Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 26 of 31  Not logged in ELOG logo
Entry   Technical Integration Meeting 18.03.2020, posted by Andreas Galler on 18 Mar 2020, 09:26 


SPB:


interument parked
power cut --> someon needs to come in
NJ: what'S that status of the VAC
KC
Entry   Notes Dipatch Meeting March 16th, 2020 , posted by Frederik Wolff-Fabris on 16 Mar 2020, 09:36 
FXE:
- Beamline is in safe state;
- Minor Jungfrau calibration issues over last week. In touch with DET and EEE;
Entry   notes Dipatch Meeting March 9th, 2020, posted by Frederik Wolff-Fabris on 10 Mar 2020, 12:44 
* Users are scheduled to be here this week (4 beamlines in user runs). SPB, HED, MID report several users have cancelled the travel. Beamlines are making
mitigation plans 
to run experiments.
Entry   notes Dispatch meeting Mar 2 2020, posted by Andreas Galler on 04 Mar 2020, 08:49 
SPB:


AGIPD improvement campaign great success
EEE --> 2nd C&C worked just fine


FXE:


BTM tests successful
Johann MDL motors should be in closed loop
JF CTRL device crashed


MID:
Entry   notes Dispatch meeting Feb 24 2020, posted by Andreas Galler on 26 Feb 2020, 09:06 
SPB:


nothing to report


FXE:


not present due to group retreat


MID:
Entry   notes Dipatch Meeting Feb. 17th, 2020, posted by Frederik Wolff-Fabris on 17 Feb 2020, 12:02 
FXE:
Nothing to report: no issues;
Entry   Notes Dispatch meeting Feb 10th, 2020, posted by Frederik Wolff-Fabris on 10 Feb 2020, 10:12 
SPB: Nothing to report;

FXE:  Everything ongoing; nothing special to be reported;
Entry   notes Dispatch meeting Jan 20 2020, posted by Andreas Galler on 22 Jan 2020, 09:16 


SPB:


nothing to report


FXE:
Entry   notes Dispatch meeting Jan 13 2020, posted by Andreas Galler on 15 Jan 2020, 09:09 


SPB:


Testing coordinated movement of Mirror motors with the MC2 lib on lemo drives
optics hutch vented accidentally vented but
Entry   Report of the Technical integration meeting , posted by Adriano Violante on 08 Jan 2020, 12:36 
SPB:


Coordinatd motion for MC2 motors is going to be rolled out by EEE soon.


FXE:


No issues to report.


MID:
Entry   Report after tech. Int. meeting 09.30, posted by Adriano Violante on 18 Dec 2019, 10:06 
MID:


SDL tests ongoing. Important motors have been tested. Alignment of the mechanics with the alignment laser ongoing. Will be pumped over
Christmas.


 EEE:
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 16 Dec 2019, 09:28 
FXE:


uTCA update has been completed by EEE on Friday evening. Information will be passed to controls for the finalization.


SCS


The interlock system for the big sliding door has to be fixed. JTD is following up the issue with TS and SRP.
MT will talk
Entry   Report after Tech. Int. meeting 09.30 , posted by Adriano Violante on 11 Dec 2019, 09:54 
FXE:


New optical table will be installed today. Access to the hutch could be limited.
The new Airbox installed by D3 is colliding
with the sliding door. It might be problematic to bring the new laser table in. SRP informed. It is being followed up. 
uTCA update will
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 09 Dec 2019, 09:22 
FXE:


No major issues.
Karabo will be updated to the version 2.7.0. on Friday.
uTCA update will be done on Thursday.


SCS:


it was forgotten to involve EEE in the PLC update of the train picker in the tunnel. Now the issue is solved.


MID:
Entry   Summary of the technical integration meeting, posted by Adriano Violante on 04 Dec 2019, 14:18 
FXE


No major issues - PLCs update has been started by EEE (BB)


SCS


Hrixs and related components will be delivered on 13 and 14.01.2020. SCS is coordinating the works with TS in order to crane the chambers
Entry   affected ITDM Systems after power cut tonight, posted by Andreas Galler on 28 Nov 2019, 15:42 



XHQ.E1.092

SW-HH-AL-271 was available
SW-HH-AL-272 came back after the DL switch was back (see below, ca 09:33)
Entry   dispatch meeting Mon Nov 25 2019, posted by Andreas Galler on 27 Nov 2019, 09:25 
FXE: no issues

SPB: no issues

MID: Split & Delay line arriving on Friday, MID aims for a quick integration into instrument / beamline
Entry   Minutes of the Technical integration meeting 20.11.19 , posted by Adriano Violante on 20 Nov 2019, 10:12 
​FXE


Wille was asked by D3 to pull new cables for the Pandora in FXE on 19.11.. This was not known by FXE. Will be discussed with
Safety/DNölle.
Mono was fixed and is now ready for commissioning with beam


​SPB/SFX
Entry   Status report after tech. Int. Meeting 9.30, posted by Adriano Violante on 13 Nov 2019, 10:12 
​FXE


Radiation tests ongoing.
EEE informs that the PLC drawings will be exchanged in the WS


SPB/SFX

​SCS
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 12 Nov 2019, 09:49 
​FXE



FXE – radiation tests and LPD tests planned for this week. Small issues with the scan tools are
being addressed.



SPB/SFX
ELOG V3.1.4-7c3fd00