Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 141     Entry time: 10 Jul 2020, 13:50
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 08.07.2020 
General Announcement:
- Machine start-up continues to be ahead of schedule. Beam transmission to T4D and T5D has been done during the night (with open undulators). 
- An Invitation for the User&Operation Meeting on next Friday 09:00 was sent to the user&opmeeting mailing list. If you did not receive it, please contact XO.
- XO Integration Meeting takes place only on Mondays and Wednesdays at 09:30AM. 

CTRL:
- The synchronized shutdown, f/w update, configuration and restart of both CTRL network routers by DESY-NOC was performed yesterday. 
This included the Karabo shutdown and restart in tunnels, instruments, etc.
- Problems linked to the re-start: in LAS a miss-behaving ADC and a faulty host cpu issue; in CTRL some obsolete deployment information. 
- This Router update has to be schedule during the shutdown to avoid above mentioned issues. 
- CTRL observed two Basler cameras which did not reestablish a network connection after the router updates: Please try power cycling the camera to restore system.

DA:
- No complications due to routers update.

EEE:
- Cabling installation in SCS is in progress. 
- Technical staff will commission the FXE's two new brakes for XGM.

VAC:
- Not present.

XPD:
- Re-starting X-ray photon diagnostics devices this week.
- XGMs are ready for recommissioning.

DET:
- Nothing to report.

ITDM: 
- Maintenance of ELOG server and update of application has been done last night. System has restarted.

XRO:
- Not present.

LAS:
- All LASERS are back today.
- Due to the router update, SA1 laser was the most affected due to loose of thermalization and was OUT of operation a full day. SA2 was OUT only for the afternoon.

UNSYS:
- Nothing to report.

SPB:
- Getting ready for beam: few DAQ issues still open but being worked out.

FXE:
- All motors in SA1 were OFF due to Karabo re-start linked to router update.

MID:
- Update of Linux computers: ITDM will communicate with MID for the re-installation. 

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.