General Announcement:
- This week a facility development week takes place without user operation. XO thanks the groups for posting at the Operations-2022 e-log.
CTRL:
- Update on the SA3 GATT loop (middle layers devices) to be done following to find a good time slot.
DA:
- Today from 10:00-12:00 the calibration system will be down due to an update.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report concerning XPD; SCS made an enter that XGM went OFF for a day.
- Regarding PRC, the machine was running well most of the time; problem with XTD2 Air conditioning due to a fire safety flap malfunctioning happened (downtime of several hours in SA1);
on Sunday magnet power supplies at the accelerator had a problem and took few hours to restore beam delivery as it required tunnel access.
- The two-color was not created in the right order but it was corrected afterwards. The bandwidths were adjusted a few times and HED said it went well, including their spectrometer.
- XO proposes that the info on the two-color (order) can be entered in the comment section of the delivery table.
DET:
- Issue with AGIPD at SPB did not happened again and currently there is no plan for any intervention.
ITDM:
- Janusz S. says the hardware monitoring needs to be rebooted for several servers (PC layers at SCS, MID) and a short downtime will happen. Proposition is to make today if no complains appear.
- Two control servers also need maintenance and proposal is to make next week.
XRO:
- Busy with activities in this blue week (e.g. Mirror calibrations); it may require CTRL support.
LAS:
- For next week a stage in SA1 will be replaced.
- A change of operation point in SA1/SPB and S3/SQS will happen this week. SCS also need a change working point to 1.1MHz.
UNSYS:
- Tests with the Apple-X to take place this week; preparation for commissioning and lasing attempt.
SPB:
- User time largely went OK; small troubles with DAQ and detector.
FXE:
- D3 is testing components in FXE hutch today.
- CTRL, ITDM and FXE will discuss on the previously mentioned updates.
MID:
- All fine at MID.
HED:
- A ticket send to EEE is being under work.
SCS:
- XGM high voltages went down to zero and was restarted by powering on again. Cause it is not clear and will be followed up by XPD and SCS members.
SQS:
- Continuing work of moving chamber to prepare for next week beamtime. Some PLCs for the chamber have to be reset motors and other things. EEE is helping with it. |