377
|
28 Nov 2022, 09:58 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.11.2022 |
General Announcement:
- The XO Integration Meetings will continue until the end of the year; For next year SXP will be included in the round of discussions.
- A. Galler reminds on the electrical and water supply maintenance on Saturday 3rd. Please read the latest e-mail from TS and contact xo-planning@xfel.eu in case of questions.
- SXP hutch is currently interlocked for the ramp down day. A. Scherz will ask G. Mercurio for closing also SCS experimental hutch.
CTRL:
- Nothing to report.
DA:
- All fine at DA.
EEE:
- Dates for switching OFF the PLCs for the Dec.3rd activity are available at the EuXFEL infrastructure calendar.
VAC:
- Nothing to report.
XPD:
- Working on the ramp-down activities today. Ongoing activities can be seen at Remote1 Zoom session from BKR.
DET:
- DSSC was tested in commissioned.
- SPB/SFX AGIPD modules were exchanged and detector is running again.
- No news from Jungfrau / Burst mode.
ITDM:
- Start tomorrow with online resources at balcony room updates (out of service during intervention).
- Over the weekend ITDM takes the chance to migrate InfluxDB: system not available.
- On Friday the network gateway will be updated.
XRO:
- Busy with ramp-down day.
LAS:
- Nothing to report.
UNSYS:
- Cell29/SA1 Phase shifter presents a problem and is to be fixed from tomorrow by exchanging motors.
SPB:
- Working with Agipd and ramping down for the weekend.
FXE:
- XRO is using FXE hutch for the ramp-down.
- Preparing for the power work on Saturday.
MID:
- All fine at MID; started with ramp down procedure.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Not present. |
560
|
28 Oct 2024, 10:03 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.10.2024 |
General Announcement:
-
CTRL:
- Nothing to report.
DA:
- Yesterday a data analysis tool had a hiccup which required to SCS more nodes reserved. Resolved.
EEE:
- DOC call to an unknown state for the HDC / pulsed magnet at HED. EEE is investigating.
VAC:
- Nothing to report.
XPD:
- Problem on Sunday with XGM; re-started by Theo and worked again.
- PES / SA3: no news; under work by J. Laksman; spectrum shall be possible but not use for 2CPP. A ZZ is planned in XTD10 for tomorrow morning (Tuesday).
DET:
- Nothing major to report;
- Issue with MID AGIPD noisy modules requiring power cycles: detector is OFF and experts are contacted.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report;
- Reply for a requested ZZ is pending. Perhaps to happen tomorrow (Tuesday).
SPB:
- Experiment wad done; data collected; Sunday night shift was cancelled.
FXE:
- LPD issues with temperature of the front ends, requiring power cycle; Also issues with data acquisitions.
Steffen H. says one module was causing problems with data aggregators and since Saturday it was fine.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Apart of the damage problem yesterday morning, nothing to report.
SQS:
- Working in the hutch to prepare for next beamtimes.
SXP:
- Preparing for the experiment starting on Wednesday. |
173
|
29 Oct 2020, 08:11 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.10.2020 |
General Announcement:
-
CTRL:
- SA3 VAC loop - 2 approaches to find out the root cause (discussed also with EEE):
1. Thursday 8-11:00AM to test the whole loop by partitioning batches of devices. This may pinpoint the single device that cause the problem.
2. Reproduce the problem at lab level. Based on the reproducibility this approach will be continued in parallel.
DA:
- Nothing to report.
EEE:
- PLC colleagues are troubleshooting SA3 VAC loop.
- DET reported that measurements are carrying on wrong train-IDs. Tests are being made in the lab (not reproducible) but EEE is working on it.
VAC:
- SA3 VAC loop is main activity - interaction with Michaela P.
XPD:
- Group mainly busy with Photon Diag Conference this week.
- Supporting STAB and not heard any major issues in this effort.
DET:
- Report on the train-ID. This affects all the AGIPDs including the mini-half.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Preparing for next week operation.
UNSYS:
- Nothing to report.
