Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 560     Entry time: 28 Oct 2024, 10:03
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 28.10.2024 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Yesterday a data analysis tool had a hiccup which required to SCS more nodes reserved. Resolved.

EEE:
- DOC call to an unknown state for the HDC / pulsed magnet at HED. EEE is investigating.

VAC:
- Nothing to report.

XPD:
- Problem on Sunday with XGM; re-started by Theo and worked again.
- PES / SA3: no news; under work by J. Laksman; spectrum shall be possible but not use for 2CPP. A ZZ is planned in XTD10 for tomorrow morning (Tuesday).

DET:
- Nothing major to report;
- Issue with MID AGIPD noisy modules requiring power cycles: detector is OFF and experts are contacted.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report;
- Reply for a requested ZZ is pending. Perhaps to happen tomorrow (Tuesday).

SPB:
- Experiment wad done; data collected; Sunday night shift was cancelled.

FXE:
- LPD issues with temperature of the front ends, requiring power cycle; Also issues with data acquisitions. 
Steffen H. says one module was causing problems with data aggregators and since Saturday it was fine.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Apart of the damage problem yesterday morning, nothing to report.

SQS:
- Working in the hutch to prepare for next beamtimes.

SXP:
- Preparing for the experiment starting on Wednesday.
ELOG V3.1.4-7c3fd00