Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 148
Entry time: 03 Aug 2020, 09:23
|
Author: |
Andreas Galler |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 03.08.2020 |
|
|
General Announcement:
CTRL:
- few issues on SA3 vacuum server, over the weekend.
- twice some devices were not running,
- when restarting Beckhoff loops from the GUI please remember that it takes time until they are back
- device servers with - in their name. restarting with the service manager cannot cope with this --> fix is underway
- scheduling:
- Beckhoff: small movement error fix is underway and it is suggested to update karabo Beckhoff servers later this week.
- influxDB data logging
- current version does not allow easy correlation data from two devices in Grafan (web front-end) an update to the next higher version would cure that
- suggest to update Wednesday morning early
-
DA:
EEE:
- utca OCD calls
- PLC no OCD calls
- some updates are planned for FXE, MID SCS on Beckhoff
VAC:
XPD:
DET:
- comm AGIPD detectors
- detectors are stable, but issues with online processing
ITDM:
- new version of DAQ had been tested
- should be deployed this week
- 1 OCD call for recording data with ADQdigitizer
- requires coord between CTRL and ITDM and EEE
- this operation mode had been tested
- 1 OCD call JUNGFRAU SPB in burst mode --> did not work
- SH: was the receiver crashing?
- KW: not clear, nothing was working in that config
- SH: the problem had been identified at FXE --> fix should be deployed at SPB as well
XRO:
- update:
- follwoing up the issue with the attenuator damage in SAx
-
LAS:
- all three laser are running
- some problems with shutters
- SQS: shutter in ILH, cooling water refilled --> but interlocks could not be set
- XO to coordinate discussion with Pouneh
UNSYS:
SPB:
- karabo sessions lost connections to GUI server on exflcon026
- JUNGFRAU receiver crashing
- DAQ took long time to change state
- even switching to ignore after run take a long time
- this relates to JUNGFRAU
- GOTTHARD specref device crasing multiple times
- restarting had to be done multiple times
- optics interlock hutch was observed to be broken on Thursady night
FXE:
- digitizers at some point stopped
- connection to boards and triggers
- BF: this has to be investigated!
- beam stability
- EXAFS within 700 eV had been measured
- PP Laser was very stable
MID:
- VAC incident in CRL2 --> which closed V0 --> VAC solved the issues
- due to high pulse energies small damage to attenuator and instrument component had been
- DAQ update scheduling
-
HED:
- beam is jittering (when collimated 100 um are observed)
- CRL scene optics hutch is mixed up for one or two motors --> Thomas Preston investigate
SCS:
SQS:
- interlock / shutter issue
|