SPB:
- Collected lot of data last few days: SPB/SFX thanks LAS and accelerator teams for support.
FXE:
- Nothing to report.
MID:
- All fine.
HED:
- All fine.
SCS:
- Issue with door interlock: Eric B. has investigated this morning. Problem seems to be with the maglocks and has been solved for now but a long term has to be worked on.
SQS:
- Nothing to report. |
362
|
28 Sep 2022, 10:02 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.09.2022 |
General Announcement:
- Announcement: September 30th is the deadline for submitting the Maintenance task list. So far XO received 3 lists.
- Maurizio V. informs that this moment some groups are not yet aware of the 03.12 electrical intervention. The Maintenance time is therefore shorted. XRO will place in task list all planned activities but
the confirmation if they take place depends on the actual time available for the work.
A. Galler informs that a presentation wad done in this meeting series and also to the STGL who shall also communicate to their respective groups. It is also perfectly fine to mention that a task may not be
carried out if it depends on timing plan. In any updates XO will inform via e-mails to xo-info or directly with affected groups.
CTRL:
- Nothing major to report. Follow-up today with MID (on the feedback mirror) in live session.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Concerning the timing system Detector: call to DOC was received and issue was solved.
ITDM:
- Issue reported last Monday by ITDM (data migration / GPFS): ticket was created and is under investigation.
XRO:
- Nothing to report.
LAS:
- Discussion on the electricity work on Dec. 3rd: XO would like to discuss with LAS later today.
UNSYS:
- Small issue in SA1/cell9: water in the vacuum chamber. Solved by M. Yakopov and MKK.
- Task list is submitted.
SPB:
- Nothing to report.
FXE:
- Naresh K. reports yesterday night the Hirex was setup for next week together with Peter Z. and it was done by 01:30AM. FXE had no plans for beam usage after that.
MID:
- Feedback to XRO: last week MID changed the mirror stripes from Platinum to B4C using the macros and it worked nicely.
HED:
- Done with compensation to users beamtime; currently changing setup for next user and will not use beam during the day and only few bunches tonight.
SCS:
- Experiment running: no issues.
- Noise with Fast ADC and the ADQ412 was observed when amplifiers were ON: To be checked.
SQS:
- Nothing to report. |
164
|
28 Sep 2020, 11:02 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.09.2020 |
General Announcement:
- Andreas G. informs the winter maintenance period will happen in two months approximately. The call for tasks will go out this week to the support groups and
instruments.
- XO informs Desy and TS are investigating the Thursday's event of power cut but do not yet have a clear reason for it.
- Jan G. informs that SCS hutch will be closed and searched this afternoon for the FD on Gain Studies.
CTRL:
- Notification service informed on a broken event. After a Karabo shutdown the FXE topic is fine again.
- Power cut: CTRL sees no issues as leftovers.
- Investigation of missing data in DOOCS (10 seconds outdated): CTRL has two colleagues looking into it.
- Supporting EEE and LAS on the ongoing working with PP-lasers.
- Update of dataloggers has to be made again. It means a 2 minutes downtime during the course of today/afternoon if nobody has something against.
DA:
- Question to CTRL: a notification service was forward to us. DA needs further description on that. Steffen H. says it was related to the python server and this is not
deployed by CTRL.
This is the reason why was forward to DA.
EEE:
- Follow up from Friday recover on the power glitch of Thursday: some cards in SA1 balcony rooms were not reachable anymore on Friday. These lead to a complete restart of
the whole crate (means interruption of timing). After additional local intervention communication to the MPS was restored.
- Changed the fast ADC of PP laser in SA1.
VAC:
- Nothing to report.
XPD:
- No issues to report.
DET:
- Agipd was power up after the power cut and had no issues.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- SA3 PP-laser: problems with SQS site. It misses the power energy (dropped down) and is under investigation. Maybe it is related to some optics assembling.
- SA2 PP-laser: power supply for AMPHOS was lost on Friday. The spare part arrives today at 11:00 and will be changed this afternoon.
- SA1 PP-laser: problem with uTCA (no ADC running and not possibility to login). Crate hangs after every few hours. Working together with EEE (100% in EEE side).
