Status report after dispatch meeting 09.00, posted by Adriano Violante on 14 Jun 2019, 10:47
|
FXE
SPB/SFX
Getting ready for the shutdown. No relevant issues.
SCS |
Minutes of the Technical integration meeting 12.06.19 , posted by Adriano Violante on 12 Jun 2019, 12:40
|
FXE
SPB/SFX
SCS |
Report after dispatch meeting 09.00, posted by Adriano Violante on 07 Jun 2019, 11:53
|
FXE
SPB/SFX
few days of beamtime remaining, no particular issues
preparing for emergency power off
preparing shutdown activities |
Minutes of the Technical integration meeting 05.06.2019, posted by Gerd Wellenreuther on 05 Jun 2019, 09:59
|
FXE
SPB/SFX
few days of beamtime remaining, no particular issues
preparing for emergency power off
preparing |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 03 Jun 2019, 12:57
|
SPB/SFX
No major issues.
FXE
Tool to save motor positions is not working reliably. ==> CAS + AE have different tools on different levels. There is not automatic |
Minutes of the Technical integration meeting 29.05.19 , posted by Gerd Wellenreuther on 29 May 2019, 10:30
|
FXE
SPB/SFX
XTD2 attenuator appears to be damaged. ==> Request to VAC: is it possible to exchange the attenuators in the summer shutdown? |
Status report after dispatch meeting Monday 27.5. 09.30 , posted by Gerd Wellenreuther on 27 May 2019, 10:35
|
SPB/SFX
Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week ==> according to Adrian probably
Monday, to be confirmed with AE (Bruno + Hamed) ==> is confirmed to be today
Different GUIs were reporting varying values |
Status report after dispatch meeting Friday 24.5. 09.00, posted by Gerd Wellenreuther on 24 May 2019, 11:01
|
SPB/SFX
are working on achieving a good focus @ 6 keV, which currently is not as good as expected. ==> This is understood now, those
were higher harmonics, too many absorbers in the beam. Absorber still shows some structure, though
Digitizers are ready, have been |
Minutes of the Technical integration meeting 22.05.19, posted by Gerd Wellenreuther on 22 May 2019, 09:58
|
FXE
SPB/SFX
XTD2 attenuator appears to be damaged.
Beam at lower energies look disturbed, SPB/SFX will contact |
Status report after dispatch meeting Monday 20.5. 09.30, posted by Gerd Wellenreuther on 20 May 2019, 10:02
|
SPB/SFX
are working on achieving a good focus @ 6 keV, which currently is not as good as expected.
Digitizers are ready, have been
tested by CAS ==> to be be installed / integrated probably next week
Different GUIs were reporting varying values for STATUS on different |
Status report after dispatch meeting 09.00, posted by Adriano Violante on 17 May 2019, 10:47
|
SPB/SFX
ADC have been requested. HW should be already installed (SPB to check). BF will discuss with SPB how to proceed.
FXE
LPD is running.
SQS |
Minutes of the Technical integration meeting 15.05.19 , posted by Adriano Violante on 15 May 2019, 12:53
|
SPB/SFX
Nano KB mirrors and CSS controls are OK
Digitizers have been requested. HW needs to be installed and set up and the timeline
has to be clarified betweek BF and SPB. Not possible to have them running on short notice.
Comment from AS: Trigger Test with pulse on |
Report after dispatch meeting 09.30, posted by Adriano Violante on 13 May 2019, 11:24
|
SPB/SFX
The gear ratio of the CSS is unclear but this was already known and discussed with SPB/SFX ==> AL is working on it toghter with AE.
FXE
Karabo for Jungfrau detector has been udpated and works fine. For the LPD some issues were reported but SH commented that the problems |
Report after dispatch meeting 09.00, posted by Adriano Violante on 10 May 2019, 10:52
|
SPB/SFX
IRDa commissioning successful. A. Mancuso thanked all the people involved in the project.
The gear ratio of the
CSS is unclear but this was already known and discussed with SPB/SFX
Mirrors motors had some issues (ELMO motors), they are already been fixed.
Adam |
Minutes of the Technical integration meeting 08.05.19 , posted by Adriano Violante on 08 May 2019, 10:10
|
SPB/SFX
IRDa commissioning ongoing.
CSS. Limit switches re cabling is ongoing. For the next run the old configuration will
still be used. RB and MS will meet to make sure the system can be safely (from the component point of view) operated. ==> Solved.
Comment |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 06 May 2019, 10:20
|
SPB/SFX
IRDa commissioning ongoing.
For this week AGIPD works and re commissioning of the nanometer mirrors will be perfermed.
It is possible that support from AE will be required.
CSS. Limit switches re cabling is ongoing. For the next run the old configuration will |
Report after dispatch meeting 9:00, posted by Adriano Violante on 03 May 2019, 14:07
|
SPB/SFX
IRDa commissioning ongoing. First images have been taken with the Jungfrau detector. Possible to record using 7 to 8 memory cells,
after that there are issues. CAS is having a look.
CRL motors being tested. --> issue with a CRL motor is being addressed (connector |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 29 Apr 2019, 10:04
|
SPB/SFX
IRDa commissioning ongoing. Focus (<5um) in the second interaction region has been achieved.
CRL motors being tested.
--> issue with a CRL motor is being addressed (connector issue).
AE needs to know when Loop 9 and 10 are expected to run. SPB to check.
Jungfrau |
Report after dispatch meeting 09.00, posted by Adriano Violante on 26 Apr 2019, 12:28
|
SPB/SFX
IRD commissioning ongoing.
CRL motors being tested. --> Mechanical issue with a CRL motor is being addressed.
CSS
interlock tests with AE still ongoing.
AE needs to know when Loop 9 and 10 are expected to run. SPB to check.
Jungfrau detector: |
Minutes of the Technical integration meeting 24.04.19 , posted by Gerd Wellenreuther on 24 Apr 2019, 10:05
|
SPB/SFX
SPB/SFX is preparing for the upcoming beamtime.
CRL motors being tested. --> Still ongoing.
CSS interlock tests
being planned for tomorrow. --> Still ongoing.
AE needs to know when Loop 9 and 10 are expected to run. SPB to check.
FXE |