Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 1 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Notes XO Integration Meeting 08.01.2025, posted by Frederik Wolff-Fabris on 08 Jan 2025, 08:36 
General Announcement:
- Interlock tests are ongoing in tunnels and good progress has been made.
- Planning for the LIMP-2025: it has been worked on; currently there is not a detailed plan available as discussion for tasks is ongoing. 
Entry   Notes XO Integration Meeting 06.01.2025, posted by Frederik Wolff-Fabris on 06 Jan 2025, 09:42 
General Announcement:
- Interlock tests shall start tomorrow 07.01. In case of questions please do not hesitate in contacting XO.
- Eric Boyd says on Wednesday 10AM two hutches shall be interlocked for the tests (FXE exp. Hutch and MID optical hutch) for ~15 minutes. It shall work
Entry   Notes XO Integration Meeting 18.12.2024, posted by Frederik Wolff-Fabris on 18 Dec 2024, 09:55 
General Announcement:
- This is the last XO Integration meeting this year.
- Wajid E. reminds attendance to write a ticket to CTRL when needed 
Entry   Notes XO Integration Meeting 16.12.2024, posted by Frederik Wolff-Fabris on 16 Dec 2024, 09:44 
General Announcement:
- Next Wednesday it is the last XO Integration Meeting.
Entry   Notes XO Integration Meeting 11.12.2024, posted by Frederik Wolff-Fabris on 11 Dec 2024, 09:43 
General Announcement:
- A. Galler comments the maintenance period started; already yesterday tunnels were opened due to the stop in operation from caused by the power glitch
at Desy.
Entry   Notes XO Integration Meeting 09.12.2024, posted by Frederik Wolff-Fabris on 09 Dec 2024, 09:56 
General Announcement:
- A. Galler informs two downtimes happened last two nights totalizing 10-12hs due to communication issues (between terminals) at the accelerator. 
Entry   Notes XO Integration Meeting 04.12.2024, posted by Frederik Wolff-Fabris on 04 Dec 2024, 09:41 
General Announcement:
- A. Galler informs X-rays for cw49 are currently been tuned today due to the issues with the cryo plant last week. Schedule for delivering the beam to
instruments is to start by 15:00 today.
Entry   Notes XO Integration Meeting 02.12.2024, posted by Frederik Wolff-Fabris on 02 Dec 2024, 09:56 
General Announcement:
- A. Galler informs on the changed schedule for Operation due to the difficulties with the cry plant last week: the current beamtimes are extended until
Wed 07:00 and then tuning for cw49 will take place. 
Entry   Notes XO Integration Meeting 27.11.2024, posted by Frederik Wolff-Fabris on 27 Nov 2024, 09:44 
General Announcement:
- Issues with machine at the cold compressor happened and the restart is delayed. Expectation for the cryo stable is around 15:00 today. 
Tuning will start from this point and non-standard modes probably be tuned tomorrow. Further info will be distributed during the day.
Entry   Notes XO Integration Meeting 25.11.2024, posted by Frederik Wolff-Fabris on 25 Nov 2024, 10:02 
General Announcement:
- Martin Doering announces on the upcoming Winter Maintenance period: 
1. Summary Task list was released last Friday 22.11; 
Entry   Notes XO Integration Meeting 20.11.2024, posted by Frederik Wolff-Fabris on 20 Nov 2024, 09:47 
General Announcement:
-  
Entry   Notes XO Integration Meeting 18.11.2024, posted by Frederik Wolff-Fabris on 18 Nov 2024, 09:41 
General Announcement:
-  
Entry   Notes XO Integration Meeting 13.11.2024, posted by Frederik Wolff-Fabris on 13 Nov 2024, 09:47 
General Announcement:
-  
Entry   Notes XO Integration Meeting 11.11.2024, posted by Frederik Wolff-Fabris on 11 Nov 2024, 09:46 
General Announcement:
- Last day of the FD taking place and switching back to 16.3GeV today.
Entry   Notes XO Integration Meeting 06.11.2024, posted by Frederik Wolff-Fabris on 06 Nov 2024, 09:38 
General Announcement:
- Invitation for scheduling meeting was distributed to some groups. The Winter maintenance period is relatively short.
- UOM next Friday takes place with presentations from FD studies and jitter reports from the instruments.
Entry   Notes XO Integration Meeting 04.11.2024, posted by Frederik Wolff-Fabris on 04 Nov 2024, 09:44 
General Announcement:
- Last Friday was the deadline to submit the Winter Maintenance task list. We thank the groups who have submitted them. If your group did not make it yet,
please get in touch with XO.
Entry   Notes XO Integration Meeting 30.10.2024, posted by Frederik Wolff-Fabris on 30 Oct 2024, 10:14 
General Announcement:
- Friday Nov. 1st is the deadline to submit the winter maintenance task list to XO.
Entry   Notes XO Integration Meeting 28.10.2024, posted by Frederik Wolff-Fabris on 28 Oct 2024, 10:03 
General Announcement:
-  
Entry   Notes XO Integration Meeting 23.10.2024, posted by Andreas Galler on 23 Oct 2024, 09:19 
General Announcement:


 


CTRL:


MPOD voltage limiter of PES is being investigated


DA:
Entry   Notes XO Integration Meeting 21.10.2024, posted by Andreas Galler on 21 Oct 2024, 09:28 
General Announcement:


nothing


CTRL:


Nothing major


DA:
ELOG V3.1.4-7c3fd00