UNSYS:
- The problems with cell1/SA2 not moving were fixed by Suren K.
- Cell2/SA3 hardware problems (couplers) found this morning relates to an Ethernet card which needs to be replaced by ZZ. This cell is not operational.
- Phase shifters in SA3, cell4 and cell5 are not moving. The hardware works and it may be some higher level controls.
- Couplers were sent to Beckhoff for further investigation in order to find solution for decreasing the number of failures in future.
SPB:
- Nothing to report.
FXE:
- Due to issues with PP-laser the FXE did not test the timing tool during the weekend.
MID:
- All fine: still minor vacuum issue in the optical room but MID hopes to be solved soon.
HED:
- Pulse on demand tool was tested last Monday.
SCS:
- Nothing to report.
SQS:
- Nothing to add. |
543
|
28 Aug 2024, 09:52 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.08.2024 |
General Announcement:
- Communications Group thanks all people involved on the SRI visit. The extension of the beam delivery also worked nicely to instruments.
- As PRC, A. Galler says so far there is nothing to report or discuss for the current week.
- For next Friday the UOM will have presentations from the instruments (on stability) and from the FD activities.
CTRL:
- Nothing to report.
DA:
- All fine with DA.
EEE:
- Not present.
VAC:
- Not present.
XPD:
- No issues; preparing for the FD studies;
- ZZ in XTD2 on Friday to repair camera needed for XFLO.
DET:
- MID AGIPD HV issue on weekend: no power glitch happened that was registered from Desy systems;
still not understood the reason but likely a local power glitch (small voltage drop (peak) was seen) and will be further tracked.
ITDM:
- E-mail sent yesterday for general configuration on displays.
XRO:
- Not present.
LAS:
- SA1-PPL Amphos service ongoing;
- SA3-PPL changing repetition rate for next experiments.
UNSYS:
- Everything is fine.
SPB:
- Nothing to report.
- Issues with trigger distribution systems yesterday happened but was fixed on the fly.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Not present. |
246
|
28 Jul 2021, 09:29 |
Arvid Gebhardt | General | Information | Notes XO Integration Meeting 28.07.2021 |
General Announcement:
- No general announcement.
CTRL:
- Problem with cameras / DAQ: fixed yesterday and tested at SA2/MID.
- Issues with SA3 vacuum loop: work ongoing and further investigations are needed.
DA:
- Nothing to report.
EEE:
- Cables available for HED to be installed next week – date to be discussed offline.
- Fast electronics side: working on FXE and HED issues;
- Nerea J. reports on the VAC/SA3 issues: instability with devices going into an unknown state. Alessandro S. works at the night shift in the DOC and will try to fix a permanent fix during the night.
VAC:
- SA3 issues are affecting also the gas attenuator (not only general SA3 vacuum loop but also GATT is affected, which has its own loop). There are no physical events - seems to be electronic. Stability issues to connect devices; Seems to be more related to infrastructure (PLCs). Further investigations are needed.
ME:
- Not present.
XPD:
- SPB imager: change setting of motors (it shall work now) and next week when A. Koch is back further investigations will be done.
DET:
- During the night after 02:00AM: SPB AGIPD K-bridge went OFF. Under investigation. Detector recovered this morning.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Nothing special to report.
UNSYS:
- Nothing to report.
SPB:
- Issues with wings of Agipd, causing also interlock trigger. Under investigation.
- 11PM last night: laser interlock triggered. It happened also in the past and SPB will get in touch with Safety today.
- XTD9 IMG: currently working but a permanent fix is welcome in the future.
FXE:
- Not present.
MID:
- All fine.
HED:
- Major issues with Agipd detector yesterday (thanks to DOC for help): 1. Could not kill the service and CTRL investigated; 2. Clock and control did not work (it has worked at CFEL last week). The issue was solved by changing the clock controller back to old configuration (EEE helped). Bruno F. comments that the clock control had to be downgraded in this detector (it worked in other detectors, only this one did not work). Further investigations will follow.
