Group Selection Page
HELP
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Operation
PSPO
XO
TS
Migrated2Zulip
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 139
Entry time: 03 Jul 2020, 14:21
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 03.07.2020 |
|
|
General Announcement:
- The Interlock tests are finished in all tunnels and XHEXP1 areas, following information from D3 and SRP.
- From next week we will continue with XO Integration Meeting only on Mondays and Wednesdays at 09:00. The Fridays' XO Int. Meetings will be terminated.
- Next Friday 10.07 the User and Operation Meeting will re-start at 09:00 in the virtual format. Invitation and corresponding Zoom link will be send in a separate e-mail.
CTRL:
- Preparation for operations has started. Three issues have been addressed:
1. XPD issues are currently been worked and will extend over next week;
2. XFEL gateway troubles seems linked to a router configuration;
3. Migration of old data logger: problem with MID LA2 and SA3 (running wrong migration).
- Recovering complex configurations: meeting 12:00 with ITDM - please wait until Monday for update.
DA:
- Not present.
EEE:
- Follow-up of the shutdown activities is ongoing; Modification of PLCs was done.
VAC:
- Vacuum at beamlines are running; Shutters are ready.
- VAC plans to open XTD6 again from next Monday up to Friday, allowing HED access and work.
- Please inform VAC if XTD09 is needed to be accessed. Currently a ZZ is foreseen for this tunnel (EEE request).
- XTD10 can be accessed by ZZ during next week.
XPD:
- Small bugs on the DOOCS side of XGM were observed: bridges were checked and looked fine.
- XPD is planning the re-start of devices and support for machine tuning in coming weeks.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- SA2 laser: Train-ID showed issues (Update software failed).
- SA1 laser: went down due a crate failure and is warming.
- SA3 laser is fine.
UNSYS:
- Nothing to report.
SPB:
- AGIPB update needs to be fixed.
FXE:
- LPD new DAQ could not save data.
- Calibration pipeline for LPD is OK.
- Calibration pipeline for JungFrau does not work - also CTRL fixed the crash with DAQ (how the image gets the train ID's). The crash is not observed anymore.
MID:
- Discovered problems with motors in Laser room: EEE is informed and investigates.
HED:
- Will need access to XTD6 for final checks from Monday. Please inform VAC when access is finished.
SCS:
- Not present.
SQS:
- Not present. |