Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 616     Entry time: 28 May 2025, 09:42
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 28.05.2025 
General Announcement:
-	 

CTRL:
- Investigate issue reported last Monday with MID is scheduled for next Monday.

DA:
- Not present.

EEE:
- One topic: motor in CRL in XTD2 found by FXE when doing larger steps caused issues (ZZ seems to be needed); however, with smaller steps it works fine and can be used. 
A ticket is here: https://redmine.xfel.eu/issues/221334#change-751944

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Adding data space for the last two weeks of operation: a server integration shows an issue and ITDM works on it for the next days.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- This week still fine; 
- Issues for the Data measured in March with timing drifts and compensation for PP-laser did not work for three weeks. Contact with LAS to be made later today.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
ELOG V3.1.4-7c3fd00