SCS:
- Change of speed from the monochromator was not possible. EEE and CTRL are working on it.
- Next week will run with a special train picker / bunch sequence pattern as the one used last week.
SQS:
- Vacuum problem as mentioned.
- Commissioning DSSC for future beamtimes. |
430
|
28 Jun 2023, 10:22 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.06.2023 |
General Announcement:
- PKG maintenance in SA1-2-3 areas (XHEXP1) is to take place today and fluctuations of temperature are to be expected.
- Please remember that from next Monday 03.07 access is to be done with the new transponder only.
CTRL:
- Karabo deployment done for instruments and SASE topics: couple of issues for LAS (Galvo device could not be started; dependence was then installed manually and is now fixed).
DA:
- Nothing to report.
EEE:
- Runs smoothly with activities; no issues were found so far.
VAC:
- Everything accordingly to the plan.
XPD:
- PES in SASE3 is repaired. No other issues for maintenance plans.
DET:
- Nor present.
ITDM:
- Status of storage: SA1 is up and running; SA3 storage had a hardware upgrade to new technology (old still available) and an e-mail will be sent to local contacts of proposals/users;
SA2 storage upgrade is ongoing and decision where to exchange hardware is to be made today.
XRO:
- Not present.
LAS:
- Galvo issue is solved.
- Other issues were also solved and good to go.
UNSYS:
- Ready with tunnel tasks.
- After replacing quad vacuum chamber in SA3 cell 22 and cell23: Desy vacuum group used a Pt-100 sensor installed and is limiting the travel range of the Quadrupole.
The range was measured and needs to be discussed with MXL if allows operation.
SPB:
- Not present.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Everything on the track.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Not present. |
237
|
28 Jun 2021, 10:28 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.06.2021 |
General Announcement:
- A. Galler reminds that Interlock tests are coming this week to the hutches. D3 did not make a schedule with respect to each hutch and when.
As soon as the interlock tests are done in one instruments this will be informed to XO which in turn will communicate to the respective instrument.
- Thomas P. asks if there is a way to bridge instruments only for the tests and not for the whole two days. XO will check with TS and SRP; during the tests one can't access the hutches;
in case one has the bridge done for the two days one can also work there with the presence of the EQP.
CTRL:
- Scheduling announcement:
1. Bug in the current fast ADC devices. This is applied at LAS and will be deployed for the whole facility. Proposition for the tunnels is today afternoon;
2. uTCAs in general: time zone is set to Greenwich time; it is not a major issue but CTRL will ty to fix that;
3. CTRL will use the Influx logging by testing with the Interlock signals;
4. Legacy Read the docs will be switched OFF.
DA:
- Nothing to report.
EEE:
- Today start cabling installation at SQS.
- Fuse changing currently ongoing in SQS and to start afterwards at SCS.
VAC:
- Information for tunnels: XTD9 may open again Tuesday afternoon for other works.
XPD:
- XPD is interested to work in XTD9 when it can be opened again.
DET:
- DSSC detector activities at SQS: commissioning without beam is over and was successful. Commissioning with beam to be done on cw30.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Finished all fuse works at SPB. Few issues were found on Friday and other tests are still ongoing. Richard B. will inform other groups on the issues via XO.
- Received DAQ test request from Parthasarathy T. and shall be ready for Wednesday.
FXE:
- Issue with uTCA bug on the 10Hz trigger appeared but has been fixed.
MID:
- All fine at MID.
HED:
- All fine.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
616
|
28 May 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.05.2025 |
General Announcement:
-
CTRL:
- Investigate issue reported last Monday with MID is scheduled for next Monday.
DA:
- Not present.
EEE:
- One topic: motor in CRL in XTD2 found by FXE when doing larger steps caused issues (ZZ seems to be needed); however, with smaller steps it works fine and can be used.
