Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 139
Entry time: 03 Jul 2020, 14:21
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 03.07.2020 |
|
|
General Announcement:
- The Interlock tests are finished in all tunnels and XHEXP1 areas, following information from D3 and SRP.
- From next week we will continue with XO Integration Meeting only on Mondays and Wednesdays at 09:00. The Fridays' XO Int. Meetings will be terminated.
- Next Friday 10.07 the User and Operation Meeting will re-start at 09:00 in the virtual format. Invitation and corresponding Zoom link will be send in a separate e-mail.
CTRL:
- Preparation for operations has started. Three issues have been addressed:
1. XPD issues are currently been worked and will extend over next week;
2. XFEL gateway troubles seems linked to a router configuration;
3. Migration of old data logger: problem with MID LA2 and SA3 (running wrong migration).
- Recovering complex configurations: meeting 12:00 with ITDM - please wait until Monday for update.
DA:
- Not present.
EEE:
- Follow-up of the shutdown activities is ongoing; Modification of PLCs was done.
VAC:
- Vacuum at beamlines are running; Shutters are ready.
- VAC plans to open XTD6 again from next Monday up to Friday, allowing HED access and work.
- Please inform VAC if XTD09 is needed to be accessed. Currently a ZZ is foreseen for this tunnel (EEE request).
- XTD10 can be accessed by ZZ during next week.
XPD:
- Small bugs on the DOOCS side of XGM were observed: bridges were checked and looked fine.
- XPD is planning the re-start of devices and support for machine tuning in coming weeks.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- SA2 laser: Train-ID showed issues (Update software failed).
- SA1 laser: went down due a crate failure and is warming.
- SA3 laser is fine.
UNSYS:
- Nothing to report.
SPB:
- AGIPB update needs to be fixed.
FXE:
- LPD new DAQ could not save data.
- Calibration pipeline for LPD is OK.
- Calibration pipeline for JungFrau does not work - also CTRL fixed the crash with DAQ (how the image gets the train ID's). The crash is not observed anymore.
MID:
- Discovered problems with motors in Laser room: EEE is informed and investigates.
HED:
- Will need access to XTD6 for final checks from Monday. Please inform VAC when access is finished.
SCS:
- Not present.
SQS:
- Not present. |