Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 543     Entry time: 28 Aug 2024, 09:52
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 28.08.2024 
General Announcement:
- Communications Group thanks all people involved on the SRI visit. The extension of the beam delivery also worked nicely to instruments.
- As PRC, A. Galler says so far there is nothing to report or discuss for the current week.
- For next Friday the UOM will have presentations from the instruments (on stability) and from the FD activities.

CTRL:
- Nothing to report.

DA:
- All fine with DA.

EEE:
- Not present.

VAC:
- Not present.

XPD:
- No issues; preparing for the FD studies;
- ZZ in XTD2 on Friday to repair camera needed for XFLO.

DET:
- MID AGIPD HV issue on weekend: no power glitch happened that was registered from Desy systems; 
still not understood the reason but likely a local power glitch (small voltage drop (peak) was seen) and will be further tracked. 

ITDM: 
- E-mail sent yesterday for general configuration on displays.

XRO:
- Not present.

LAS:
- SA1-PPL Amphos service ongoing;
- SA3-PPL changing repetition rate for next experiments.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.
- Issues with trigger distribution systems yesterday happened but was fixed on the fly.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.