A ticket is here: https://redmine.xfel.eu/issues/221334#change-751944
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Adding data space for the last two weeks of operation: a server integration shows an issue and ITDM works on it for the next days.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- This week still fine;
- Issues for the Data measured in March with timing drifts and compensation for PP-laser did not work for three weeks. Contact with LAS to be made later today.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Not present. |
607
|
28 Apr 2025, 09:44 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.04.2025 |
General Announcement:
- From PRC, Maurizio V. and Raul V. have no new things to report, apart of the HXRSS difficult tuning.
- As DRC, Luis Maia says the main points were discussed (see below).
CTRL:
- Friday heard from Desy an update on servers that hold DOOCS and uTCA has to be done, and is planned for tomorrow. In case it is not transparent, the DOOCS servers will need
to be restarted from our
side.
DA:
- Nothing to report.
EEE:
- uTCA system to be restarted in case Tuesday's intervention affects it.
VAC:
- Everything is fine.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
- Related to Tuesday's updates with JDDD: in case of issues one option is to redefine the variables in the servers, as once tested.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Everything is fine.
- Issues with lost of high level controls in the last blue week: not fully understandable why the fiber optics was lost.
SPB:
- Pulse energy during the nights is low; started with 1mJ and later dropped to ~600uJ.
FXE:
- Digitizer problem during the week was solved:
This occurred when a change of bunch number was requested; the digitizers are reconfigure via mid-layer device whenever number of pulses/frequency is updated.
It is not clear if this was the cause of the issue. DOC reboot the hardware which resume data acquisition.
Today (Monday) morning FXE noted that another mid-layer device was not displaying digitizer data properly; since the digitizers are the base class, it could be that
communication was not reinitiated after the hardware reboot. Re-instantiating the mid-layer fix the issue.
- A temperature drift on the Mono is still to be investigated and XRO is aware of it.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report; running instrument.
SXP:
- Not present. |
220
|
28 Apr 2021, 10:04 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.04.2021 |
General Announcement:
- A. Galler points to the deadline for submitting summer maintenance task list on April 30th.
- XO would like to remind instruments that in case of operation failure related to Interlocks issue, please also include the PRCs (prc@xfel.eu) on the communications.
The Photon Run Coordinators are the first contact point that can help in such situations.
- Tomasz J. asks on the reason for the water-cooling problems with SA1 PP-laser last Monday. A. Galler says the origin was a power glitch that caused the interruption of
water systems.
Raul V. says that it's also seen in some tunnel devices but because of the changes in interlock logics this worked nicely.
- Zunaira A. asks why many power glitches are happening. Andreas G. says there were this year 3 events with different causes.
Last Monday's one was a real power glitch from distribution line; the one on Easter Sunday is under investigation via an 8D report and the one last week was caused by
human error.
CTRL:
- A bug was found in the devices for HED (clown system). A test in HED will be done prior a full deployment.
DA:
- Not present.
EEE:
- Status of ADQs in SQS: Bruno F. says that it worked yesterday and suspicion is that data were saved locally. DOC and CTRL are following with this issue.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- All fine for Detectors.
ITDM:
- New feature for data migration is set – main ADC.
XRO:
- Nothing to report.
LAS:
- All lasers are UP and running.
UNSYS:
- Issue with phase shifter in SA2/cell26 this week was solved (Doocs problem).
- Waiting for the ZZ access in SA1/SA3. A. Galler says that when time window opens this will be informed.
SPB:
- Experiment is going smoothly this week.
FXE:
- Last week HED had a few issues with brig brother server when scanning the undulators. The Big Brother was setting bunches back to zero. Issue will be followed up with
machine.
MID:
- All fine at MID.
HED:
- Nothing to add; thanks to CTRL for looking after the scan tool.
- Test with Relax synchronization will be done tonight.
SCS:
- Started using the PES and recorded runs - about 35% of missing train-IDs. A. Galler says that one point of contact is via DOC.
Steffen Hauf askes how many boards were using and Laurent M. informs 4 that run in the SCS topic.
SQS:
- Apart of the shift team in quarantine, everything seems to be going fine. |
312
|
28 Mar 2022, 10:09 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.03.2022 |
General Announcement and A.O.B.:
- BTM @ FXE was triggered on Saturday afternoon and only PRC was available to come onsite and fix the issue. Different procedures will be proposed to be put in place.
