakatsutsumiHEDShift summaryShift summary for 2024-02-25 from
11:00 to 2024-02-25 at 14:00:

Self-seeding at 8.5 keV, with approximately
  
  35   25 Feb 2024, 22:54 Tokushi SatoSPBShift summaryX-ray delivery


9.10 keV; 190 pulses per
train @1.1 MHz with roughly 170-200 uJ; stable
  
  34   25 Feb 2024, 14:47 Motoaki NakatsutsumiHEDShift summaryShift summary for 2024-02-24 from 07:00
to 2024-02-25 at 14:00:

Self-seeding at 8.5 keV, with approximately
  
  33   25 Feb 2024, 00:11 Johan BieleckiSPBShift summaryX-ray delivery
9.10 keV; 190 pulses per train @1.1
MHz with roughly 140-200 uJ; observed some
  
  32   24 Feb 2024, 11:58 Motoaki NakatsutsumiHEDShift summaryShift summary 2024-02-23 07:00 - 2024-02-24 10:00

We got self-seeding at 8.5 keV
very quickly after changeover from 10.5 keV
  
  31   23 Feb 2024, 23:03 Tokushi SatoSPBShift summaryX-ray delivery:

stable and flat over 190 pulses
per train. 1.1 MHz with ~200 uJ
  
  30   22 Feb 2024, 22:52 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 190
pulses per train. 1.1 MHz with 200 uJ short
intervention needed to improve intensity
  
  29   22 Feb 2024, 06:13 Peter ZaldenFXEShift summaryBeam conditions:


Used photon energies between
6 and 7 keV, including short undulator scans
Continuously
  
  28   21 Feb 2024, 23:00 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 250
pulses per train. 1.1 MHz with 400 uJ

Optical laser delivery: NA
  
  27   17 Feb 2024, 08:15 Tommaso MazzaSQSIssueThe cross on the FEL imager, which we use
as a reference for BKR crew, is not centred
on the GATT aperture. when was this changed,
 Screenshot_from_2024-02-17_08-12-43.pngScreenshot_from_2024-02-17_08-17-03.pngScreenshot_from_2024-02-03_16-06-39.png 
  26   15 Feb 2024, 09:32 Romain LetrunSPBShift summaryX-ray delivery


1 to ~332 pulses at 6 keV,
4.5 mJ
Stable delivery
Number
  
  25   13 Feb 2024, 08:55 Konopkova ZuzanaHEDExperiment summary*Achievements :
- Generally rather successful with
very high quality beam parameters
  
  24   13 Feb 2024, 08:52 Romain LetrunSPBIssueLike after the previous winter maintenance
period, the shutter of FXE appears as opened
in DOOCS panels even though it is closed
 Screenshot_from_2024-02-13_08-51-02.png 
  23   13 Feb 2024, 06:38 Giuseppe MercurioSCSShift summaryshift
summary
Andreas, Giuseppe
  
  22   13 Feb 2024, 01:02 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1600
uJ. Stable delivery


Optical
  
  21   11 Feb 2024, 23:04 Tokushi SatoSPBShift summaryX-ray delivery
1-350 at 12.45 keV, 1700 uJ. Stable
delivery
  
  20   11 Feb 2024, 06:28 Giuseppe MercurioSCSShift summaryNight
shift summary
Andreas, Giuseppe
  
  19   10 Feb 2024, 23:32 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1750
uJ. Stable delivery


Optical
  
  18   10 Feb 2024, 00:12 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1700
uJ. Stable delivery


Optical
  
  17   09 Feb 2024, 07:15 Giuseppe MercurioSCSShift summary
night
shift summary

achievements:
  
  16   08 Feb 2024, 23:14 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1700
uJ. Stable delivery


Optical
  
  15   08 Feb 2024, 07:00 Giuseppe MercurioSCSShift summaryLate shift
07.02.24
Laurent, Martin
  
  14   06 Feb 2024, 07:17 Giuseppe MercurioSCSShift summary
  
  13   05 Feb 2024, 23:10 Jörg HallmannMIDShift summarycheck of the optimized focussing options
at 10 keV using only one arm in CRL2 - results
still to be evaluated
  
  12   04 Feb 2024, 23:36 Wonhyuk JoMIDShift summaryGoal Achieved.
- Finished flat field measurement
for AGIPD at different scenarios for upcoming
  
  11   03 Feb 2024, 23:51 Jörg HallmannMIDShift summarygoals achieved:
alignment of the beam in tunnel and
hutches including refinement of the beam
  
  10   02 Feb 2024, 23:31 Romain LetrunSPBShift summaryX-ray delivery


1-64 pulses at 10 keV,
~1.1 mJ.
Overall stable delivery.


Optical
  
  9   02 Feb 2024, 12:40 Konopkova ZuzanaHEDShift summarybeam parametes: 8.5-9 kev, 1.2
mJ, 1-2 pulses


HED trajectory
  
  8   02 Feb 2024, 00:04 Romain LetrunSPBShift summaryX-ray delivery


1-352 pulses at 10 keV,
1200 - 400 uJ.
Significant pulse
  
  7   01 Feb 2024, 21:56 Romain LetrunSPBIssueAt 21:29:20 today, the number of bunches
in SASE1 was increased from 1 to 352 without
intervention of the SPB/SFX shift crew. 30
 Screenshot_from_2024-02-01_21-52-15.pngScreenshot_from_2024-02-01_21-31-53.png 
  6   01 Feb 2024, 07:14 Natalia GerasimovaSCSShift summaryMoning shift summary (31.01 and 01.02)

Acievements:
- SRA recalibrated, cross position
  
  5   31 Jan 2024, 23:26 Chan KimSPBShift summary31.01.2024 (Day shift)

X-ray delivery


10 keV
1200
  
  4   31 Jan 2024, 11:24 Frederik Wolff-FabrisPRCSA1 statusA ZZ is taking place today, 31.01 at
11:30, in XTD9 to verify and fix the M3 Pop-in
screen which is currently blocking the
  
  2   28 Jan 2024, 19:55 Naresh KujalaXPDExperiment summaryX-ray delivery


0.25nC, 14 GeV, rep rate
2.25 MHz, 9300 eV, 1 to 100 pulses, ~2000
 Screenshot_from_2024-01-28_20-42-59.png 
  1   28 Jan 2024, 13:50 Jan GruenertPRCIssueRC / BKR informs : Beam is down
(since 12h10), all beamlines affected

The reason is failure of a quadrupole
  
  3   27 Jan 2024, 15:17 IdoiaXROShift summarySASE3
Open Issues:
- currently it is not possible to
  