Notes XO Integration Meeting 03.08.2020, posted by Andreas Galler on 03 Aug 2020, 09:23
|
General Announcement:
.
CTRL:
few issues on SA3 vacuum server, over the weekend.
twice some devices were not running,
when restarting Beckhoff |
Notes XO Integration Meeting 29.07.2020, posted by Andreas Galler on 29 Jul 2020, 08:59
|
General Announcement:
.
CTRL: |
Notes XO Integration Meeting 27.07.2020 , posted by Andreas Galler on 27 Jul 2020, 09:05
|
General Announcement:
XO discusses the need for sharing information.
CTRL: |
XO integration meeting 22.07.2020, posted by Andreas Galler on 22 Jul 2020, 09:22
|
General Announcement:
Default beam positions are being implemented for each SASE at the FEL imager to reduce re-alignment offers for the instrumetns after
shutdowns and facility development weeks
CTRL: |
Notes XO Integration Meeting 20.07.2020, posted by Frederik Wolff-Fabris on 20 Jul 2020, 14:18
|
General Announcement:
- Regarding Operation, VAC and PRC had a workaround to restore the North branch beam permission on Sunday.
- XTD9 Turnstiles were not working this morning for ZZ access planned by FXE.
|
Notes XO Integration Meeting 15.07.2020, posted by Frederik Wolff-Fabris on 17 Jul 2020, 10:19
|
General Announcement:
- SASE3 tuning will start this afternoon and possibly will last until Thursday afternoon. SCS and SQS will share the closures of their hutches.
|
Notes XO Integration Meeting 13.07.2020, posted by Frederik Wolff-Fabris on 14 Jul 2020, 13:45
|
General Announcement:
- XO will reset the calendar invites for the XO Integration Meetings of Mondays and Wednesdays as well as for the User&Operation Meetings on Fridays. Usual
times will be
|
Notes XO Integration Meeting 08.07.2020, posted by Frederik Wolff-Fabris on 10 Jul 2020, 13:50
|
General Announcement:
- Machine start-up continues to be ahead of schedule. Beam transmission to T4D and T5D has been done during the night (with open undulators).
- An Invitation for the User&Operation Meeting on next Friday 09:00 was sent to the user&opmeeting mailing list. If you did not receive it, please contact |
Notes XO Integration Meeting 06.07.2020, posted by Frederik Wolff-Fabris on 07 Jul 2020, 13:23
|
General Announcement:
- Since the end of the shutdown last Friday, the current Program is "Access/Tuning/Setup";
- DESY/MXL has started ramping up the Gun, powering and testing the Magnets and phasing the RF stations.
|
Notes XO Integration Meeting 03.07.2020, posted by Frederik Wolff-Fabris on 03 Jul 2020, 14:21
|
General Announcement:
- The Interlock tests are finished in all tunnels and XHEXP1 areas, following information from D3 and SRP.
- From next week we will continue with XO Integration Meeting only on Mondays and Wednesdays at 09:00. The Fridays' XO Int. Meetings will be terminated.
|
Notes XO Integration Meeting 01.07.2020, posted by Frederik Wolff-Fabris on 01 Jul 2020, 13:53
|
General Announcement:
- Interlock tests are starting in SASE3 instruments right now. Zunaira, Eric and Wolfgang Clement are coordinating the TUV tests in the XHEXP1.
- MXL announced a draft for the machine start-up schedule which is published at the BKR e-log. The link to the schedule is:
|
Notes XO Integration Meeting 29.06.2020, posted by Frederik Wolff-Fabris on 30 Jun 2020, 08:50
|
General Announcement:
- The Photon Run Coordinator will re-start next Friday July 3rd. Please also feel free to contact him/her (9-4800) for daily coordination and communication
with the
|
Notes XO Integration Meeting 24.06.2020, posted by Frederik Wolff-Fabris on 25 Jun 2020, 10:27
|
General Announcement:
- Exceptionally next Friday the XO Intergration Meeting will not take place. The meeting will resume next Monday.
|
Notes XO Integration Meeting 22.06.2020, posted by Frederik Wolff-Fabris on 23 Jun 2020, 14:12
|
General Announcement:
- The User & Operation Meeting that took place at beginning of this year on Fridays will re-start on July 10th.
Proper announcement and Zoom link will be sent. In this context, the XO Integration Meeting will continue only on Mondays and Wednesdays.
|
Notes XO Integration Meeting 19.06.2020, posted by Frederik Wolff-Fabris on 19 Jun 2020, 14:28
|
General Announcement:
- Next Monday it is planned the NOT-AUS experiment in the frame of Interlock tests and the emergency off will be disabled.
Only groups with EQP persons can continue working in the hutches. An e-mail was sent by TS.
|
Notes XO Integration Meeting 17.06.2020, posted by Frederik Wolff-Fabris on 18 Jun 2020, 13:40
|
General Announcement:
- Today and tomorrow it takes place the tunnel ventilation maintenance between 6:30 and 8:00AM;
- An e-mail was sent to readiness list with tunnel access restrictions for next Friday morning at the Osdorf Born site in and XTD4 work between 10-11AM.
|
Notes XO Integration Meeting 15.06.2020, posted by Frederik Wolff-Fabris on 16 Jun 2020, 13:32
|
General Announcement:
- There will be additional ventilation maintenance on all tunnels, scheduled for next WED/17th and THU/18th between 06:30AM and 08:00AM.
We request staff to do not enter in tunnels during this period.
|
Notes XO Integration Meeting 12.06.2020, posted by Frederik Wolff-Fabris on 12 Jun 2020, 13:48
|
General Announcement:
- There will be tunnel ventilation additional maintenance on two mornings next week from 6:30 to 8:00AM. An e-mail to Readiness list will be send when
dates are known.
|
Notes XO Integration Meeting 10.06.2020, posted by Frederik Wolff-Fabris on 10 Jun 2020, 11:12
|
General Announcement:
- Maintenance in the Tunnel Air Conditioning is completed. No more work restrictions are in place besides the regular COVID-19 rules.
|
Notes XO Integration Meeting 08.06.2020, posted by Frederik Wolff-Fabris on 09 Jun 2020, 15:47
|
General Announcement:
- SA2 lasing: up to 2mJ@9keV was achieved with strong linear and quadratic tapering with 250pC bunch charge.
Lasing with 500pC achieved 0.45mJ@9keV and with 100pC achieved 0.75mJ@9keV.
|