- SRI conference starts this week.
CTRL:
- Issue with data loggers last week: narrowed down to an issue with expected update of Telegraph. This time it caused a trigger in the broker pileup. Solved with help from ITDM.
- Upgrade in tunnels today (already agreed; see last meeting minutes).
- Issue with MID/SPB AGIPD middle layer: requires an upgrade of framework. Currently there is no agreed time with instruments but proposal is to make it on a Monday.
DA:
- Nothing to report.
EEE:
- Busy with FXE pump commissioning.
VAC:
- Nothing to report.
- Martin Dommach, as PRC, reports that energy change in SA1 was not permitted during the weekend (costing many lost shifts in SPB) due to crosstalk with SA3;
on Saturday an event with BTM monitor in XTD9/FXE shutter happened and brought down machine. SA2 and SA3 was restored after 1 hour and SA1 after 3,5 hours.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Problem with shutter in SQS instrument laser hutch during the weekend: it could continue apart of the error state. Under investigation.
UNSYS:
- Next Monday a ZZ is requested to 1. get phase shifter SA3/cell26 working; 2. Investigate cell 25/SA3 Quad mover (horizontal movement in wrong direction).
SPB:
- Lost shifts due to crosstalk (2 night-shifts on weekend). Apart of that other shifts went well.
FXE:
- Incident on Thursday (LPD motor not working): after restarting it lost motor positions. Stefen H. says that A. Silenzi is preparing a report and updates will follow.
MID:
- Quite good week with small hiccups in data acquisition.
HED:
- HED asks when EEE plans to update uTCA; EEE advices to please contact Bruno F.
SCS:
- Issue with replaced turbo pump: new one enters in error mode after going to 400Hz. SCS is in contact with VAC; to be fixed today.
SQS:
- Nothing to report. |
494
|
28 Feb 2024, 09:41 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.02.2024 |
General Announcement:
- As PRC, Maurizio Vannoni informs that messages on the SA1 solid attenuator were sent to SPB and FXE - further info and discussions will happen offline;
also operation of XGMs in SA1 and SA2 were clarified and everything is running fine from machine side.
CTRL:
- No issues from CTRL.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- All fine with Diagnostics
DET:
- Nothing to report.
ITDM:
- Nothing to report.
- Issue with data migration: understood and fine.
XRO:
- Nothing to report from Optics.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report; thanks to everyone for enabling delivery this week.
FXE:
- Nothing to report.
MID:
- All fine.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Not present. |
304
|
28 Feb 2022, 10:35 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.02.2022 |
General Announcement:
- This week a facility development week takes place without user operation. XO thanks the groups for posting at the Operations-2022 e-log.
CTRL:
- Update on the SA3 GATT loop (middle layers devices) to be done following to find a good time slot.
DA:
- Today from 10:00-12:00 the calibration system will be down due to an update.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report concerning XPD; SCS made an enter that XGM went OFF for a day.
- Regarding PRC, the machine was running well most of the time; problem with XTD2 Air conditioning due to a fire safety flap malfunctioning happened (downtime of several hours in SA1);
on Sunday magnet power supplies at the accelerator had a problem and took few hours to restore beam delivery as it required tunnel access.
- The two-color was not created in the right order but it was corrected afterwards. The bandwidths were adjusted a few times and HED said it went well, including their spectrometer.
- XO proposes that the info on the two-color (order) can be entered in the comment section of the delivery table.
DET:
- Issue with AGIPD at SPB did not happened again and currently there is no plan for any intervention.
ITDM:
- Janusz S. says the hardware monitoring needs to be rebooted for several servers (PC layers at SCS, MID) and a short downtime will happen. Proposition is to make today if no complains appear.
- Two control servers also need maintenance and proposal is to make next week.
XRO:
- Busy with activities in this blue week (e.g. Mirror calibrations); it may require CTRL support.
LAS:
- For next week a stage in SA1 will be replaced.
