Entry   Report of the Technical integration meeting , posted by Adriano Violante on 08 Jan 2020, 12:36 
SPB:


Coordinatd motion for MC2 motors is going to be rolled out by EEE soon.


FXE:


No issues to report.


MID:
Entry   Report after tech. Int. meeting 09.30, posted by Adriano Violante on 18 Dec 2019, 10:06 
MID:


SDL tests ongoing. Important motors have been tested. Alignment of the mechanics with the alignment laser ongoing. Will be pumped over
Christmas.


 EEE:
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 16 Dec 2019, 09:28 
FXE:


uTCA update has been completed by EEE on Friday evening. Information will be passed to controls for the finalization.


SCS


The interlock system for the big sliding door has to be fixed. JTD is following up the issue with TS and SRP.
MT will talk
Entry   Report after Tech. Int. meeting 09.30 , posted by Adriano Violante on 11 Dec 2019, 09:54 
FXE:


New optical table will be installed today. Access to the hutch could be limited.
The new Airbox installed by D3 is colliding
with the sliding door. It might be problematic to bring the new laser table in. SRP informed. It is being followed up. 
uTCA update will
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 09 Dec 2019, 09:22 
FXE:


No major issues.
Karabo will be updated to the version 2.7.0. on Friday.
uTCA update will be done on Thursday.


SCS:


it was forgotten to involve EEE in the PLC update of the train picker in the tunnel. Now the issue is solved.


MID:
Entry   Summary of the technical integration meeting, posted by Adriano Violante on 04 Dec 2019, 14:18 
FXE


No major issues - PLCs update has been started by EEE (BB)


SCS


Hrixs and related components will be delivered on 13 and 14.01.2020. SCS is coordinating the works with TS in order to crane the chambers
Entry   affected ITDM Systems after power cut tonight, posted by Andreas Galler on 28 Nov 2019, 15:42 



XHQ.E1.092

SW-HH-AL-271 was available
SW-HH-AL-272 came back after the DL switch was back (see below, ca 09:33)
Entry   dispatch meeting Mon Nov 25 2019, posted by Andreas Galler on 27 Nov 2019, 09:25 
FXE: no issues

SPB: no issues

MID: Split & Delay line arriving on Friday, MID aims for a quick integration into instrument / beamline
Entry   Minutes of the Technical integration meeting 20.11.19 , posted by Adriano Violante on 20 Nov 2019, 10:12 
​FXE


Wille was asked by D3 to pull new cables for the Pandora in FXE on 19.11.. This was not known by FXE. Will be discussed with
Safety/DNölle.
Mono was fixed and is now ready for commissioning with beam


​SPB/SFX
Entry   Status report after tech. Int. Meeting 9.30, posted by Adriano Violante on 13 Nov 2019, 10:12 
​FXE


Radiation tests ongoing.
EEE informs that the PLC drawings will be exchanged in the WS


SPB/SFX

​SCS
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 12 Nov 2019, 09:49 
​FXE



FXE – radiation tests and LPD tests planned for this week. Small issues with the scan tools are
being addressed.



SPB/SFX
Entry   Minutes of the Technical integration meeting 28.08.2019, posted by Adriano Violante on 28 Aug 2019, 10:33 
XO

FXE


Leak in the LPD cooling system has been found. DET on it. Ongoing
Laser went out of synch several time during the last weeks.
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 26 Aug 2019, 09:52 
XO


Today a test of the fire alarm system will take place. Mail has been circulated by SRP.
From next monday the dispatch meeting
time slot will change to 8.30. Chair will be with XO.


​FXE
Entry   Minutes of the Technical integration meeting 21.08.19 , posted by Adriano Violante on 21 Aug 2019, 11:15 
XO


A review of the procedures in case of power failure is in progress. Thanks to everybody for the efforts during the last days.


​FXE


Remote control of the radiation shutter dows not work. IP of the new computer is needed. Will be solved offline between FXE, CAS and
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 19 Aug 2019, 11:11 
General


Still recovering from the power loss occured on Saturday (The primary line was affected). In the hall the power was down for about 30
minutes, while in the tunnels it seems it was only a glitch.
It is clear that it was a major system failure. Optimization of procedures and
Entry   Minutes of the Technical integration meeting 14.08.2019, posted by Gerd Wellenreuther on 14 Aug 2019, 10:01 
XO


On Monday at around 12:20 there was a power glitch at least in Hamburg, affecting the machine.
In this cause, the startup
was delayed due to a missing signal from the Vacuum EPS-MPS-interface. The signal had to be manually enabled again.
Tuning is estimated to take
Entry   Status report after dispatch meeting 12.8., posted by Gerd Wellenreuther on 12 Aug 2019, 09:50 
XO

FXE


XTD1 CRLs: There is an issue regarding a limit switch, to be repaired in the shutdown by MKnoll + EEE.


SPB/SFX
Entry   Minutes of the Technical integration meeting 07.08.2019, posted by Adriano Violante on 07 Aug 2019, 11:55 Technical_Integration_Meeting_07.08.2019_-_Copy_(4).pptx
XO

The accelerator is now working at 2.25 MHz. Kicker can be used. DET informs that for repetition rates different to the ones been used so
far the calibration can be significatively different.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 05 Aug 2019, 10:19 
XO

FXE


Photon3 detector has been fully implemented.


SPB/SFX
Entry   Info on dispatch meeting 09.00, posted by Adriano Violante on 02 Aug 2019, 09:10 
The meeting did not take place since only EEE was attending.