SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 148
Entry time: 03 Aug 2020, 09:23
|
Author: |
Andreas Galler |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 03.08.2020 |
|
|
General Announcement:
CTRL:
- few issues on SA3 vacuum server, over the weekend.
- twice some devices were not running,
- when restarting Beckhoff loops from the GUI please remember that it takes time until they are back
- device servers with - in their name. restarting with the service manager cannot cope with this --> fix is underway
- scheduling:
- Beckhoff: small movement error fix is underway and it is suggested to update karabo Beckhoff servers later this week.
- influxDB data logging
- current version does not allow easy correlation data from two devices in Grafan (web front-end) an update to the next higher version would cure that
- suggest to update Wednesday morning early
-
DA:
EEE:
- utca OCD calls
- PLC no OCD calls
- some updates are planned for FXE, MID SCS on Beckhoff
VAC:
XPD:
DET:
- comm AGIPD detectors
- detectors are stable, but issues with online processing
ITDM:
- new version of DAQ had been tested
- should be deployed this week
- 1 OCD call for recording data with ADQdigitizer
- requires coord between CTRL and ITDM and EEE
- this operation mode had been tested
- 1 OCD call JUNGFRAU SPB in burst mode --> did not work
- SH: was the receiver crashing?
- KW: not clear, nothing was working in that config
- SH: the problem had been identified at FXE --> fix should be deployed at SPB as well
XRO:
- update:
- follwoing up the issue with the attenuator damage in SAx
-
LAS:
- all three laser are running
- some problems with shutters
- SQS: shutter in ILH, cooling water refilled --> but interlocks could not be set
- XO to coordinate discussion with Pouneh
UNSYS:
SPB:
- karabo sessions lost connections to GUI server on exflcon026
- JUNGFRAU receiver crashing
- DAQ took long time to change state
- even switching to ignore after run take a long time
- this relates to JUNGFRAU
- GOTTHARD specref device crasing multiple times
- restarting had to be done multiple times
- optics interlock hutch was observed to be broken on Thursady night
FXE:
- digitizers at some point stopped
- connection to boards and triggers
- BF: this has to be investigated!
- beam stability
- EXAFS within 700 eV had been measured
- PP Laser was very stable
MID:
- VAC incident in CRL2 --> which closed V0 --> VAC solved the issues
- due to high pulse energies small damage to attenuator and instrument component had been
- DAQ update scheduling
-
HED:
- beam is jittering (when collimated 100 um are observed)
- CRL scene optics hutch is mixed up for one or two motors --> Thomas Preston investigate
SCS:
SQS:
- interlock / shutter issue
|