  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 26 of 29  Not logged in ELOG logo
Entry   Minutes of the Technical integration meeting 31.07.19 , posted by Adriano Violante on 31 Jul 2019, 10:46 
XO

FXE

SPB/SFX
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 29 Jul 2019, 10:16 
XO

FXE

SPB/SFX
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 26 Jul 2019, 14:07 
XO

FXE

SPB/SFX
Entry   Minutes of the Technical integration meeting 24.07.19 , posted by Adriano Violante on 24 Jul 2019, 10:54 
XO

FXE


DAQ issue reported (data not being recorded). Comment from ITDM is that this was a miro issue solved with the re initialization of the
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 22 Jul 2019, 12:42 
XO

FXE


DAQ issue reported (data not being recorded). Comment from ITDM is that this was a miro issue solved with the re initialization of the
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 19 Jul 2019, 10:48 
XO

FXE

SPB/SFX
Entry   Minutes of the Technical integration meeting 17.07.19 , posted by Adriano Violante on 17 Jul 2019, 10:05 
XO

FXE

SPB/SFX
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 15 Jul 2019, 10:01 
XO

FXE

SPB/SFX
Entry   Minutes of the Technical integration meeting 10.07.19 , posted by Adriano Violante on 10 Jul 2019, 16:16 
XO


In SASE3 the apertures of the GATT have to be realigned. The upstream apertures have been alreadz realigned. The downstream ones will
be probablz realigned tomorrow. If not succesfull some restrictions of the operation have to be evaluated. ==> Done.
Turnstile issue: 2 days
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 08 Jul 2019, 10:25 
XO

FXE


Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. ==> TK will discuss
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 05 Jul 2019, 09:54 
XO

FXE


Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. ==> Nothing was
Entry   Minutes of the Technical integration meeting 03.07.19 , posted by Adriano Violante on 03 Jul 2019, 10:18 
XO


In SASE3 the apertures of the GATT have to be realigned. The upstream apertures have been alreadz realigned. The downstream ones will
be probablz realigned tomorrow. If not succesfull some restrictions of the operation have to be evaluated.


FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 01 Jul 2019, 10:07 
XO

FXE

SPB/SFX
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 28 Jun 2019, 11:25 
XO

FXE

SPB/SFX
Entry   Minutes of the Technical integration meeting 26.06.19 , posted by Adriano Violante on 26 Jun 2019, 10:22 
XO

From now on A. Galler will join the technical integration meeting. Therefore the XO field has been added. 

FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 24 Jun 2019, 09:53 
FXE


CRLs mainteinance has been completed.


​SPB/SFX


Some power sockets are not active. NReimers will contact TS.
Detectors has been moved in the new position. MOV tests have
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 21 Jun 2019, 10:13 
FXE

​SPB/SFX


An AC device in the control room leaks. TBartsch has been informed.
Some issues with pumps going off during the power glitch
Entry   running jdd panels in control rooms, posted by ITDM Admin on 01 Apr 2019, 10:29 
​​​​​On all PCs in the control rooms including BKR and also on the exflgateway there is a new version of jddd installed
which is working with openjdk-11.
It is worth to mention that the old javaws from old oracle java 8 is deprecated and it is not recommended running jddd panels using old way, like
    Reply   Re: running jdd panels in control rooms, posted by ITDM Admin on 19 Jun 2019, 16:33 
Regarding the recent announcements from doocs/jddd people about running jddd application I post here a short summary:
- running jddd with oracle java 8 via java webstart will be no longer possible as of 10.07.19
- on all control PCs in the instruments control rooms, BKR and exflgateway the new jddd was already in use since March, as described in the previous
Entry   Minutes of the Technical integration meeting 19.06.19 , posted by Adriano Violante on 19 Jun 2019, 10:55 
FXE

SPB/SFX


No major issues
Starting from the end of this week to the beginning of next week the hutch will not be accessible because
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 17 Jun 2019, 10:43 
FXE


Floor is being re-worked. Experiment hutch is not accessible until Wednesday. After that only accessible for walk until next Monday. 


SPB/SFX

​SCS