SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 616
Entry time: 28 May 2025, 09:42
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 28.05.2025 |
|
|
General Announcement:
-
CTRL:
- Investigate issue reported last Monday with MID is scheduled for next Monday.
DA:
- Not present.
EEE:
- One topic: motor in CRL in XTD2 found by FXE when doing larger steps caused issues (ZZ seems to be needed); however, with smaller steps it works fine and can be used.
A ticket is here: https://redmine.xfel.eu/issues/221334#change-751944
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Adding data space for the last two weeks of operation: a server integration shows an issue and ITDM works on it for the next days.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- This week still fine;
- Issues for the Data measured in March with timing drifts and compensation for PP-laser did not work for three weeks. Contact with LAS to be made later today.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Not present. |