- A change of operation point in SA1/SPB and S3/SQS will happen this week. SCS also need a change working point to 1.1MHz.
UNSYS:
- Tests with the Apple-X to take place this week; preparation for commissioning and lasing attempt.
SPB:
- User time largely went OK; small troubles with DAQ and detector.
FXE:
- D3 is testing components in FXE hutch today.
- CTRL, ITDM and FXE will discuss on the previously mentioned updates.
MID:
- All fine at MID.
HED:
- A ticket send to EEE is being under work.
SCS:
- XGM high voltages went down to zero and was restarted by powering on again. Cause it is not clear and will be followed up by XPD and SCS members.
SQS:
- Continuing work of moving chamber to prepare for next week beamtime. Some PLCs for the chamber have to be reset motors and other things. EEE is helping with it. |
569
|
27 Nov 2024, 09:44 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 27.11.2024 |
General Announcement:
- Issues with machine at the cold compressor happened and the restart is delayed. Expectation for the cryo stable is around 15:00 today.
Tuning will start from this point and non-standard modes probably be tuned tomorrow. Further info will be distributed during the day.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Yesterday a ZZ access related to the SA1 EPS issues; power supply was exchanged and filters and motors are operational again. Tests on the broken components will be done.
- L. Zanellato adds that cables shall not be the origin of the problem.
VAC:
- Nothing to report.
XPD:
- YAG screen for the SA1 FEL imager was placed in a new spot and is not anymore visible.
DET:
- LPD gain: follow up with CTRL is to be done.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Nothing special since Monday.
FXE:
- Nothing to report.
- Difficulties in using the beam over the weekend for extended hours: no further information.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to add.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
472
|
27 Nov 2023, 09:39 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 27.11.2023 |
General Announcement:
- User operation finished this morning 7AM for the year.
- Reminder that WMP starts on Thursday. Possible photon tunnels open on Wednesday but this still to be confirmed and e-mail will be sent.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- AGIPD at MID: issue on weekend with the bias motion. The power system for high voltage was changed but it did not cure the system.
Further investigation with the modules will happen during the WMP. MID managed to finish the beamtime.
ITDM:
- GPFS issue reported by DRC on Friday: happened only one time and did not repeat.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Remind SA3 and SA2 problems (needs ZZ): BKR will continue working and during the WMP it will be fixed.
SPB:
- Pointing/jitter issue reported by Adam R. on E-log: Romain Letrun reports that is was a drift but not much different from usual behavior and not a real problem.
FXE:
- Nothing to report.
MID:
- Could run 2 AGIPD modules during the weekend.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |
455
|
27 Sep 2023, 10:30 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 27.09.2023 |
General Announcement:
- The Winter Maintenance Task list will be sent to all groups in the course of today. Next Wednesday 04.10 Martin Doering will make a quick presentation on the list itself and take questions.
Two minor upgrades are done on it: 1. Location places are not divided in up to 3 sub-sections/levels; 2. Services needed and blocked are now condensed in two columns with color code related to the chosen
service.
The deadline for submission is October 20th.
CTRL:
- Nothing to report.
DA:
- No relevant updates.
EEE:
- Continued with work recovering systems after power cut.
- Patrick G. points that a clear information on the infrastructure of e.g. power, water, has to be made available to groups.
VAC:
- Not present.
XPD:
- Nothing to report.
- As last PRC, J. Gruenert adds that to protect CRLs in SA1 a watchdog is being tested. F. Wolff-Fabris adds that XO will discuss it with instruments.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Mikako M. says that the test of the SA1 CRL watchdog was done yesterday night; some bugs were found and a fix needed to be done. Watchdog is in principle ready but should be still tested. However, it is
not yet a fail proof device.
- Steffen H. points that safety relevant devices that are not fail proof shall not be deployed. In addition, for longer use: one may be worthwhile to implement a dedicated device.
- XO states that the tested watchdog is not going to be placed in operation now.
LAS:
- Not present.
UNSYS:
- All fine.
SPB:
- Issue with PP-laser affected preparations.
FXE:
- Issues with AMPHOS shutter were fixed yesterday and now it runs properly.
