Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 237     Entry time: 28 Jun 2021, 10:28
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 28.06.2021 
General Announcement:
- A. Galler reminds that Interlock tests are coming this week to the hutches. D3 did not make a schedule with respect to each hutch and when. 
As soon as the interlock tests are done in one instruments this will be informed to XO which in turn will communicate to the respective instrument.
- Thomas P. asks if there is a way to bridge instruments only for the tests and not for the whole two days. XO will check with TS and SRP; during the tests one can't access the hutches; 
in case one has the bridge done for the two days one can also work there with the presence of the EQP.

CTRL:
- Scheduling announcement: 
1. Bug in the current fast ADC devices. This is applied at LAS and will be deployed for the whole facility. Proposition for the tunnels is today afternoon; 
2. uTCAs in general: time zone is set to Greenwich time; it is not a major issue but CTRL will ty to fix that; 
3. CTRL will use the Influx logging by testing with the Interlock signals; 
4. Legacy Read the docs will be switched OFF.

DA:
- Nothing to report.

EEE:
- Today start cabling installation at SQS.
- Fuse changing currently ongoing in SQS and to start afterwards at SCS.

VAC:
- Information for tunnels: XTD9 may open again Tuesday afternoon for other works.

XPD:
- XPD is interested to work in XTD9 when it can be opened again.

DET:
- DSSC detector activities at SQS: commissioning without beam is over and was successful. Commissioning with beam to be done on cw30.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Finished all fuse works at SPB. Few issues were found on Friday and other tests are still ongoing. Richard B. will inform other groups on the issues via XO.
- Received DAQ test request from Parthasarathy T. and shall be ready for Wednesday.

FXE:
- Issue with uTCA bug on the 10Hz trigger appeared but has been fixed.

MID:
- All fine at MID.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Nothing to report.