Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 26 of 32  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Notes XO Integration Meeting 05.06.2020, posted by Frederik Wolff-Fabris on 05 Jun 2020, 13:44 
General Announcement:
- Many summer shutdown tasks have been scheduled already and information has been sent to the groups with tunnel tasks.
- XO will not fully engage with tasks in the instrument Hall carried by the Instruments. Please contact XO if there are difficulties in organizing these
Entry   Notes XO Integration Meeting 03.06.2020, posted by Frederik Wolff-Fabris on 04 Jun 2020, 13:31 
General Announcement:
- Summer shutdown is nearing. Few dates on crane maintenance at XHEXP1 were sent to the readiness mailing list. Please be aware on the dates when planning
activities. 
Entry   Notes XO Integration Meeting 29.05.2020, posted by Frederik Wolff-Fabris on 29 May 2020, 14:22 
General Announcement:
- Due to the public holiday this meeting do not take place on Monday.
- Safety related questions: 
Entry   Notes XO Integration Meeting 27.05.2020, posted by Frederik Wolff-Fabris on 28 May 2020, 13:58 
General Announcement:
- It seems EuXFEL was not affected due to the power glitch at the Desy site last Tuesday (no device was found in off state or damaged). 
- TS informed no indications of power failure at EuXFEL. Groups are encouraged to inform XO if they find components that have been affected. 
Entry   Notes XO Integration Meeting 25.05.2020, posted by Frederik Wolff-Fabris on 25 May 2020, 15:29 
General Announcement:
- Machine started SA2 lasing last weekend. Currently photon energy is 0.5mJ at 9keV.
- CTRL OCD was called Friday on the SR slits position and movement. It was quickly solved.
Entry   Notes XO Integration Meeting 20.05.2020, posted by Frederik Wolff-Fabris on 22 May 2020, 08:57 
General Announcement:
- XO Integration Meeting will not take place next Friday 22.05 due to the bridge holiday.
- MPS group shared some info on the SA1 emergency power off event that happened last week. Further investigations are ongoing. 
Entry   Notes XO Integration Meeting 18.05.2020, posted by Frederik Wolff-Fabris on 18 May 2020, 14:53 
General Announcement:
- Starting today 18.05 the XTD1 tunnel will be closed. It is not accessible until the summer shutdown. All other tunnels remain open.
- XO and PMO have sent a communication for updating the task list. Please indicate if tasks were already carried out. Deadline for submitting it back is
Entry   Notes XO Integration Meeting 15.05.2020, posted by Frederik Wolff-Fabris on 15 May 2020, 14:35 
General Announcement:
- Judging by feedback and communication to XO both Tunnel and control network works are progressing.
- Friday is a good opportunity to discuss the Karabo tasks to be submitted next week as well as direct questions to SRP.
Entry   Notes XO Integration Meeting 13.05.2020, posted by Frederik Wolff-Fabris on 13 May 2020, 13:51 
General Announcement:
- SRP will join this meeting series. If you have questions please raise the points.
- DET has questions on the policy in how to proceed with team work (how close and what is the interaction that different teams can have, e.g. when working
Entry   Notes XO Integration Meeting 11.05.2020, posted by Frederik Wolff-Fabris on 11 May 2020, 14:53 
General Announcement:
- The proposed works on the Control network are fully organized for this week;
- Safety: The EuXFEL task force for the Covid-19 discussed this morning the safety issues here presented last Friday. 
Entry   Notes XO Integration Meeting 08.05.2020, posted by Frederik Wolff-Fabris on 08 May 2020, 16:44 
General Announcement:

- Q&A session with SRP/Tobias Haas:
Entry   Notes XO Integration Meeting 06.05.2020, posted by Frederik Wolff-Fabris on 06 May 2020, 14:45 
General Announcement:
- SRP is invited and urged to participate in this series of meetings.
- Several groups have questions to the SRP regarding: 
Entry   Notes XO Integration Meeting 04.05.2020, posted by Frederik Wolff-Fabris on 04 May 2020, 14:20 
General Announcement:
- From today on there is no general restrictions in accessing the EuXFEL site: only consent of group leader is needed.
- Control Network activities: there is a sensible approach for this week and currently CTRL and XO do not observe issues needing discussions.
Entry   Notes XO Integration Meeting 29.04.2020, posted by Frederik Wolff-Fabris on 29 Apr 2020, 17:28 
General Announcement:
- The Work on the Controls Network are progressing very nicely;
- Work in the tunnels: safety practices due to Covid-19 were covered in the staff meeting. 
Entry   Notes XO Integration meeting 27.04.2020, posted by Frederik Wolff-Fabris on 28 Apr 2020, 16:19 
General Announcement:
- The CTRL group has received 3 Control Network tasks that can be carried out this week;
- Requests from the groups to Tunnel activities from May 4th are being treated and an answer will come in the next couple of days. 
Entry   Notes XO Integration Meeting 24.04.2020, posted by Frederik Wolff-Fabris on 24 Apr 2020, 13:48 
Relaxation control network: 
- CTRL and XO remind the groups to submit the planned activities on e.g. scenes, projects, until Fridays. 
- For next week case: please limit any hardware change. Reason is the current limitation on the physical presence of staff. 
Entry   Notes XO Integration Meeting 22.04.2020, posted by Frederik Wolff-Fabris on 23 Apr 2020, 10:04 
General Announcement:
- An e-mail was sent yesterday about the relaxation of restrictions on the control network.
- From now on, the XO integration meeting series will happen on Monday and Wednesday at 09:30 and Friday at 11:30.
Entry   Notes Dispatch Meeting 20.04.2020, posted by Frederik Wolff-Fabris on 20 Apr 2020, 10:59 
General:
- Desy informed a power glitch occurred on Thursday 16th at 04:55AM. TS has not seen any traces of it in the EuXFEL internal GLT.
- From next week the Dispatch meeting will start at 09:30AM.
Entry   Technical Integration Meeting 15.04.2020, posted by Andreas Galler on 15 Apr 2020, 09:03 


CTRL:


notificagion service device going to be tested this week

ITDM: SMS part is operational but needs to be implemented




EEE:
Entry   Technical Integration Meeting 08.04.2020, posted by Andreas Galler on 08 Apr 2020, 08:45 


CTRL:


no bigger issues
announcement: inital simulation environment ready which can simulate BECKHOFF devices

shall