- Progress was done with night work.
MID:
- AGIPD detector issue is in DET hands.
HED:
- Nothing to report.
SCS:
- Pointing had issues (drift) being root cause for instabilities last night. Right now beam performance looks better than the last night, after BKR intervention.
SQS:
- All good.
SXP:
- Not present. |
263
|
27 Sep 2021, 10:06 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 27.09.2021 |
General Announcement:
- The subscription for the User and Operation mailing list can be found at the regular announcements. Please forward the e-mail to new colleagues who are interested in getting the meeting link.
- For any required operation that is not in the normal envelope, please keep in mind to discuss with XO in advance, to better planning and organization together with Desy-MXL / BKR colleagues.
If possible, please let XO know with weeks in advance.
CTRL:
- No major updates from CTRL to be announced.
DA:
- Quiet blue week in terms of support.
EEE:
- Nothing to report.
VAC:
- Nothing to report for VAC.
- From PRC / Raul V.: photon intensity >15mJ in SA3 seems to be real. Spectrum analysis is under way and confirms >14mJ and it may be related to the chirp studies.
XPD:
- Self-seeding studies during the weekend (13keV @ HED): seeded signal of about 400mJ - data to be analyzed.
DET:
- Nothing to report.
ITDM:
- Last week Gitlab update: some bug fixes were done during the weekend. In case of issues please let ITDM know. Gitlab is now available at the distributed link: gitlab.xfel.eu.
XRO:
- SA2 mirrors changed to platinum stripe.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID - thanks to XRO to have changed the optics.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Issues with spectral stability of PP-lasers. To be addressed by LAS. |
146
|
27 Jul 2020, 09:05 |
Andreas Galler | General | Information | Notes XO Integration Meeting 27.07.2020 |
General Announcement:
- XO discusses the need for sharing information.
CTRL:
- support calls
- small movements cause errors on MC2 motors, fis is going to be tested today and it will be communicated when ti is going to beployed
- swithcing to influxDB only logging, if not heard otherwise then this should happen this afternoon (Monday)
- switching to influxDB in SA1, SA2 and SA3 to follow as well
- notification service updated such, that only more serious messafe are being send out
DA:
EEE:
- cable installations in this week at HED, should start from tomorrow, 1.5 days (Jörn)
- few OCD calls,
- soft mono in SASE3, motor not working
- mirror
- FXE motor runs into emergency stop --> fixed in the latest PC framework, but FXE is running an earlier version
-
VAC:
XPD:
DET:
- Thursday, OCD was not scheduled, despite some calls
ITDM:
- bug for big detectors in DAQ had been addressed and should be deployed soon
- this bug seems to also affect some slow detectors
- only happens when there is no slow data added to the aggregator
- data reduction effort
- one outcome: record bunch pattern in every run
- instruments are asked to include the datasource XXX_timing
- SH comments: in the future the bunch pattern information will be made available in the pipeline
XRO:
- some recommissioning last week
- sometimes mirrors are not moving
LAS:
UNSYS:
SPB:
- good run for the first wek
- trouble with detector, not being able to record darks -> fixed next day
- issue with a device that checks correct datasources
- FXE imager EPS interlock issue
FXE:
- FXE imager EPS interlock issue
MID:
- successful week
- a couple of OCD calls
- CTRL, EEE, DET, everything solved
- AGIPD trainID offset by 1 wrt to the XGM
- karabo update --> changes are incompatible with existing scenes
- e.g. number of digits
- SH comments that it would be appreciated if those issue were reported to CTRL
HED:
- no issues
- MC2 motor update, is that going to be done today?
- SH: yes and if possible for HED, then 11:30 - 13:30 would be the preferred time window.
SCS:
- exit slits did not move --> EEE OCD could help
- SCS requests tthat components are tested before tunnels are closed
- Navitar didn't work
- focussing lens lost position
- when component software is updated/upgraded, SCS would liek to see a test
- NG comments: motor parameters are sometimes wrong
- If things need to be modified, test beforehand
SQS:
|