Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 2 of 31  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Notes XO Integration Meeting 24.03.2025, posted by Frederik Wolff-Fabris on 24 Mar 2025, 09:42 
General Announcement:
- A. Galler informs that on Friday there is the LIMP meeting organized by Martin Doering. Please contact him in case of questions. Information will be
transmitted to people who does not attend it.
Entry   Notes XO Integration Meeting 19.03.2025, posted by Frederik Wolff-Fabris on 19 Mar 2025, 09:35 
General Announcement:
- As PRC, A. Galler informs delivery has started this week and everything runs accordingly to the plan so far.
Entry   Notes XO Integration Meeting 17.03.2025, posted by Frederik Wolff-Fabris on 17 Mar 2025, 09:36 
General Announcement:
- As DRC, Jola S.-D. says it was a quiet weekend.  
Entry   Notes XO Integration Meeting 12.03.2025, posted by Frederik Wolff-Fabris on 12 Mar 2025, 09:36 
General Announcement:
- A. Galler informs the beam delivery start is delayed currently up to 15:00 due to difficulties in setting up the machine after the FD week.
- Couple of meetings regarding the LIMP are scheduled; plans have been distributed and will be shared during the meetings. 
Entry   Notes XO Integration Meeting 10.03.2025, posted by Frederik Wolff-Fabris on 10 Mar 2025, 09:53 
General Announcement:
- From the DRC side, there is nothing particular to report.
- From the PRC side, nothing apart of what was reported below.
Entry   Notes XO Integration Meeting 05.03.2025, posted by Frederik Wolff-Fabris on 05 Mar 2025, 09:40 
General Announcement:
- On the LIMP-2025 (accordingly to an e-mail sent by M. Doering on 24.02): reminder that groups are requested to give a feedback on the task list for the
LIMP until tomorrow, 06.March.
Entry   Notes XO Integration Meeting 03.03.2025, posted by Frederik Wolff-Fabris on 03 Mar 2025, 09:48 
General Announcement:
- For next Friday 07.03 UOM a jitter report from instruments is expected together with presentations from groups using beam during this FD week.
Entry   Notes XO Integration Meeting 26.02.2025, posted by Andreas Galler on 26 Feb 2025, 09:24 
General Announcement:
-     

CTRL:
Entry   Notes XO Integration Meeting 24.02.2025, posted by Andreas Galler on 24 Feb 2025, 09:26 
General Announcement:
-     

CTRL:
Entry   Notes XO Integration Meeting 19.02.2025, posted by Andreas Galler on 19 Feb 2025, 09:29 
General Announcement:
-     

CTRL:
Entry   Notes XO Integration Meeting 17.02.2025, posted by Frederik Wolff-Fabris on 17 Feb 2025, 09:39 
General Announcement:
-  
Entry   Notes XO Integration Meeting 12.02.2025, posted by Frederik Wolff-Fabris on 12 Feb 2025, 09:53 
General Announcement:
- Delivery to instruments restarted this morning with good FEL performance (above the average). HXRSS in SA2 to be done during the day.
- As PRC, Maurizio Vannoni has nothing to report. So far so good.
Entry   Notes XO Integration Meeting 10.02.2025, posted by Frederik Wolff-Fabris on 10 Feb 2025, 09:45 
General Announcement:
-  
Entry   Notes XO Integration Meeting 05.02.2025, posted by Frederik Wolff-Fabris on 05 Feb 2025, 09:44 
General Announcement:
-  
Entry   Notes XO Integration Meeting 03.02.2025, posted by Frederik Wolff-Fabris on 03 Feb 2025, 09:39 
General Announcement:
- Experiment tuning week is ongoing; Two downtimes happened over the weekend due to 1. an electronic component part of quench circuit of a cold magnet
in A20 (11hs) and 2. interlock issues at the injector 
Entry   Notes XO Integration Meeting 29.01.2025, posted by Frederik Wolff-Fabris on 29 Jan 2025, 09:50 
General Announcement:
- Steffen Hauf comments that DOC is active from today and also requests SXP and SCS to get in touch with DRC on needed nodes.
- UOM will restart next Friday at 9AM.
Entry   Notes XO Integration Meeting 27.01.2025, posted by Frederik Wolff-Fabris on 27 Jan 2025, 09:59 
General Announcement:
- Maurizio Vannoni reports on behalf of XRO on the ramp-up activities over the weekend: 
SA1 - positions of mirrors were found (post in Zulip) No major problems were found; Attenuators look fine; 
Entry   Notes XO Integration Meeting 22.01.2025, posted by Frederik Wolff-Fabris on 22 Jan 2025, 09:47 
General Announcement:
- Please call DOC number and get in touch with DRC is one needs to save data for any activity or face issues with CTRL and DAQ.
- User and Operation Meeting will start only next week 31.01.
Entry   Notes XO Integration Meeting 20.01.2025, posted by Frederik Wolff-Fabris on 20 Jan 2025, 09:50 
General Announcement:
- E. Boyd reminds on the return of the beam shutter keys: actual plan is to return keys no later than Friday. The SA3 hutches are to be closed on the weekend.
- The User & Operation meeting will start from next week, Friday 31.01.
Entry   Notes XO Integration Meeting 15.01.2025, posted by Frederik Wolff-Fabris on 15 Jan 2025, 09:40 
General Announcement:
- A. Galler announces that yesterday the cooling water of 20C was leaking. The reason is still to be found, as per e-mail from TS sent to the xo-info.
ELOG V3.1.4-7c3fd00